Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 3) 2024
I, Lachlan Bickley, being the person occupying the position of GEMS Regulator, make the following instrument.
Dated 19 November 2024
Lachlan Bickley
GEMS Regulator
Contents
1 Name
2 Commencement
3 Authority
4 Definitions
5 Exemption
6 Conditions of exemption
7 Repeal
Schedule 1—Exemption
This instrument is the Greenhouse and Energy Minimum Standards (Exemption) Instrument (No. 3) 2024.
This instrument commences on the day after it is registered on the Federal Register of Legislation.
This instrument is made under subsection 37(1) of the Greenhouse and Energy Minimum Standards Act 2012.
In this instrument:
Act means the Greenhouse and Energy Minimum Standards Act 2012.
Determination means the Greenhouse and Energy Minimum Standards (Household Refrigerating Appliances) Determination 2019.
exempt model: see section 5.
The model specified in clause 1 of Schedule 1 (the exempt model) is exempt from the requirements of the Determination as described at clause 2 of Schedule 1 with respect to the supplies of the exempt model specified at clause 3 of Schedule 1.
6 Conditions of exemption
There are no conditions specified under subsection 37(2) of the Act.
This instrument is repealed 12 months after coming into effect.
1 Specification of exempt model
| Brand | Model Number |
1 | Liebherr | SBNes 4265 |
2 Requirements from which model is exempt
Requirements of the Determination as follows:
GEMS level requirements | The identified model is exempted from the GEMS level requirements, which are set out in Section 8 of the Determination. |
GEMS labelling requirements | The identified model is exempted from the GEMS labelling requirements, which are set out in Section 9 of the Determination. |
GEMS other requirements | The identified model is exempted from the GEMS other requirements, which are set out in Section 10 of the Determination. |
3 Supplies to which the exemption applies
This exemption applies in relation to any supplies of model SBNes 4265 with the specifications set out in clause 1 of this Schedule.