Greenhouse and Energy Minimum Standards (Exemption) Instrument (No.3) 2016

 

Greenhouse and Energy Minimum Standards Act 2012

 

 

 

 

I, Joann Wilkie, being the person occupying the position of GEMS Regulator, make this instrument under subsections 37(1) and (2) of the Greenhouse and Energy Minimum Standards Act 2012.

 

 

 

 

 

 

 

 

 

 

Dated:  28 July 2016

 

 

 

JOANN WILKIE

______________________________

Joann Wilkie

GEMS Regulator

1                             Name of Instrument

This Instrument is the Greenhouse and Energy Minimum Standards (Exemption) Instrument (No.3) 2016.

2                             Authority

This Instrument is made under subsections 37(1) and (2) of the Greenhouse and Energy Minimum Standards Act 2012.

3                             Commencement

This Instrument commences the day after it is registered.

4                             Definitions

In this Instrument:

 

Act means the Greenhouse and Energy Minimum Standards Act 2012.

 

Determination means the Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2012.

 

Exempt Model: see section5 of the Instrument.

Note:  Several other words and expressions used in this instrument have the meaning given by section 5 of the Act. For example:

5                             Exemption

The model specified in clause 1 of the Schedule (the Exempt Model) is exempt from the requirements of the Determination as described at clause 2 of the Schedule with respect to the supplies of the exempt model specified at clause 3 of the Schedule.

6                             Conditions of exemption

The conditions at clause 4 of the Schedule are specified for the purposes of subsection 37(2) of the Act.

 

Note: Subsection 37(2) of the Act provides that the exemption may specify conditions to which the exemption is subject. Subsection 37(3) provides that a person must comply with a condition of an exemption to the extent that it applies to the person.

Schedule  Exemption and conditions of exemption

Part 1 Exemption

1                             Specification of exempt models

Brand

Model No.

Description of motor

Bronzoni Motori Electtrici s.r.l.

R003A-999

9.2kW 2P 132M

 

2                             Requirements from which model is exempt

Requirements of the Determination as follows:

 

GEMS level requirements (section 6)

The model is exempted from the energy use requirements mentioned in section 6 of the Determination.

3                             Supplies to which the exemption applies

This exemption only applies in relation to the supply of three phase cage induction motors with the specifications set out in clause 1 above.

4                             Specification of conditions of exemption

The exemption is subject to the condition that the supply of the products specified in clause 1 above is restricted to the Ichthys LNG Onshore Project located at Bladin Point in Darwin.