Federal Register of Legislation - Australian Government

Primary content

Standards/Other as made
This instrument exempts the models specified in the Schedule attached to the instrument from the requirements of section 6 of the Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2012.
Administered by: Environment and Energy
Registered 03 Mar 2017
Tabling HistoryDate
Tabled HR20-Mar-2017
Tabled Senate20-Mar-2017

 

 

 

Greenhouse and Energy Minimum Standards (Exemption) Instrument (No.1) 2017

 

Greenhouse and Energy Minimum Standards Act 2012

 

 

 

 

I, Michelle Croker, being the person occupying the position of GEMS Regulator, make this instrument under subsections 37(1) and (2) of the Greenhouse and Energy Minimum Standards Act 2012.

 

 

 

 

 

 

 

 

 

 

Dated 24 February 2017

 

 

 

 

______________________________

Michelle Croker

GEMS Regulator


1                   Name of Instrument

This Instrument is the Greenhouse and Energy Minimum Standards (Exemption) Instrument (No.1) 2017.

2                   Authority

This Instrument is made under subsections 37(1) and (2) of the Greenhouse and Energy Minimum Standards Act 2012.

3                   Commencement

This Instrument commences the day after it is registered.

4                   Definitions

In this Instrument:

 

Act means the Greenhouse and Energy Minimum Standards Act 2012.

 

Determination means the Greenhouse and Energy Minimum Standards (Three Phase Cage Induction Motors) Determination 2012.

 

Exempt Model: see section 5 of the Instrument.

Note:                Several other words and expressions used in this instrument have the meaning given by section 5 of the Act. For example:

·         GEMS

·         GEMS determination

·         GEMS labelling requirements

·         GEMS level requirements

·         model

·         model identifier

·         product classes

·         supply

5                   Exemption

The model specified in clause 1 of the Schedule (the Exempt Model) is exempt from the requirements of the Determination as described at clause 2 of the Schedule with respect to the supplies of the exempt model specified at clause 3 of the Schedule.

6                   Conditions of exemption

The conditions at clause 4 of the Schedule are specified for the purposes of subsection 37(2) of the Act.

 

Note:               Subsection 37(2) of the Act provides that the exemption may specify conditions to which the exemption is subject. Subsection 37(3) provides that a person must comply with a condition of an exemption to the extent that it applies to the person.

Schedule                  Exemption and conditions of exemption

Part 1      Exemption

1                   Specification of exempt models

 

Brand

Model No.

Description of motor

Bronzoni Motori Electtrici s.r.l.

R003A-999

4kW 2P 132M

 

Bronzoni Motori Electtrici s.r.l.

R003A-999

15 kW 2P 132M

 

2                   Requirements from which model is exempt

Requirements of the Determination as follows:

 

GEMS level requirements (section 6)

The models are exempted from the energy use requirements mentioned in section 6 of the Determination.

3                   Supplies to which the exemption applies

This exemption only applies in relation to the supply of three phase cage induction motors with the specifications set out in clause 1 above.

4                   Specification of conditions of exemption

The exemption is subject to the condition that the supply of the products specified in clause 1 above is restricted to the Ichthys LNG Onshore Project located at Bladin Point in Darwin.