Federal Register of Legislation - Australian Government

Primary content

SR 2004 No. 322 Regulations as made
These Regulations amend the Renewable Energy (Electricity) Regulations 2001
Administered by: PMC (DCC)
General Comments: This instrument was backcaptured in accordance with Section 36 of the Legislative Instruments Act 2003
Registered 01 Jan 2005
Tabling HistoryDate
Tabled HR29-Nov-2004
Tabled Senate29-Nov-2004
Gazetted 25 Nov 2004
Date of repeal 09 Aug 2013
Repealed by Industry, Innovation, Climate Change, Science, Research and Tertiary Education (Spent and Redundant Instruments) Repeal Regulation 2013
Table of contents.

Renewable Energy (Electricity) Amendment Regulations 2004 (No. 1)1

Statutory Rules 2004 No. 3222

I, PHILIP MICHAEL JEFFERY, Governor-General of the Commonwealth of Australia, acting with the advice of the Federal Executive Council, make the following Regulations under the Renewable Energy (Electricity) Act 2000.

Dated 18 November 2004

P. M. JEFFERY

Governor-General

By His Excellency’s Command

IAN CAMPBELL


Contents

                        1     Name of Regulations                                                       2

                        2     Commencement                                                              2

                        3     Amendment of Renewable Energy (Electricity) Regulations 2001        2

Schedule 1              Amendments                                                                 3

Schedule 2              Renumbering of Part 2 of Schedule 7 of Renewable Energy (Electricity) Regulations 2001                                                                                    47

 


1              Name of Regulations

                These Regulations are the Renewable Energy (Electricity) Amendment Regulations 2004 (No. 1).

2              Commencement

                These Regulations commence on the date of their notification in the Gazette.

3              Amendment of Renewable Energy (Electricity) Regulations 2001

         (1)   Schedule 1 amends the Renewable Energy (Electricity) Regulations 2001.

         (2)   Schedule 2 amends the Renewable Energy (Electricity) Regulations 2001, as amended by Schedule 1.


Schedule 1        Amendments

(regulation 3)

  

[1]           Sub-subparagraph 3 (3) (b) (ii) (B)

omit

as in force at the commencement of this sub-subparagraph.

insert

as in force on 29 May 2003.

[2]           Subregulation 3 (4)

omit

[3]           Paragraph 20 (1) (a)

substitute

                (a)    for a hydro-electric system with a kW rating of no more than 6.4 kW — for the amount calculated by multiplying 0.00095 by the rated power output of the system, measured in kW, multiplied by:

                          (i)    4 000; or

                         (ii)    the number of hours each year of hydro resource availability if those hours are greater than 4 000.

[4]           Paragraph 20 (1) (c)

substitute

                (c)    for a wind turbine — for the amount calculated by multiplying 0.00095 by the rated power output of the system, measured in kW, multiplied by:

                          (i)    2 000; or

                         (ii)    the number of hours each year of wind resource availability if those hours are greater than 2 000.

[5]           Subregulation 20 (3)

omit

For subparagraph (1) (a) (i),

insert

For subparagraph (1) (a) (ii),

[6]           Schedule 4

omit

[7]           Schedule 6

omit

[8]           Schedule 7, Part 2, before item 1

insert

1A

Arrow

Arrow 250 Litre

15 January 2004

23

24

23

18

1B

Arrow

Arrow 315 Litre

15 January 2004

22

24

22

17

[9]           Schedule 7, Part 2, after item 20

insert

20A

Beasley

Close coupled 3301T

19 February 2004

26

26

26

18

20B

Beasley

Close coupled 3302T

19 February 2004

32

29

32

27

20C

Beasley

Close coupled 3303T

19 February 2004

37

35

37

31

20D

Beasley

Close coupled 3302T RG

19 February 2004

38

44

38

31

20E

Beasley

Close coupled 4803T

19 February 2004

45

46

45

35

20F

Beasley

Close coupled 4804T

19 February 2004

49

48

49

39

20G

Beasley

Close coupled 3303T RG

19 February 2004

45

48

45

39

20H

Beasley

Close coupled 4803T RG

19 February 2004

45

48

45

39

20I

Beasley

Close coupled 4804T RG

19 February 2004

49

50

49

44

[10]         Schedule 7, Part 2, after item 36

insert

36A

Beasley

Split system 2502T

19 February 2004

29

30

29

25

36B

Beasley

Split system 2503T

19 February 2004

32

31

32

28

36C

Beasley

Split system 3152T

19 February 2004

29

29

29

24

36D

Beasley

Split system 3153T

19 February 2004

32

31

32

28

36E

Beasley

Split system 2502T RG

19 February 2004

40

41

40

35

36F

Beasley

Split system 2503T RG

19 February 2004

44

45

44

41

36G

Beasley

Split system 3152T RG

19 February 2004

41

42

41

35

36H

Beasley

Split system 3153T RG

19 February 2004

46

45

46

41

[11]         Schedule 7, Part 2, after item 40

insert

40A

Beasley

Split system M 2503T

19 February 2004

36

34

36

31

40B

Beasley

Split system M 3152T

19 February 2004

34

33

34

28

40C

Beasley

Split system M 3153T

19 February 2004

37

34

37

32

[12]         Schedule 7, Part 2, after item 43

insert

43A

Beasley

Split system NS 2502T

19 February 2004

29

30

29

25

43B

Beasley

Split system NS 3152T

19 February 2004

29

29

29

24

43C

Beasley

Split system NS 3153T

19 February 2004

32

31

32

28

[13]         Schedule 7, Part 2, after item 112

insert

112A

DUX

2FN20Y2A

11 February 2004

40

41

40

34

112B

DUX

2FN20Y2B

11 February 2004

35

37

35

30

112C

DUX

2FN20Z2A

11 February 2004

35

37

35

30

112D

DUX

2FN20Z2B

11 February 2004

31

33

31

27

112E

DUX

2FN24Y2A

11 February 2004

40

41

40

34

112F

DUX

2FN24Y2B

11 February 2004

35

37

35

30

112G

DUX

2FN24Z2A

11 February 2004

35

37

35

30

112H

DUX

2FN24Z2B

11 February 2004

31

33

31

27

112I

DUX

2FL24Y2A

11 February 2004

40

41

40

34

112J

DUX

3FN24Y2A

11 February 2004

40

41

40

34

112K

DUX

3FN24Y2B

11 February 2004

36

38

36

31

112L

DUX

3FN24Z2A

11 February 2004

35

37

35

29

112M

DUX

3FN24Z2B

11 February 2004

32

34

32

27

112N

DUX

3FL24Y2A

11 February 2004

40

41

40

34

112O

DUX

4FN26Y3A

11 February 2004

47

46

47

42

112P

DUX

4FN26Y3B

11 February 2004

42

43

42

37

112Q

DUX

4FL26Y3A

11 February 2004

47

46

47

42

112R

DUX

2T236X2A

23 February 2004

35

34

35

31

112S

DUX

2T248X2A

23 February 2004

35

34

35

31

[14]         Schedule 7, Part 2, after item 114

insert

114A

DUX

3T236X2A

23 February 2004

35

34

35

32

114B

DUX

3T248X2A

23 February 2004

35

34

35

32

[15]         Schedule 7, Part 2, after item 117

insert

117A

DUX

4T236X3A

23 February 2004

49

48

49

44

117B

DUX

4T248X3A

23 February 2004

49

48

49

44

[16]         Schedule 7, Part 2, after item 118

insert

118A

DUX

2TN24X2A

11 February 2004

41

42

41

36

118B

DUX

2TN24X2B

11 February 2004

37

39

37

32

118C

DUX

3TN24X2A

11 February 2004

41

42

41

36

118D

DUX

3TN24X2B

11 February 2004

38

39

38

32

118E

DUX

4TN26X3A

11 February 2004

48

47

48

44

118F

DUX

4TN26X3B

11 February 2004

44

44

44

39

118G

DUX

HP2FS

23 February 2004

24

22

24

22

118H

DUX

HP2TS

23 February 2004

24

22

24

22

118I

DUX

HP3FS

23 February 2004

23

21

23

22

118J

DUX

HP3TS

23 February 2004

23

21

23

22

118K

DUX

HP4FS

23 February 2004

31

30

31

30

118L

DUX

HP4TS

23 February 2004

31

30

31

30

[17]         Schedule 7, Part 2, after item 174

insert

174A

Edwards

GT250/2 Australis

12 February 2004

28

28

28

24

174B

Edwards

GT250/2 Australis GS

12 February 2004

34

36

34

29

174C

Edwards

GT250/2 Titan

12 February 2004

31

30

31

24

174D

Edwards

GT250/2 Titan GS

12 February 2004

38

40

38

33

174E

Edwards

GT250/2 Titan Plus

12 February 2004

31

30

31

24

174F

Edwards

GT250/2 Titan Plus GS

12 February 2004

38

40

38

33

174G

Edwards

GT250/3 Australis

12 February 2004

31

30

31

23

174H

Edwards

GT250/3 Australis GS

12 February 2004

39

41

39

34

174I

Edwards

GT250/3 Titan

12 February 2004

35

33

35

28

174J

Edwards

GT250/3 Titan GS

12 February 2004

44

44

44

38

174K

Edwards

GT250/3 Titan Plus

12 February 2004

35

33

35

28

174L

Edwards

GT250/3 Titan Plus GS

12 February 2004

44

44

44

38

174M

Edwards

GT315/2 Australis

12 February 2004

29

29

29

21

174N

Edwards

GT315/2 Australis GS

12 February 2004

33

36

33

28

174O

Edwards

GT315/2 Titan

12 February 2004

32

31

32

25

174P

Edwards

GT315/2 Titan GS

12 February 2004

38

39

38

33

174Q

Edwards

GT315/2 Titan Plus

12 February 2004

32

31

32

25

174R

Edwards

GT315/2 Titan Plus GS

12 February 2004

38

39

38

33

174S

Edwards

GT315/3 Australis

12 February 2004

32

31

32

24

174T

Edwards

GT315/3 Australis GS

12 February 2004

39

41

39

34

174U

Edwards

GT315/3 Titan

12 February 2004

36

33

36

29

174V

Edwards

GT315/3 Titan GS

12 February 2004

44

44

44

39

174W

Edwards

GT315/3 Titan Plus

12 February 2004

36

33

36

29

174X

Edwards

GT315/3 Titan Plus GS

12 February 2004

44

44

44

39

[18]         Schedule 7, Part 2, after item 300

insert

300A

Quantum

270ACH-134

1 March 2004

25

21

25

25

300B

Quantum

340ACH-134

1 March 2004

25

21

25

25

[19]         Schedule 7, Part 2, item 308

substitute

308

Rheem

111315/1SCT

12 December 2003 to 25 November 2004

14

14

14

10

308A

Rheem

111315/1SCT

25 November 2004

17

18

17

13

[20]         Schedule 7, Part 2, item 310

substitute

310

Rheem

111315/2SCT

12 December 2003 to 25 November 2004

21

22

21

16

310A

Rheem

111315/2SCT

25 November 2004

25

26

25

20

[21]         Schedule 7, Part 2, item 312

substitute

312

Rheem

111315/3SCT

12 December 2003 to 25 November 2004

25

25

25

20

312A

Rheem

111315/3SCT

25 November 2004

29

29

29

24

[22]         Schedule 7, Part 2, item 314

substitute

314

Rheem

111400/1SCT

12 December 2003 to 25 November 2004

14

17

14

7

314A

Rheem

111400/1SCT

25 November 2004

18

20

18

13

[23]         Schedule 7, Part 2, item 316

substitute

316

Rheem

111400/2SCT

12 December 2003 to 25 November 2004

25

28

25

19

316A

Rheem

111400/2SCT

25 November 2004

30

33

30

23

[24]         Schedule 7, Part 2, item 318

substitute

318

Rheem

111400/3SCT

12 December 2003 to 25 November 2004

31

34

31

24

318A

Rheem

111400/3SCT

25 November 2004

36

38

36

29

[25]         Schedule 7, Part 2, item 320

substitute

320

Rheem

111400/4SCT

12 December 2003 to 25 November 2004

34

37

34

28

320A

Rheem

111400/4SCT

25 November 2004

40

41

40

33

[26]         Schedule 7, Part 2, item 328

substitute

328

Rheem

411315/1SCT

12 December 2003 to 25 November 2004

14

14

14

10

328A

Rheem

411315/1SCT

25 November 2004

17

18

17

13

[27]         Schedule 7, Part 2, item 329

substitute

329

Rheem

411315/2SCT

12 December 2003 to 25 November 2004

21

22

21

16

329A

Rheem

411315/2SCT

25 November 2004

25

26

25

20

[28]         Schedule 7, Part 2, item 332

substitute

332

Rheem

411315/3SCT

12 December 2003 to 25 November 2004

25

25

25

20

332A

Rheem

411315/3SCT

25 November 2004

29

29

29

24

[29]         Schedule 7, Part 2, item 334

substitute

334

Rheem

411400/1SCT

12 December 2003 to 25 November 2004

14

17

14

7

334A

Rheem

411400/1SCT

25 November 2004

18

20

18

13

[30]         Schedule 7, Part 2, item 336

substitute

336

Rheem

411400/2SCT

12 December 2003 to 25 November 2004

25

28

25

19

336A

Rheem

411400/2SCT

25 November 2004

30

33

30

23

[31]         Schedule 7, Part 2, item 338

substitute

338

Rheem

411400/3SCT

12 December 2003 to 25 November 2004

31

34

31

24

338A

Rheem

411400/3SCT

25 November 2004

36

38

36

29

[32]         Schedule 7, Part 2, item 340

substitute

340

Rheem

411400/4SCT

12 December 2003 to 25 November 2004

34

37

34

28

340A

Rheem

411400/4SCT

25 November 2004

40

41

40

33

[33]         Schedule 7, Part 2, item 348

substitute

348

Rheem

162315/1SCT

12 December 2003 to 25 November 2004

14

14

14

10

348A

Rheem

162315/1SCT

25 November 2004

16

17

16

12

[34]         Schedule 7, Part 2, item 350

substitute

350

Rheem

162315/2SCT

12 December 2003 to 25 November 2004

21

22

21

16

350A

Rheem

162315/2SCT

25 November 2004

25

26

25

19

[35]         Schedule 7, Part 2, item 352

substitute

352

Rheem

162315/3SCT

12 December 2003 to 25 November 2004

25

25

25

20

352A

Rheem

162315/3SCT

25 November 2004

29

29

29

23

[36]         Schedule 7, Part 2, item 354

substitute

354

Rheem

162400/1SCT

12 December 2003 to 25 November 2004

14

17

14

7

354A

Rheem

162400/1SCT

25 November 2004

18

20

18

13

[37]         Schedule 7, Part 2, item 356

substitute

356

Rheem

162400/2SCT

12 December 2003 to 25 November 2004

25

28

25

19

356A

Rheem

162400/2SCT

25 November 2004

30

33

30

23

[38]         Schedule 7, Part 2, item 358

substitute

358

Rheem

162400/3SCT

12 December 2003 to 25 November 2004

31

34

31

24

358A

Rheem

162400/3SCT

25 November 2004

36

38

36

29

[39]         Schedule 7, Part 2, item 360

substitute

360

Rheem

162400/4SCT

12 December 2003 to 25 November 2004

34

37

34

28

360A

Rheem

162400/4SCT

25 November 2004

40

41

40

33

[40]         Schedule 7, Part 2, item 368

substitute

368

Rheem

462315/1SCT

12 December 2003 to 25 November 2004

14

14

14

10

368A

Rheem

462315/1SCT

25 November 2004

16

17

16

12

[41]         Schedule 7, Part 2, item 370

substitute

370

Rheem

462315/2SCT

12 December 2003 to 25 November 2004

21

22

21

16

370A

Rheem

462315/2SCT

25 November 2004

25

26

25

19

[42]         Schedule 7, Part 2, item 372

substitute

372

Rheem

462315/3SCT

12 December 2003 to 25 November 2004

25

25

25

20

372A

Rheem

462315/3SCT

25 November 2004

29

29

29

23

[43]         Schedule 7, Part 2, item 374

substitute

374

Rheem

462400/1SCT

12 December 2003 to 25 November 2004

14

17

14

7

374A

Rheem

462400/1SCT

25 November 2004

18

20

18

13

[44]         Schedule 7, Part 2, item 376

substitute

376

Rheem

462400/2SCT

12 December 2003 to 25 November 2004

25

28

25

19

376A

Rheem

462400/2SCT

25 November 2004

30

33

30

23

[45]         Schedule 7, Part 2, item 378

substitute

378

Rheem

462400/3SCT

12 December 2003 to 25 November 2004

31

34

31

24

378A

Rheem

462400/3SCT

25 November 2004

36

38

36

29

[46]         Schedule 7, Part 2, item 380

substitute

380

Rheem

462400/4SCT

12 December 2003 to 25 November 2004

34

37

34

28

380A

Rheem

462400/4SCT

25 November 2004

40

41

40

33

[47]         Schedule 7, Part 2, items 392 to 395

substitute

392

Rheem

511340/1NPT

2 July 2003 to 25 November 2004

20

21

20

16

392A

Rheem

511340/1NPT

25 November 2004

20

20

20

15

393

Rheem

511340/2NPT

7 June 2002 to 25 November 2004

29

29

29

24

393A

Rheem

511340/2NPT

25 November 2004

29

29

29

23

394

Rheem

511340/3NPT

2 July 2003 to 25 November 2004

32

32

32

28

394A

Rheem

511340/3NPT

25 November 2004

32

31

32

27

395

Rheem

511430/1NPT

2 July 2003 to 25 November 2004

21

23

21

16

395A

Rheem

511430/1NPT

25 November 2004

20

23

20

15

[48]         Schedule 7, Part 2, items 397 and 398

substitute

397

Rheem

511430/3NPT

7 June 2002 to 25 November 2004

39

42

39

32

397A

Rheem

511430/3NPT

25 November 2004

39

41

39

32

398

Rheem

511430/4NPT

2 July 2003 to 25 November 2004

43

44

43

36

398A

Rheem

511430/4NPT

25 November 2004

42

44

42

35

[49]         Schedule 7, Part 2, items 405 to 408

substitute

405

Rheem

541340/1NPT

2 July 2003 to 25 November 2004

20

21

20

16

405A

Rheem

541340/1NPT

25 November 2004

20

20

20

15

406

Rheem

541340/2NPT

7 June 2002 to 25 November 2004

29

29

29

24

406A

Rheem

541340/2NPT

25 November 2004

29

29

29

23

407

Rheem

541340/3NPT

2 July 2003 to 25 November 2004

32

32

32

28

407A

Rheem

541340/3NPT

25 November 2004

32

31

32

27

408

Rheem

541430/1NPT

2 July 2003 to 25 November 2004

21

23

21

16

408A

Rheem

541430/1NPT

25 November 2004

20

23

20

15

[50]         Schedule 7, Part 2, items 410 and 411

substitute

410

Rheem

541430/3NPT

7 June 2002 to 25 November 2004

39

42

39

32

410A

Rheem

541430/3NPT

25 November 2004

39

41

39

32

411

Rheem

541430/4NPT

2 July 2003 to 25 November 2004

43

44

43

36

411A

Rheem

541430/4NPT

25 November 2004

42

44

42

35

411B

Rheem

111250/2SBT

17 February 2004

25

26

25

20

411C

Rheem

111250/3SBT

17 February 2004

29

29

29

24

411D

Rheem

111315/2SBT

17 February 2004

26

27

26

21

411E

Rheem

111315/3SBT

17 February 2004

30

30

30

25

411F

Rheem

111400/2SBT

17 February 2004

31

34

31

24

411G

Rheem

111400/3SBT

17 February 2004

38

40

38

31

411H

Rheem

111400/4SBT

17 February 2004

41

42

41

35

411I

Rheem

162250/2SBT

17 February 2004

27

27

27

21

411J

Rheem

162250/3SBT

17 February 2004

30

30

30

25

411K

Rheem

162315/2SBT

17 February 2004

26

27

26

21

411L

Rheem

162315/3SBT

17 February 2004

30

30

30

25

411M

Rheem

162400/2SBT

17 February 2004

31

34

31

24

411N

Rheem

162400/3SBT

17 February 2004

37

40

37

31

411O

Rheem

162400/4SBT

17 February 2004

41

42

41

34

411P

Rheem

411250/2SBT

17 February 2004

25

26

25

20

411Q

Rheem

411250/3SBT

17 February 2004

29

29

29

24

411R

Rheem

411315/2SBT

17 February 2004

26

27

26

21

411S

Rheem

411315/3SBT

17 February 2004

30

30

30

25

411T

Rheem

411400/2SBT

17 February 2004

31

34

31

24

411U

Rheem

411400/3SBT

17 February 2004

38

40

38

31

411V

Rheem

411400/4SBT

17 February 2004

41

42

41

35

411W

Rheem

462250/2SBT

17 February 2004

27

27

27

21

411X

Rheem

462250/3SBT

17 February 2004

30

30

30

25

411Y

Rheem

462315/2SBT

17 February 2004

26

27

26

21

411Z

Rheem

462315/3SBT

17 February 2004

30

30

30

25

411AA

Rheem

462400/2SBT

17 February 2004

31

34

31

24

411AB

Rheem

462400/3SBT

17 February 2004

37

40

37

31

411AC

Rheem

462400/4SBT

17 February 2004

41

42

41

34

[51]         Schedule 7, Part 2, items 415 to 417

substitute

415

Rheem

511340/1SBT

17 July 2003 to 25 November 2004

21

22

21

16

415A

Rheem

511340/1SBT

25 November 2004

21

21

21

16

416

Rheem

511340/2SBT

17 July 2003 to 25 November 2004

31

30

31

25

416A

Rheem

511340/2SBT

25 November 2004

30

30

30

25

417

Rheem

511340/3SBT

17 July 2003 to 25 November 2004

35

33

35

30

417A

Rheem

511340/3SBT

25 November 2004

34

33

34

29

[52]         Schedule 7, Part 2, item 420

substitute

420

Rheem

511430/3SBT

17 July 2003 to 25 November 2004

42

44

42

35

420A

Rheem

511430/3SBT

25 November 2004

42

43

42

35

[53]         Schedule 7, Part 2, items 424 to 426

substitute

424

Rheem

531260/1SBT

17 July 2003 to 25 November 2004

22

19

22

14

424A

Rheem

531260/1SBT

25 November 2004

18

19

18

14

425

Rheem

531260/2SBT

17 July 2003 to 25 November 2004

28

27

28

22

425A

Rheem

531260/2SBT

25 November 2004

27

27

27

22

426

Rheem

531260/3SBT

17 July 2003 to 25 November 2004

31

29

31

25

426A

Rheem

531260/3SBT

25 November 2004

30

29

30

25

[54]         Schedule 7, Part 2, items 430 to 432

substitute

430

Rheem

541340/1SBT

17 July 2003 to 25 November 2004

21

22

21

16

430A

Rheem

541340/1SBT

25 November 2004

21

21

21

16

431

Rheem

541340/2SBT

17 July 2003 to 25 November 2004

31

30

31

25

431A

Rheem

541340/2SBT

25 November 2004

30

30

30

25

432

Rheem

541340/3SBT

17 July 2003 to 25 November 2004

35

33

35

30

432A

Rheem

541340/3SBT

25 November 2004

34

33

34

29

[55]         Schedule 7, Part 2, item 435

substitute

435

Rheem

541430/3SBT

17 July 2003 to 25 November 2004

42

44

42

35

435A

Rheem

541430/3SBT

25 November 2004

42

43

42

35

[56]         Schedule 7, Part 2, items 437 to 439

substitute

437

Rheem

581260/1SBT

17 July 2003 to 25 November 2004

22

19

22

14

437A

Rheem

581260/1SBT

25 November 2004

18

19

18

14

438

Rheem

581260/2SBT

17 July 2003 to 25 November 2004

28

27

28

22

438A

Rheem

581260/2SBT

25 November 2004

27

27

27

22

439

Rheem

581260/3SBT

17 July 2003 to 25 November 2004

31

29

31

25

439A

Rheem

581260/3SBT

25 November 2004

30

29

30

25

[57]         Schedule 7, Part 2, items 444 and 445

substitute

444

Rheem

511340/1SCT

12 December 2003 to 25 November 2004

22

21

22

16

444A

Rheem

511340/1SCT

25 November 2004

20

21

20

16

445

Rheem

511340/2SCT

17 April 2001 to 25 November 2004

30

30

30

25

445A

Rheem

511340/2SCT

25 November 2004

29

29

29

24

[58]         Schedule 7, Part 2, item 447

substitute

447

Rheem

511340/3SCT

12 December 2003 to 25 November 2004

34

33

34

29

447A

Rheem

511340/3SCT

25 November 2004

34

32

34

28

[59]         Schedule 7, Part 2, items 449 to 452

substitute

449

Rheem

511430/1SCT

12 December 2003 to 25 November 2004

21

23

21

16

449A

Rheem

511430/1SCT

25 November 2004

20

23

20

15

450

Rheem

511430/2SCT

9 April 2002 to 25 November 2004

34

37

34

27

450A

Rheem

511430/2SCT

25 November 2004

34

37

34

26

451

Rheem

511430/3SCT

9 April 2002 to 25 November 2004

41

43

41

34

451A

Rheem

511430/3SCT

25 November 2004

40

42

40

33

452

Rheem

511430/4SCT

9 April 2002 to 25 November 2004

45

46

45

38

452A

Rheem

511430/4SCT

25 November 2004

44

45

44

37

[60]         Schedule 7, Part 2, items 457 and 458

substitute

457

Rheem

541340/1SCT

12 December 2003 to 25 November 2004

22

21

22

16

457A

Rheem

541340/1SCT

25 November 2004

20

21

20

16

458

Rheem

541340/2SCT

17 April 2001 to 25 November 2004

30

30

30

25

458A

Rheem

541340/2SCT

25 November 2004

29

29

29

24

[61]         Schedule 7, Part 2, item 460

substitute

460

Rheem

541340/3SCT

12 December 2003 to 25 November 2004

34

33

34

29

460A

Rheem

541340/3SCT

25 November 2004

34

32

34

28

[62]         Schedule 7, Part 2, items 462 to 465

substitute

462

Rheem

541430/1SCT

12 December 2003 to 25 November 2004

21

23

21

16

462A

Rheem

541430/1SCT

25 November 2004

20

23

20

15

463

Rheem

541430/2SCT

9 April 2002 to 25 November 2004

34

37

34

27

463A

Rheem

541430/2SCT

25 November 2004

34

37

34

26

464

Rheem

541430/3SCT

9 April 2002 to 25 November 2004

41

43

41

34

464A

Rheem

541430/3SCT

25 November 2004

40

42

40

33

465

Rheem

541430/4SCT

9 April 2002 to 25 November 2004

45

46

45

38

465A

Rheem

541430/4SCT

25 November 2004

44

45

44

37

[63]         Schedule 7, Part 2, after item 482

insert

482A

Rheem

551275

17 February 2004

27

22

27

27

[64]         Schedule 7, Part 2, after item 490

insert

490A

Saxon

26002

1 March 2004

25

21

25

25

490B

Saxon

26012

1 March 2004

25

21

25

25

[65]         Schedule 7, Part 2, after item 492

insert

492A

Solahart

275HAV00

11 December 2003

26

21

26

26

492B

Solahart

275HAV36

11 December 2003

27

22

27

27

[66]         Schedule 7, Part 2, after item 494

insert

494A

Solahart

275HAX00

11 December 2003

26

21

26

26

[67]         Schedule 7, Part 2, item 497 and 498

substitute

497

Solahart

273SFV

7 June 2002

33

32

33

28

[68]         Schedule 7, Part 2, item 499

substitute

499

Solahart

341SFV

12 December 2003 to 25 November 2004

22

21

22

16

499A

Solahart

341SFV

25 November 2004

20

21

20

16

[69]         Schedule 7, Part 2, items 501 and 502

substitute

501

Solahart

342SFV

7 June 2002 to 25 November 2004

30

30

30

25

501A

Solahart

342SFV

25 November 2004

29

29

29

24

502

Solahart

343SFV

12 December 2003 to 25 November 2004

34

33

34

29

502A

Solahart

343SFV

25 November 2004

34

32

34

28

[70]         Schedule 7, Part 2, items 505 to 508

substitute

505

Solahart

431SFV

12 December 2003 to 25 November 2004

21

23

21

16

505A

Solahart

431SFV

25 November 2004

20

23

20

15

506

Solahart

432SFV

7 June 2002 to 25 November 2004

34

37

34

27

506A

Solahart

432SFV

25 November 2004

34

37

34

26

507

Solahart

433SFV

7 June 2002 to 25 November 2004

41

43

41

34

507A

Solahart

433SFV

25 November 2004

40

42

40

33

508

Solahart

434SFV

7 June 2002 to 25 November 2004

45

46

45

38

508A

Solahart

434SFV

25 November 2004

44

45

44

37

[71]         Schedule 7, Part 2, items 513 and 514

substitute

513

Solahart

341SFX

12 December 2003 to 25 November 2004

22

21

22

16

513A

Solahart

341SFX

25 November 2004

20

21

20

16

514

Solahart

342SFX

7 June 2002 to 25 November 2004

30

30

30

25

514A

Solahart

342SFX

25 November 2004

29

29

29

24

[72]         Schedule 7, Part 2, item 516

substitute

516

Solahart

343SFX

12 December 2003 to 25 November 2004

34

33

34

29

516A

Solahart

343SFX

25 November 2004

34

32

34

28

[73]         Schedule 7, Part 2, items 518 to 521

substitute

518

Solahart

431SFX

12 December 2003 to 25 November 2004

21

23

21

16

518A

Solahart

431SFX

25 November 2004

20

23

20

15

519

Solahart

432SFX

7 June 2002 to 25 November 2004

34

37

34

27

519A

Solahart

432SFX

25 November 2004

34

37

34

26

520

Solahart

433SFX

7 June 2002 to 25 November 2004

41

43

41

34

520A

Solahart

433SFX

25 November 2004

40

42

40

33

521

Solahart

434SFX

7 June 2002 to 25 November 2004

45

46

45

38

521A

Solahart

434SFX

25 November 2004

44

45

44

37

[74]         Schedule 7, Part 2, items 535 to 537

substitute

535

Solahart

341SBV

22 August 2003 to 25 November 2004

21

22

21

16

535A

Solahart

341SBV

25 November 2004

21

21

21

16

536

Solahart

342SBV

22 August 2003 to 25 November 2004

31

30

31

25

536A

Solahart

342SBV

25 November 2004

30

30

30

25

537

Solahart

343SBV

22 August 2003 to 25 November 2004

35

33

35

30

537A

Solahart

343SBV

25 November 2004

34

33

34

29

[75]         Schedule 7, Part 2, item 540

substitute

540

Solahart

433SBV

22 August 2003 to 25 November 2004

42

44

42

35

540A

Solahart

433SBV

25 November 2004

42

43

42

35

[76]         Schedule 7, Part 2, items 545 to 547

substitute

545

Solahart

341SBX

22 August 2003 to 25 November 2004

21

22

21

16

545A

Solahart

341SBX

25 November 2004

21

21

21

16

546

Solahart

342SBX

22 August 2003 to 25 November 2004

31

30

31

25

546A

Solahart

342SBX

25 November 2004

30

30

30

25

547

Solahart

343SBX

22 August 2003 to 25 November 2004

35

33

35

30

547A

Solahart

343SBX

25 November 2004

34

33

34

29

[77]         Schedule 7, Part 2, item 550

substitute

550

Solahart

433SBX

22 August 2003 to 25 November 2004

42

44

42

35

550A

Solahart

433SBX

25 November 2004

42

43

42

35

[78]         Schedule 7, Part 2, after item 554

insert

554A

Solahart

341SLV

18 February 2004

20

20

20

15

[79]         Schedule 7, Part 2, items 555 and 556

substitute

555

Solahart

342SLV

22 August 2003 to 25 November 2004

29

29

29

24

555A

Solahart

342SLV

25 November 2004

29

29

29

23

556

Solahart

343SLV

22 August 2003 to 25 November 2004

32

32

32

28

556A

Solahart

343SLV

25 November 2004

32

31

32

27

556B

Solahart

431SLV

18 February 2004

20

23

20

15

[80]         Schedule 7, Part 2, items 558 and 559

substitute

558

Solahart

433SLV

22 August 2003 to 25 November 2004

39

42

39

32

558A

Solahart

433SLV

25 November 2004

39

41

39

32

559

Solahart

434SLV

22 August 2003 to 25 November 2004

43

44

43

36

559A

Solahart

434SLV

25 November 2004

42

44

42

35

[81]         Schedule 7, Part 2, after item 562

insert

562A

Solahart

341SLX

18 February 2004

20

20

20

15

[82]         Schedule 7, Part 2, items 563 and 564

substitute

563

Solahart

342SLX

22 August 2003 to 25 November 2004

29

29

29

24

563A

Solahart

342SLX

25 November 2004

29

29

29

23

564

Solahart

343SLX

22 August 2003 to 25 November 2004

32

32

32

28

564A

Solahart

343SLX

25 November 2004

32

31

32

27

564B

Solahart

431SLX

18 February 2004

20

23

20

15

[83]         Schedule 7, Part 2, items 566 and 567

substitute

566

Solahart

433SLX

22 August 2003 to 25 November 2004

39

42

39

32

566A

Solahart

433SLX

25 November 2004

39

41

39

32

567

Solahart

434SLX

22 August 2003 to 25 November 2004

43

44

43

36

567A

Solahart

434SLX

25 November 2004

42

44

42

35

[84]         Schedule 7, Part 2, item 650

substitute

650

Solahart

303KFBCXII

22 August 2003 to 25 November 2004

43

45

43

37

650A

Solahart

303KFBCXII

25 November 2004

36

34

36

31

[85]         Schedule 7, Part 2, item 655

substitute

655

Solahart

303KFBCXIIn

22 August 2003 to 25 November 2004

43

45

43

37

655A

Solahart

303KFBCXIIn

25 November 2004

36

34

36

31

[86]         Schedule 7, Part 2, item 666

substitute

666

Solahart

302KF Free Heat

22 August 2003 to 25 November 2004

33

32

33

25

666A

Solahart

302KF Free Heat

25 November 2004

33

32

33

28

[87]         Schedule 7, Part 2, item 670

substitute

670

Solahart

302KFn Free Heat

22 August 2003 to 25 November 2004

33

32

33

25

670A

Solahart

302KFn Free Heat

25 November 2004

33

32

33

28

[88]         Schedule 7, Part 2, items 698 to 703

substitute

698

Solahart

SBV261

22 August 2003 to 25 November 2004

22

19

22

14

698A

Solahart

SBV261

25 November 2004

18

19

18

14

699

Solahart

SBV262

22 August 2003 to 25 November 2004

28

27

28

22

699A

Solahart

SBV262

25 November 2004

27

27

27

22

700

Solahart

SBV263

22 August 2003 to 25 November 2004

31

29

31

25

700A

Solahart

SBV263

25 November 2004

30

29

30

25

701

Solahart

SBX261

22 August 2003 to 25 November 2004

22

19

22

14

701A

Solahart

SBX261

25 November 2004

18

19

18

14

702

Solahart

SBX262

22 August 2003 to 25 November 2004

28

27

28

22

702A

Solahart

SBX262

25 November 2004

27

27

27

22

703

Solahart

SBX263

22 August 2003 to 25 November 2004

31

29

31

25

703A

Solahart

SBX263

25 November 2004

30

29

30

25

703B

Solahart

SLV261

18 February 2004

17

18

17

13

[89]         Schedule 7, Part 2, after item 705

insert

705A

Solahart

SLX261

18 February 2004

17

18

17

13

[90]         Schedule 7, Part 2, after item 712

insert

712A

Solaire Solar

Solaire 3302

15 April 2003

31

32

31

25

712B

Solaire Solar

Solarie 3302 RG

15 April 2003

35

42

35

29

712C

Solaire Solar

Solaire 4803

15 April 2003

42

45

42

34

712D

Solaire Solar

Solaire 4803 RG

15 April 2003

43

48

43

38

[91]         Schedule 7, Part 2, after item 719

insert

719A

Solitaire

304/O/G/BS

23 February 2004

40

41

40

34

719B

Solitaire

304LC/O/G/BS

23 February 2004

38

40

38

33

719C

Solitaire

306/O/BS

23 February 2004

35

34

35

31

719D

Solitaire

306LC/O/BS

23 February 2004

34

33

34

29

719E

Solitaire

306SP/O/BS

23 February 2004

36

34

36

32

719F

Solitaire

315/10/HP/S

23 February 2004

23

21

23

22

719G

Solitaire

315/HP/S

23 February 2004

23

21

23

22

719H

Solitaire

400/10/HP/S

23 February 2004

31

30

31

30

719I

Solitaire

400/HP/S

23 February 2004

31

30

31

30

[92]         Schedule 7, Part 2, after item 725

insert

725A

Solitaire

3154/C/G/2BC

23 February 2004

37

39

37

32

725B

Solitaire

3154/C/G/2LC

23 February 2004

35

37

35

30

[93]         Schedule 7, Part 2, after item 727

insert

727A

Solitaire

3154/O/G/2BC

23 February 2004

40

42

40

35

727B

Solitaire

3154/O/G/2LC

23 February 2004

39

41

39

34

[94]         Schedule 7, Part 2, after item 729

insert

729A

Solitaire

3154/C/36/2SSB

23 February 2004

28

29

28

25

729B

Solitaire

3154/C/48/2SSB

23 February 2004

28

29

28

25

729C

Solitaire

3154/C/36/U10

23 February 2004

32

31

32

28

729D

Solitaire

3154/C/48/U10

23 February 2004

32

31

32

28

[95]         Schedule 7, Part 2, after item 731

insert

731A

Solitaire

3154/O/36/2SSB

23 February 2004

32

32

32

29

731B

Solitaire

3154/O/48/2SSB

23 February 2004

32

32

32

29

731C

Solitaire

3154/C/G/U10

23 February 2004

39

41

39

34

731D

Solitaire

3154/O/36/U10

23 February 2004

35

33

35

32

731E

Solitaire

3154/O/48/U10

23 February 2004

35

33

35

32

731F

Solitaire

3154/O/G/U10

23 February 2004

43

43

43

37

[96]         Schedule 7, Part 2, after item 735

insert

735A

Solitaire

3156/10/C/36/2SSB

23 February 2004

31

31

31

27

735B

Solitaire

3156/10/C/48/2SSB

23 February 2004

31

31

31

27

735C

Solitaire

3156/10/O/36/2SSB

23 February 2004

35

34

35

32

735D

Solitaire

3156/10/O/48/2SSB

23 February 2004

35

34

35

32

735E

Solitaire

3156/C/36/2SSB

23 February 2004

31

31

31

27

735F

Solitaire

3156/C/48/2SSB

23 February 2004

31

31

31

27

735G

Solitaire

3156/C/G/2LC

23 February 2004

41

42

41

35

735H

Solitaire

3156/O/36/2SSB

23 February 2004

35

34

35

32

735I

Solitaire

3156/O/48/2SSB

23 February 2004

35

34

35

32

735J

Solitaire

3156/O/G/2LC

23 February 2004

46

46

46

41

[97]         Schedule 7, Part 2, after item 741

insert

741A

Solitaire

4006/C/36/2SSB

23 February 2004

36

40

36

31

741B

Solitaire

4006/C/48/2SSB

23 February 2004

36

40

36

31

741C

Solitaire

4006/C/36/U10

23 February 2004

44

45

44

38

741D

Solitaire

4006/C/48/U10

23 February 2004

44

45

44

38

741E

Solitaire

4006/C/G/2BC

23 February 2004

43

44

43

38

741F

Solitaire

4006/C/G/2LC

23 February 2004

41

42

41

35

741G

Solitaire

4006/C/G/U10

23 February 2004

45

45

45

40

741H

Solitaire

4006/O/36/U10

23 February 2004

49

48

49

45

741I

Solitaire

4006/O/G/U10

23 February 2004

49

48

49

45

741J

Solitaire

4006/O/48/U10

23 February 2004

49

48

49

45

741K

Solitaire

4006/O/36/2SSB

23 February 2004

44

46

44

39

741L

Solitaire

4006/O/48/2SSB

23 February 2004

44

46

44

39

741M

Solitaire

4006/O/G/2BC

23 February 2004

46

46

46

41

[98]         Schedule 7, Part 2, after item 743

insert

743A

Solitaire

4006/O/G/2LC

23 February 2004

46

46

46

41

[99]         Schedule 7, Part 2, after item 747

insert

747A

Solitaire

3154/10/C/36/2SSB

23 February 2004

28

29

28

25

747B

Solitaire

3154/10/C/36/U10

23 February 2004

32

31

32

28

747C

Solitaire

3154/10/C/48/U10

23 February 2004

32

31

32

28

747D

Solitaire

3154/10/C/G/2LC

23 February 2004

35

37

35

30

747E

Solitaire

3154/10/C/G/2SP

23 February 2004

39

40

39

34

747F

Solitaire

3154/10/C/G/U10

23 February 2004

39

41

39

34

747G

Solitaire

3154/10/O/G/2LC

23 February 2004

39

41

39

34

[100]       Schedule 7, Part 2, after item 749

insert

749A

Solitaire

4006/10/O/36/2SSB

23 February 2004

44

46

44

39

749B

Solitaire

4006/10/O/48/2SSB

23 February 2004

44

46

44

39

749C

Solitaire

4006/10/O/G/2LC

23 February 2004

46

46

46

41

[101]       Schedule 7, Part 2, after item 751

insert

751A

Solitaire

3154/10/C/48/2SSB

23 February 2004

28

29

28

25

751B

Solitaire

3154/10/O/36/2SSB

23 February 2004

32

32

32

29

751C

Solitaire

3154/10/O/48/2SSB

23 February 2004

32

32

32

29

[102]       Schedule 7, Part 2, after item 753

insert

753A

Solitaire

4006/10/C/36/2SSB

23 February 2004

36

40

36

31

753B

Solitaire

4006/10/C/48/2SSB

23 February 2004

36

40

36

31

753C

Solitaire

4006/10/C/36/U10

23 February 2004

44

45

44

38

753D

Solitaire

4006/10/C/48/U10

23 February 2004

44

45

44

38

753E

Solitaire

4006/10/C/G/2SP

23 February 2004

45

45

45

40

753F

Solitaire

4006/10/C/G/U10

23 February 2004

45

45

45

40

[103]       Schedule 7, Part 2, after item 761

insert

761A

Sunstar

Arrow 250 Litre

15 January 2004

23

24

23

18

761B

Sunstar

Arrow 315 Litre

15 January 2004

22

24

22

17

761C

Sunstar Solar Solutions

Arrow 250 Litre

15 January 2004

23

24

23

18

761D

Sunstar Solar Solutions

Arrow 315 Litre

15 January 2004

22

24

22

17

[104]       Schedule 7, Part 2, item 773

substitute

773

Supa-Sola

FR440 Supa-Sola GS

7 July 2003 to 25 November 2004

47

45

47

42

773A

Supa-Sola

FR440 Supa-Sola GS

25 November 2004

44

43

44

39

773B

Arrow

Arrow 160 Litre

15 January 2004

16

17

16

12

[105]       Schedule 7, Part 2, after item 780

insert

780A

Beasley

Close coupled 1801T

19 February 2004

19

19

19

14

780B

Beasley

Close coupled 1802T

19 February 2004

23

22

23

19

780C

Beasley

Close coupled 1801T RG

19 February 2004

26

28

26

20

780D

Beasley

Close coupled 1802T RG

19 February 2004

33

34

33

29

[106]       Schedule 7, Part 2, after item 788

insert

788A

Beasley

Split system 1602T

19 February 2004

20

20

20

16

788B

Beasley

Split system 1601T RG

19 February 2004

26

26

26

22

788C

Beasley

Split system 1602T RG

19 February 2004

33

30

33

29

[107]       Schedule 7, Part 2, after item 966

insert

966A

Solahart

221KF Free Heat

18 February 2004

19

19

19

15

966B

Solahart

222KF Free Heat

18 February 2004

23

22

23

19

[108]       Schedule 7, Part 2, after item 969

insert

969A

Solahart

221KFn Free Heat

18 February 2004

19

19

19

15

969B

Solahart

222KFn Free Heat

18 February 2004

23

22

23

19

[109]       Schedule 7, Part 2, after item 971

insert

971A

Solahart

221J Free Heat

18 February 2004

17

18

17

13

971B

Solahart

222J Free Heat

18 February 2004

21

21

21

17

[110]       Schedule 7, Part 2, after item 973

insert

973A

Solahart

221Jn Free Heat

18 February 2004

17

18

17

13

973B

Solahart

222Jn Free Heat

18 February 2004

21

21

21

17

973C

Solaire Solar

Solaire 1801

15 April 2003

17

18

17

14

973D

Solaire Solar

Solaire 1801 RG

15 April 2003

24

26

24

19

[111]       Schedule 7, Part 2, after item 975

insert

975A

Solitaire

250/10/HP/S

23 February 2004

24

22

24

22

975B

Solitaire

250/HP/S

23 February 2004

24

22

24

22

[112]       Schedule 7, Part 2, after item 983

insert

983A

Solitaire

2504/C/36/2SSB

23 February 2004

25

27

25

22

983B

Solitaire

2504/C/48/2SSB

23 February 2004

25

27

25

22

983C

Solitaire

2504/C/36/U10

23 February 2004

31

30

31

26

983D

Solitaire

2504/C/48/U10

23 February 2004

31

30

31

26

983E

Solitaire

2504/C/G/2BC

23 February 2004

36

38

36

31

983F

Solitaire

2504/C/G/2LC

23 February 2004

34

36

34

29

983G

Solitaire

2504/C/G/U10

23 February 2004

39

40

39

32

[113]       Schedule 7, Part 2, after item 987

insert

987A

Solitaire

2504/O/36/2SSB

23 February 2004

32

32

32

29

987B

Solitaire

2504/O/48/2SSB

23 February 2004

32

32

32

29

987C

Solitaire

2504/O/36/U10

23 February 2004

35

33

35

31

987D

Solitaire

2504/O/48/U10

23 February 2004

35

33

35

31

987E

Solitaire

2504/O/G/2BC

23 February 2004

41

42

41

35

987F

Solitaire

2504/O/G/2LC

23 February 2004

39

41

39

34

987G

Solitaire

2504/O/G/U10

23 February 2004

43

44

43

37

[114]       Schedule 7, Part 2, after item 991

insert

991A

Solitaire

2504/10/C/36/2SSB

23 February 2004

25

27

25

22

991B

Solitaire

2504/10/C/48/2SSB

23 February 2004

25

27

25

22

991C

Solitaire

2504/10/C/36/U10

23 February 2004

31

30

31

26

991D

Solitaire

2504/10/C/48/U10

23 February 2004

31

30

31

26

991E

Solitaire

2504/10/C/G/2SP

23 February 2004

38

40

38

33

991F

Solitaire

2504/10/C/G/U10

23 February 2004

39

40

39

32

991G

Solitaire

2504/10/O/36/2SSB

23 February 2004

32

32

32

29

991H

Solitaire

2504/10/O/48/2SSB

23 February 2004

32

32

32

29

991I

Solitaire

2504/10/O/G/2LC

23 February 2004

39

41

39

34

[115]       Schedule 7, Part 2, after item 992

insert

992A

Sunstar

Arrow 160 Litre

15 January 2004

16

17

16

12

992B

Sunstar Solar Solutions

Arrow 160 Litre

15 January 2004

16

17

16

12

[116]       Schedule 7, Part 2, items 996, 997 and 998

substitute

996

Supa-Sola

D180 Supa-Sola GS

7 July 2003 to 25 November 2004

23

21

23

20

996A

Supa-Sola

D180 Supa-Sola GS

25 November 2004

20

19

20

17

997

Supa-Sola

FR180 Supa-Sola

7 July 2003 to 25 November 2004

19

20

19

15

997A

Supa-Sola

FR180 Supa-Sola

25 November 2004

15

16

15

12

998

Supa-Sola

FR180 Supa-Sola GS

7 July 2003 to 25 November 2004

23

21

23

19

998A

Supa-Sola

FR180 Supa-Sola GS

25 November 2004

19

18

19

17

[117]       Schedule 7, Part 2, after item 1274

insert

1274A

Quantum

340TIH-134

1 March 2004

114

103

114

110

1274B

Rheem

511340/5SBT

17 February 2004

59

63

59

46

1274C

Rheem

511340/6SBT

17 February 2004

74

78

74

60

1274D

Rheem

511340/7SBT

17 February 2004

90

93

90

74

1274E

Rheem

511340/8SBT

17 February 2004

106

108

106

88

1274F

Rheem

511340/9SBT

17 February 2004

122

123

122

102

1274G

Rheem

511340/10SBT

17 February 2004

138

138

138

116

1274H

Rheem

511340/11SBT

17 February 2004

154

153

154

130

1274I

Rheem

511340/12SBT

17 February 2004

170

168

170

144

1274J

Rheem

511340/13SBT

17 February 2004

186

183

186

158

1274K

Rheem

511340/14SBT

17 February 2004

202

198

202

172

1274L

Rheem

511340/15SBT

17 February 2004

218

213

218

186

1274M

Rheem

511340/16SBT

17 February 2004

233

227

233

199

1274N

Rheem

511340/18SBT

17 February 2004

263

256

263

225

1274O

Rheem

511340/20SBT

17 February 2004

293

286

293

251

1274P

Rheem

511340/21SBT

17 February 2004

308

300

308

265

1274Q

Rheem

511340/22SBT

17 February 2004

323

315

323

278

1274R

Rheem

511340/24SBT

17 February 2004

354

344

354

304

1274S

Rheem

511340/25SBT

17 February 2004

369

359

369

317

1274T

Rheem

511340/26SBT

17 February 2004

384

373

384

330

1274U

Rheem

511340/27SBT

17 February 2004

399

388

399

344

1274V

Rheem

511340/28SBT

17 February 2004

414

403

414

357

1274W

Rheem

511340/30SBT

17 February 2004

445

432

445

383

1274X

Rheem

511340/32SBT

17 February 2004

475

461

475

409

1274Y

Rheem

511340/33SBT

17 February 2004

490

476

490

423

1274Z

Rheem

511340/35SBT

17 February 2004

520

505

520

449

1274AA

Rheem

511340/36SBT

17 February 2004

535

520

535

462

1274AB

Rheem

511340/39SBT

17 February 2004

581

564

581

502

1274AC

Rheem

511340/40SBT

17 February 2004

596

578

596

515

1274AD

Rheem

511340/42SBT

17 February 2004

626

608

626

541

1274AE

Rheem

511340/44SBT

17 February 2004

656

637

656

567

1274AF

Rheem

511340/45SBT

17 February 2004

672

652

672

581

1274AG

Rheem

511340/48SBT

17 February 2004

717

695

717

620

1274AH

Rheem

511340/49SBT

17 February 2004

732

710

732

633

1274AI

Rheem

511340/50SBT

17 February 2004

747

725

747

647

1274AJ

Rheem

511340/52SBT

17 February 2004

778

754

778

673

1274AK

Rheem

511340/54SBT

17 February 2004

808

783

808

699

1274AL

Rheem

511340/55SBT

17 February 2004

823

798

823

713

1274AM

Rheem

511340/56SBT

17 February 2004

838

812

838

726

1274AN

Rheem

511340/60SBT

17 February 2004

899

871

899

779

1274AO

Rheem

511340/63SBT

17 February 2004

945

915

945

818

1274AP

Rheem

511340/64SBT

17 February 2004

960

930

960

831

1274AQ

Rheem

511340/65SBT

17 February 2004

975

944

975

845

1274AR

Rheem

511340/66SBT

17 February 2004

990

959

990

858

1274AS

Rheem

511340/70SBT

17 February 2004

1051

1017

1051

911

1274AT

Rheem

511340/72SBT

17 February 2004

1081

1047

1081

937

1274AU

Rheem

511340/75SBT

17 February 2004

1127

1091

1127

977

1274AV

Rheem

511340/78SBT

17 February 2004

1171

1134

1171

1014

1274AW

Rheem

511340/80SBT

17 February 2004

1200

1163

1200

1040

1274AX

Rheem

511340/81SBT

17 February 2004

1215

1177

1215

1052

1274AY

Rheem

511340/84SBT

17 February 2004

1259

1221

1259

1090

1274AZ

Rheem

511340/88SBT

17 February 2004

1317

1279

1317

1140

1274BA

Rheem

511340/90SBT

17 February 2004

1347

1308

1347

1166

1274BB

Rheem

511430/6SBT

17 February 2004

77

80

77

62

1274BC

Rheem

511430/7SBT

17 February 2004

93

95

93

76

1274BD

Rheem

511430/8SBT

17 February 2004

109

110

109

90

1274BE

Rheem

511430/9SBT

17 February 2004

125

125

125

104

1274BF

Rheem

511430/10SBT

17 February 2004

141

140

141

118

1274BG

Rheem

511430/11SBT

17 February 2004

157

155

157

132

1274BH

Rheem

511430/12SBT

17 February 2004

173

170

173

146

1274BI

Rheem

511430/13SBT

17 February 2004

189

185

189

160

1274BJ

Rheem

511430/14SBT

17 February 2004

205

200

205

174

1274BK

Rheem

511430/15SBT

17 February 2004

221

215

221

189

1274BL

Rheem

511430/16SBT

17 February 2004

236

229

236

202

1274BM

Rheem

511430/18SBT

17 February 2004

266

259

266

228

1274BN

Rheem

511430/20SBT

17 February 2004

297

288

297

255

1274BO

Rheem