COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Esso Australia Resources Pty Ltd

(ABN 62 091 829 819)

 

BHP Billiton (Bass Strait) Pty. Ltd.

(ABN 29 004 228 004)

 

 for the variation of Pipeline Licence VIC/PL21 in the offshore area of Victoria, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA

OFFSHORE PETROLEUM JOINT AUTHORITY

Approved for publication: ________________
Date:			________________

 

 

 

 


 

APPLICATION FOR VARIATION OF

PIPELINE LICENCE VIC/PL21

 

 The application seeks to effect the following administrative amendments to the licence:

 

Pipeline Duration and Interpretation

 

1.      Vary the duration of the licence from a fixed term to an indefinite term to reflect legislative amendment.

2.      Where possible, remove references in the licence to the former Designated Authorities or the ‘Director, Energy Division of the Department of Industry, Technology and Resources.’

 

Route of the Pipeline

 

3.      Add the as-Constructed Pipeline Co-ordinates.

 

4.      Add the Route Map.

 

Specifications

 

5.      Update the pipeline design details and parameters, including reference to relevant Australian Standards, to reflect the as-constructed Perch to Dolphin Pipeline.

As-Constructed Pipeline Co-ordinates

 

The route of the Perch to Dolphin pipeline is described in the table below, and displayed in the map below, commencing at the flange immediately downstream of the Last Valve Off (LVO) on the Perch platform before proceeding through two major deflections, and commencing at the flange immediately downstream of the Last Valve Off (LVO) on the Dolphin platform before proceeding to the Dolphin tee connection, followed by a straight line with minor deflections to a point which intersects the boundary of Commonwealth offshore waters at the 3 nautical mile limit. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

ID

DESCRIPTION

EASTING

NORTHING

1

LVO Perch Manifold

528102.35

5730967.54

2

Inflection Point 01

528098.33

5730963.35

3

Inflection Point 02

528094.04

5730967.53

4

Inflection Point 03

528081.75

5730952.46

5

Inflection Point 04

528072.77

5730965.39

6

Inflection Point 05

528071.65

5730974.82

7

Inflection Point 06

527415.13

5731936.61

8

Inflection Point 07

533815.81

5739200.92

9

LVO Dolphin Manifold

532920.41

5740041.56

10

Inflection Point 08

532917.01

5740037.94

11

Inflection Point 09

532912.67

5740041.88

12

Inflection Point 10

532905.62

5740035.54

13

DPA300 T Connection

532905.56

5740030.90

14

3 Nautical Mile Limit Crossing

522271.50

5749838.54

15

Shoreline Crossing

518173.00

5753695.52

Coordinate set above based on GDA94 / MGA Zone 55, survey of pipeline centreline.

 

 

Map depicting route of pipeline Licence VIC/PL21 commencing at Perch platform and terminating at Commonwealth / Victorian territorial sea boundary.