Administered by: Industry, Innovation and Science
Published Date 06 May 2019

 

COMMONWEALTH OF AUSTRALIA

 

Section 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Esso Australia Resources Pty Ltd

(ABN 62 091 829 819)

 

BHP Billiton Petroleum (Bass Strait) Pty. Ltd.

(ABN 29 004 228 004)

 

for a variation of Pipeline Licence VIC/PL2 in the offshore area of Victoria, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

 

 

 

 


 

 

APPLICATION FOR VARIATION OF

PIPELINE LICENCE VIC/PL2

 

The application seeks to effect the following administrative amendments to the licence:

 

Pipeline Duration, Interpretation and Conditions

 

1.      Vary the duration of the licence from a fixed term to an indefinite term to reflect legislative amendment.

2.      Where possible, remove references in the licence to the former Designated Authorities or the ‘said Director’.

 

Route of the Pipeline

 

3.      Add the As-Constructed Pipeline Co-ordinates.

 

4.      Add the Route Map.

 

Specifications and Further Conditions

 

5.      Update the pipeline design details and parameters, including reference to relevant Australian Standards, to reflect the as-constructed Marlin to Shore Gas Pipeline.

6.      Delete conditions relating to pipeline specifications, performance, reporting and approval requirements that are no longer required or have been superseded under the current regulatory regime (and are regulated by the National Offshore Petroleum Safety and Environmental Management Authority).

 

As-Constructed Pipeline Co-ordinates

 

The route of the pipeline is described in the table below, and displayed in the map below, commencing at the LVO at the Marlin A platform and terminates at the shore crossing. The pipeline travels from Marlin, which has a depth of approximately 59m, to the mean low water tide level shore crossing at Loch Sport. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

ID

DESCRIPTION

EASTING

NORTHING

1

LVO Marlin A Platform

606,836

5,767,902

2

Crossing the MLA 150-WKF Fuel Gas Pipeline

606,739

5,767,883

3

Crossing the MLB450 Gas Pipeline

606,079

5,767,902

4

Crossing the SNA250 Oil Pipeline

604,749

5,768,418

5

Shore Crossing at Loch Sport

561,249

5,793,586

Coordinate set above is based on GDA94 / MGA Zone 55, survey of pipeline centreline.


 

Title: VICPL2 MLA500 Marlin to Shore Route Map - Description: Map showing route of the MLA500 Marlin to Shore pipeline.