COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, GRAEME ALBERT WATERS, the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority, hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy Ltd.

(ABN 63 005 482 986)

 

Mitsui E&P Australia Pty Ltd

(ACN 108 437 529)

 

 for the variation of Pipeline Licence WA-28-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

GRAEME ALBERT WATERS

TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 


 

APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-28-PL

 

ROUTE OF THE PIPELINE

 

The route of the system of pipes is described in the table hereunder and displayed in the attached map (Attachment 1), commencing at the tie-in flange to the Laverda high boost multiphase pump (MPP) station and ending at the tie-in flange to the Remote Emergency Shutdown Valve (RESDV) at the Ngujima Yin FPSO. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

16” Rigid Production Pipeline

POINT DESCRIPTION

KP (km)

Easting (m) - MGA50

Northing (m) - MGA50

Bend Radius

1

Start Point: TIE IN FLANGE TO MPP/11" FLEXIBLE START

-

173 121

7617047

 

2

11" FLEXIBLE END

-

173 042

7 617 094

 

3

CENTRE OF LAVERDA FLET

-

173 040

7 617 095

 

4

START OF 16” RIGID PIPELINE

0.000

173 049

7 617 099

 

5

TANGENT POINT (TP) 1

2.910

175 772

7 618 124

 

3100

6

INTERSECTION POINT (IP) 1

-

176 891

7 618 545

7

TP 2

5.191

177 437

7 619 608

8

TP 3

9.346

179 337

7 623 303

 

3100

9

IP 2

-

179 931

7 624 460

10

TP 4

11.809

181 173

7 624 846

11

CENTRE OF CIMATTI ILTA

16.237

185 402

7 626 161

-

12

TP 5

16.689

185 833

7 626 295

 

3100

13

IP 3

-

186 442

7 626 485

14

TP 6

17.947

186 927

7 626 899

15

TP 7

20.051

188 527

7 628 266

 

2550

16

IP 4

-

189 222

7 628 860

17

TP 8

21.807

190 135

7 628 878

18

TP 9

26.356

194 684

7 628 963

 

2550

19

IP 5

-

195 393

7 628 977

20

TP 10

27.740

196 007

7 628 622

21

16” RIGID PIPELINE END POINT

28.555

196 713

7 628 215

-

22

CENTRE OF NGY FLET

-

196 723

7 628 209

-

23

14" FLEXIBLE FLOWLINE START POINT

-

196 721

7 628 209

-

24

14" FLEXIBLE FLOWLINE END POINT

-

196 265

7 627 473

-

25

10" FLEXIBLE
RISER START POINT

-

196 265

7 627 473

-

26

10" FLEXIBLE RISER END POINT

-

195 974

7 626 968

-

27

END POINT: TIE IN FLANGE TO RESDV AT NGY FPSO

-

195 974

7 626 968

-