Federal Register of Legislation - Australian Government

Primary content

Bookmark

This gazette
Administered by: Industry, Innovation and Science
Published Date 03 Jul 2017

 

COMMONWEALTH OF AUSTRALIA

 

Section 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, TERRENCE JOHN MCKINLEY, Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority, hereby give notice pursuant to section 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Woodside Energy Ltd.

(ABN 63 005 482 986)

 

BHP Billiton Petroleum (North West Shelf) Pty. Ltd.

(ABN 41 004 514 489)

 

BP Developments Australia Pty. Ltd.

(ABN 54 081 102 856)

 

Chevron Australia Pty Ltd

(ABN 29 086 197 757)

 

Japan Australia LNG (MIMI) Pty Ltd

(ABN 18 006 303 180)

 

Shell Australia Pty Ltd

(ABN 14 009 663 576)

 

for a variation of Pipeline Licence WA-27-PL in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

 

TERRENCE JOHN MCKINLEY

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–WESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 

APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-27-PL

 

 

GWF-2 Pipeline

 

Varied Pipeline Route Map

 

Title: Map of GWF-2 Pipeline - Description: A map showing the route of the GWF-2 pipeline covered by Pipeline Licence WA-27-PL, as varied.

 


Varied Pipeline Co-ordinates

 

ROUTE OF THE PIPELINE

 

The pipeline route is described in the table hereunder, commencing at the Lady Nora/Pemberton (LPA) PLET to the Goodwyn Alpha (GWA) PLET, including the tie-in flowlines and spools connecting to the GWA Subsurface Isolation Valves. Coordinates are based on Geodetic Datum of Australia (GDA94).

 

Main Pipeline

 

Feature Name

KP*

Easting (mE)

Northing (mN)

Bend Radius (m)

1

LPA PLET (start)

0.0

359 486.48

7 806 936.25

 

2

TP1A

1.16

360 506.88

7 807 487.22

 

3

IP1

 

360 607.97

7 807 541.81

1200

4

TP1B

1.389

360 696.87

7 807 614.58

 

5

TP2A

2.581

361 619.34

7 808 369.74

 

6

IP2

 

361 684.27

7 808 422.89

1200

7

TP2B

2.748

361 755.97

7 808 466.49

 

8

TP3A

3.721

362 587.08

7 808 971.91

 

9

IP3

 

362 652.03

7 809 011.41

1200

10

TP3B

3.873

362 721.46

7 809 042.39

 

11

TP4A

4.673

363 451.98

7 809 368.48

 

12

IP4

 

363 538.22

7 809 406.97

1200

13

TP4B

4.861

363 617.38

7 809 458.49

 

14

ZRB 1

5.835

364 433.03

7 809 989.28

 

15

ZRB 2

7.171

365 669.04

7 810 496.32

 

16

ZRB 3

9.021

367 215.20

7 811 512.14

 

17

ZRB 4

910.828

368 899.52

7 811 168.98

 

18

IZRB 5

12.646

370 448.64

7 813 120.32

 

19

ZRB 6

14.659

371 937.46

7 814 475.26

 

20

ZRB 7

16.459

373 458.86

7 815 437.22

 

21

TP5A

16.959

373 822.72

7 815 780.16

 

22

IP5

 

374 036.69

7 815 981.83

3200

23

TP5B

17.546

374 210.34

7 816 219.12

 

24

ZRB 8

18.286

374 647.20

7 816 816.12

 

25

TP6A

18.859

374 886.58

7 817 336.68

 

26

IP6

 

374 982.40

7 817 545.04

3800

27

TP6B

19.317

375 052.46

7 817 763.42

 

28

IP ZRB 9

20.522

375 420.61

7 818 910.92

 

29

IP ZRB 10

21.822

376 046.65

7 820 050.25

 

30

TP7A

22.272

376 334.63

7 820 396.03

 

31

IP7

 

376 468.88

7 820 557.23

3000

32

TP7B

22.691

376 624.25

7 820 698.18

 

33

IP ZRB 11

23.622

377 313.90

7 821 323.78

 

34

IP ZRB 12

25.722

379 128.65

7 822 380.50

 

35

IP ZRB 13

28.122

381 401.79

7 823 150.46

 

36

IP ZRB 14

30.522

383 506.70

7 824 303.44

 

37

IP ZRB 15

32.922

385 379.42

7 825 804.41

 

38

TP8A

33.55

385 929.99

7 826 105.99

 

39

IP8

 

386 298.69

7 826 307.95

5000

40

TP8B

34.388

386 695.94

7 826 445.52

 

41

GWA-PLET (End)

35.372

387 625.69

7 826 767.47

 

Table 1. Route of the main pipeline (*KP=Kilometre Point).