APPLICATION FOR VARIATION OF A PIPELINE LICENCE -PIPELINE LICENCE VIC/PL25 (WHITING TO SNAPPER) (K4C5QG)

 

I, MONICA ELAINE ATSALIS, the Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Esso Australia Resources Pty Ltd

(ACN 091 829 819)

 

Woodside Energy (Bass Strait) Pty Ltd

(ACN 004 228 004)

 

 

for the variation of Pipeline Licence VIC/PL25 in the offshore area of Victoria, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

MONICA ELAINE ATSALIS

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTH–VICTORIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 

 


 

APPLICATION FOR VARIATION OF

PIPELINE LICENCE VIC/PL25

 

The application seeks to effect the following amendments to the licence: 

 

  1.       Removal of the flexible jumper at the Whiting platform, the pipeline remaining on the seabed will be plugged using an environmental plug and the remaining licensed pipeline will be decommissioned at a later date in accordance with the regulatory approvals in place for that decommissioning activity.

 

  1.       The FIRST SCHEDULE of the Licence is varied by deleting the current text and table below the heading “FIRST SCHEDULE ROUTE OF PIPELINE”

and

substituting under the heading the following:

“The route of the pipeline is described in the table below, and displayed in the map below (Attachment A), commencing at the start of the steel pipeline near the Whiting platform and terminating at the first flange upstream of the First Valve On (FVO) on the Snapper platform.”

ID

Description

Easting (mE)

Northing (mN)

1

Start of WTA200 Steel Pipe near Whiting platform

576490

5767179

2

Tangent Intersection Point 04

578784

5769526

3

Inflection Point 05

589646

5772155

4

Inflection Point 06

589763

5772173

5

Tangent Intersection Point 04

589763

5772172

6

Inflection Point 07

589770

5772166

7

Inflection Point 08

589773

5772177

8

SNA600 Gas Pipeline Crossing

589774

5772176

9

Upstream flange of FVO on Snapper platform

589784

5772178

Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.

 

  1.       The SECOND SCHEDULE of the Licence is varied by deleting all current text as stated in the licence renewal instrument dated 30 August 1996 and all subsequent variations (e.g., variation dated 8 October 2020, 3 April 2025), and substituting with the following:

 

 

 

 

 

 

 

 

 

SPECIFICATION 

 

(A) Design

 

The pipeline design is based on the following parameters:

 

  1.             one 200 mm nominal diameter pipeline for the conveyance of gaseous and liquid hydrocarbons;
  2.             a flow rate of 3500 sm3/d (0.022 MMbbl/d) of liquid hydrocarbons;
  3.             an internal design pressure of 21,000 kPag;
  4.             a design temperature of 60°C;
  5.             a specific gravity of 3.2 for the 219.1 mm X 25.4 mm pipeline (including contents);
  6.             a pipeline length of approximately 14.5 km.

 

(B) Materials of Construction

 

  1.             Steel Pipe

 

The steel line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5L for Grade B seamless pipe and Esso Australia Limited supplemental pipe specification accompanying the pipeline licence application and the pipeline shall have the dimensions 219.1 mm O.D. with 25.4 mm W.T.

 

The riser pipe at the Snapper platform shall be in accordance with the requirements of American Petroleum Institute - API Spec. 5LX, Grade X-60 seamless pipe and have the dimensions 219.1 mm O.D. and 18.3 mm W.T.

 

The connection of the said riser pipework at the Snapper platform to the line pipe shall be by flexible jumper as detailed in the specifications accompanying the pipeline licence application.

 

  1.             Protective Coating

 

The line pipe shall be protected by a coating of Taubmans HB 3005 Fusion Bonded Epoxy 400-500 Microns thick, and in accordance with the Esso Australia Limited Protective Coatings Specifications accompanying the pipeline licence application.

 

(C) Cathodic Protection

 

  1.             Transformer rectifier unit on the Snapper platform shall provide protection to the subsea portion of the pipeline.

 

  1.             Sacrificial anodes in the form of zinc bracelets shall be installed, spaced and maintained as detailed in the construction specifications and cathodic protection design.

 

 

 

 

 

 

 

 

ATTACHMENT A

 

Map showing pipeline routes and key inflection points within VIC/L2, VIC/L10, and VIC/L3 license boundaries. Features include labeled platforms, gas pipeline crossings, and coordinate grid with a legend indicating platforms, pipelines, license boundaries, and petroleum blocks.