APPLICATION FOR VARIATION OF A PIPELINE LICENCE - PIPELINE LICENCE VIC/PL23 (TARWHINE TO BARRACOUTA) (RCJ8FG)
I, MONICA ELAINE ATSALIS, the Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from
Esso Australia Resources Pty Ltd
(ACN 091 829 819)
Woodside Energy (Bass Strait) Pty Ltd
(ACN 004 228 004)
for the variation of Pipeline Licence VIC/PL23 in the offshore area of Victoria, as set out below.
Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.
This notice takes effect on the day on which it appears in the
Australian Government Gazette.
Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006
of the Commonwealth of Australia.
MONICA ELAINE ATSALIS
DELEGATE OF THE TITLES ADMINISTRATOR
ON BEHALF OF THE COMMONWEALTH–VICTORIA
OFFSHORE PETROLEUM JOINT AUTHORITY
APPLICATION FOR VARIATION OF
PIPELINE LICENCE VIC/PL23
The application seeks to effect the following amendments to the licence:
and
substituting under the heading the following:
“The route of the pipeline is described in the table below, and displayed in the map below
(Attachment A), commencing at the steel pipeline upstream of the BMA350 pipeline crossing and terminating at the first flange upstream of the First Valve On (FVO) on the Barracouta platform.”
ID | Description | Easting (mE) | Northing (mN) |
1 | Steel Pipe upstream of BMA350 Gas Pipeline Crossing Steel Pipe – Section 1 Start | 552606 | 5755152
|
2 | BMA350 Gas Pipeline Crossing | 552622 | 5755167 |
3 | Steel Pipe downstream of BMA350 Gas Pipeline Crossing Steel Pipe – Section 1 End | 552636
| 5755180 |
4 | Intersection point with 500m Petroleum Safety Zone for Barracouta platform Steel Pipe – Section 2 Start | 558716
| 5760720 |
5 | Inflection Point 04 | 559090 | 5761053 |
6 | BTA450 Gas Pipeline Crossing | 559090 | 5761057 |
7 | BTW EHU Crossing | 559090 | 5761061 |
8 | Inflection Point 05 | 559091 | 5761064 |
9 | BTA150 Oil Pipeline Crossing | 559093 | 5761064 |
10 | BTA65 Gas Lift Pipeline Crossing | 559094 | 5761064 |
11 | Upstream flange of FVO on Barracouta platform Steel Pipe – Section 2 End | 559106 | 5761066 |
Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.
SPECIFICATION
(A) Design
The pipeline design is based on the following parameters –
(B) Materials of Construction
The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification – API Spec 5L for Grade X42 seamless pipe and Esso Australia Limited supplemental pipe specification accompanying the pipeline licence application, and except for the riser pipework, the pipeline shall have the dimensions 219.1 mm O.D. with 14.3 mm W.T.
The said riser pipework shall be API Spec. 5LX, Grade X-60 seamless pipe and have the dimensions 219.1 mm O.D. and 14.3 mm W.T.
The connection of the said riser pipework to the line pipe shall be made by flexible jumper as detailed in the specifications accompanying the pipeline licence application.
The main pipeline sits within a carrier pipe which provides thermal insulation and is made from API-5L Grade B seamless line-pipe.
The carrier pipe shall be in accordance with the requirements of the American Petroleum Institution Specification – API Spec 5L for Grade B seamless pipe and Esso Australia Limited supplemental pipe specification accompanying the pipeline licence application and shall have the dimensions 298.5 mm O.D. with 17.5 mm W.T.
The carrier line pipe shall be protected by a coating of Taubmans HD3005 Fusion Bonded Epoxy 400-500 Microns thick, and the main pipeline line pipe shall be insulated by a coating of Aptane AP8809/6/8900 closed cell Polyurethane Foam Insulation 12 - 15 mm thick and in accordance with the Esso Australia Limited Protective Coating Specifications accompanying the pipeline licence application.
Protection of the riser pipework by epoxy coating shall be in accordance with the Coating Specification No. 4.3 – Protective Coatings for Onshore Plants, Offshore Platforms and other Marine Structures.
Protection of the riser pipework in the splash zone area with 5 mm thick Monel sheeting shall be as detailed in the specifications accompanying the pipeline licence application.
(C) Cathodic Protection