actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2024/10047

David Barnham / Residential Development / 95 (Lot 36) Woodvale Drive, Woodvale, WA / Western Australia / Residential Development, Woodvale

10/04/2025

2024/10020

Yarra Valley Water Corporation / Waste Management (sewerage) / Northern portion:139-157 Johnstone Street Jacana 3047. Southern portion: Karin Crescent Glenroy 3046 / Victoria / Jacana sewage flow control (SFC) and emergency relief structure (ERS) on the Upper Moonee Ponds Main Sewer

14/04/2025

2025/10119

Lachlan Roberts / Energy Generation and Supply (renewable) / 2153 Stuart Highway, Carriewerloo, SA 5715 / South Australia / Aurora Energy Project (AEP)

15/04/2025

2025/10120

Adam Smith / Energy Generation and Supply (renewable) / 1955 Eumungerie Road, Burroway, NSW 2821 / New South Wales / Burroway Solar Farm

16/04/2025

 

DECISION ON APPROVAL (EPBC Act s.133)

Reference

Title

Approval Decision

Date

2018/8205

Perron Developments Pty Ltd / Residential Development / Lot 131 Jandakot Road, Treeby / Western Australia / Residential Development Lot 131 Jandakot Road, Treeby WA

Approved with conditions

7/04/2025

 

NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))

Reference

Title

Extended to

Date

2022/09424

Department of State Growth / Transport - Land / Midland Highway – north of West Street, Campbell Town to Esk Main Road, Conara / Tasmania / Midland Highway Upgrade - Campbell Town North Portion B

9/05/2025

10/04/2025

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.