COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE –

PIPELINE LICENCE VIC/PL18 (ZD6KQJ)

 

I, STEVEN ROBERT TAYLOR, Delegate of the National Offshore Petroleum Titles Administrator on behalf of the Commonwealth–Victoria Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 (the Act) that an application has been received from

 

Esso Australia Resources Pty Ltd

(ACN 091 829 819)

 

Woodside Energy (Bass Strait) Pty Ltd

(ACN 004 228 004)

 

for the variation of Pipeline Licence VIC/PL18 in the offshore area of Victoria, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the
Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

STEVEN ROBERT TAYLOR 

DELEGATE OF THE TITLES ADMINISTRATOR 

ON BEHALF OF THE COMMONWEALTH–VICTORIA  
OFFSHORE PETROLEUM JOINT AUTHORITY 

 

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE VIC/PL18

 

 

The application seeks to affect the following amendments to the licence:

 

  1. The FIRST SCHEDULE (Route of the Pipeline) is varied by deleting all the current text and replacing with the following: 

 

The route of the pipeline is described in the table below, and displayed in the map below (Attachment A), commencing at the cut spool location at the Flounder platform and terminating at the flange upstream of the First Valve Off (FVO) on the Tuna platform.

 

ID

DESCRIPTION

Easting (m)

Northing (m)

1

Cut spool location at the Flounder platform

625859.58

5758703.21

2

Inflection Point 01

625872.38

5758703.79

3

Inflection Point 02

625939.09

5759035.67

4

Inflection Point 03

626163.92

5765269.69

5

Inflection Point 04

625615.17

5770983.94

6

Inflection Point 05

626630.81

5771109.54

7

West Tuna Fluid Umbilical Crossing

625623.46

5772200.20

8

KPA350 South Gas Pipeline Crossing

625623.22

5772222.48

9

KPA350 North Gas Pipeline Crossing

625623.33

5772272.70

10

West Tuna Electrical Umbilical Crossing

625623.23

5772300.92

11

Inflection Point 06

625618.73

5773573.59

12

Inflection Point 07

624365.90

5774390.58

13

FVO Tuna Manifold

624358.16

5774390.34

 

Coordinate set above is based on GDA 94/MGA Zone 55, survey of pipeline centreline.

 

2.      The SECOND SCHEDULE of the Licence is varied by:

 

  1. deleting the text under item (i), Part B - Materials of Construction - Steel Pipe and replace with the following text:

 

The line pipe shall be in accordance with the requirements of the American Petroleum Institute Specification - AP/Spec 5L, 38th Edition 1990 for Grade X52 seamless pipe and Esso Australia Limited Supplemental pipe specification accompanying the pipeline licence application and the pipeline shall have the dimensions 273.1 mm O.D. and 12. 7 mm W.T.

 

b.      deleting the following text under item (ii), Part B - Protective Coating:

 

Protection of the riser pipework shall be maintained with a coating in accordance with the Coating Specification No 4.3 - Protective Coatings for Onshore Plants, Offshore Platforms and other Marine Structures and shall be protected in the splash zone area with 4.7 mm thick monel sheeting as detailed in the specifications accompanying the original pipeline licence application.

 

c.       deleting the text under Part C - Cathodic Protection

 

(a)   Insulating joints and gaskets shall be maintained on the pipeline in accordance with the construction specifications accompanying the original pipeline licence application.

 

(b)   Transformer rectifier units on the Tuna platform and the Flounder platform shall provide protection to the subsea portion of the pipeline.

 

(c) Sacrificial anodes in the form of zinc bracelets shall be installed, spaced and maintained as detailed in the construction specifications and cathodic protection design.

 

The rest of the SECOND SCHEDULE remains as stated in the licence instrument dated 10 August 1983 and as varied 19 May 2020.

 


Attachment A

 

Map of pipeline route and coordinates for VIC/PL18