DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER

Environment Protection and Biodiversity Conservation Act 1999

 

EPBC Act Part 7-9 decisions published, 27/05/2024 to 02/06/2024

 

For further information see the referrals list at https://epbcpublicportal.awe.gov.au/all-referrals/

and type the reference number in the Filter by Referral Number box

 

actions determined as requiring approval (EPBC Act s.75)

Reference

Title

Controlling Provisions

Date

2024/09772

BALDON WIND FARM PTY LTD / Energy Generation and Supply (renewable) / 1543 Tchelery Road, Moulamein / New South Wales / Baldon Wind Farm

  • Listed threatened species and communities (sections 18 & 18A)

 

27/05/2024

2024/09802

Antoni Mrdjen / Energy Generation and Supply (renewable) / 1274 Red Hill Road, Bororen / Queensland / Eurimbula Solar Farm

  • World Heritage (sections 12 & 15A)
  • National Heritage (sections 15B & 15C)
  • Listed threatened species and communities (sections 18 & 18A)
  • Great Barrier Reef Marine Park

(sections 24B & 24C)

28/05/2024

2024/09819

VECCO INDUSTRIAL PTY LTD / Mining / Punchbowl Road, Julia Creek (Bow Park, Malpas Trenton) / Queensland / Vecco Critical Minerals Open-Cut Mining Project

  • Listed threatened species and communities (sections 18 & 18A)

 

30/05/2024

 

actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2022/09238

Transport for Canberra and City Services Directorate / Transport - Land / William Hovell Drive, ACT between Coulter Drive and Bindubi Street. / Australian Capital Territory / William Hovell Drive – Shared User Path – Coulter Dr to Bindubi St

27/05/2024

 

 

Assessment Approach (EPBC Act s.87)

Reference

Title

Assessment Approach

Date

2024/09802

Antoni Mrdjen / Energy Generation and Supply (renewable) / 1274 Red Hill Road, Bororen / Queensland / Eurimbula Solar Farm

Public Environment Report

28/05/2024

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.