DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 18/03/2024 to 24/03/2024
For further information see the referrals list at https://epbcpublicportal.awe.gov.au/all-referrals/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2019/8434 | SHIRE OF JERRAMUNGUP / Transport - Air and Space / Lot 1548 Don Ende Drive, Bremer Bay (Deposited Plan 194377). Reserve 24521 / Western Australia / Proposed cross runway clearing at Bremer Bay Airfield |
| 15/03/2024 |
2023/09692 | Andrew Wilson / Energy Generation and Supply (non-renewable) / Corner of Banana Bridge Road and Whyalla Road, Hopeland, Queensland / Queensland / Brigalow Peaking Power Plant Project |
| 18/03/2024 |
2023/09689 | Comet Ridge Mahalo North Pty Ltd / Energy Generation and Supply (non-renewable) / Meroo Downs property, Meroo Downs Rd, Togara / Queensland / Comet Ridge Mahalo North Coal Seam Gas Project |
| 19/03/2024 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2023/09724* | Maddi Alafaci / Transport - Land / Barwon Heads Road, between Reserve Road, Charlemont and Lower Duneed Road, Armstrong Creek. / Victoria / Barwon Heads Road Reserve Road to Lower Duneed Road Upgrade Project | 18/03/2024
|
* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from https://epbcpublicportal.awe.gov.au/all-referrals/
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2019/8434 | SHIRE OF JERRAMUNGUP / Transport - Air and Space / Lot 1548 Don Ende Drive, Bremer Bay (Deposited Plan 194377). Reserve 24521 / Western Australia / Proposed cross runway clearing at Bremer Bay Airfield | Preliminary Documentation | 15/03/2024 |
2023/09692 | Andrew Wilson / Energy Generation and Supply (non-renewable) / Corner of Banana Bridge Road and Whyalla Road, Hopeland, Queensland / Queensland / Brigalow Peaking Power Plant Project | Preliminary Documentation | 18/03/2024 |
2023/09689 | Comet Ridge Mahalo North Pty Ltd / Energy Generation and Supply (non-renewable) / Meroo Downs property, Meroo Downs Rd, Togara / Queensland / Comet Ridge Mahalo North Coal Seam Gas Project | Preliminary Documentation | 19/03/2024 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2021/9137 | NEOEN AUSTRALIA PTY. LTD. / Energy Generation and Supply (renewable) / Glengowan Road, Ulogie / Queensland / Mount Hopeful Wind Farm | 26/04/2024 | 29/02/2024 |
2021/9018 | Elecseed Pty Ltd / Energy Generation and Supply (renewable) / Lot 4 DY457 / Queensland / Kumbarilla Renewable Energy Park, 40kms west Dalby | 15/04/2024 | 15/03/2024 |
2013/7051 | SGD 1 Pty Ltd and SGD 2 Pty Ltd / Residential Development / Lots 19 and 40, Tea Gardens / New South Wales / Riverside residential development, Tea Gardens, NSW | 12/04/2024 | 20/03/2024 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.