actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2023/09645 | Alpine Resorts Victoria / Tourism and Recreation / 28 Lower Lake Road, Falls Creek, 3699 / Victoria / Lakeside Precinct Visitor and Event Centre |
| 15/02/2024 |
2023/09694 | Rossiter Road Investments Pty Ltd / Commercial Development / 145 Rossiter Road, Koo Wee Rup, Victoria 3981 / Victoria / Rossiter Park |
| 16/02/2024 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2023/09665 | William Anthony / Residential Development / 56 Prescot Parade, Milperra, NSW 2214 / New South Wales / Riverlands Shared Pathway | 14/02/2024 |
2023/09663 | MAAS GROUP HOLDINGS LIMITED / Transport - Land / 60 Tringa Street, Tweed Heads West / New South Wales / Access for industrial subdivision | 15/02/2024 |
2023/09680 | SHIRE OF SERPENTINE JARRAHDALE / Transport - Land / Orton Road from intersection of King Road to Bullock Drive, Oakford / Western Australia / Orton Road Upgrade Project | 16/02/2024 |
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2023/09645 | Alpine Resorts Victoria / Tourism and Recreation / 28 Lower Lake Road, Falls Creek, 3699 / Victoria / Lakeside Precinct Visitor and Event Centre | Preliminary Documentation | 15/02/2024 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2022/09214 | Virya Energy Ptd Limited / Energy Generation and Supply (renewable) / 1735 Moonbria Road, Mabins Well. Full list Att B1-Lots-DPs-2022.pdf / New South Wales / Yanco Delta Wind Farm | Approved with conditions | 21/02/2024 |
2020/8632 | Lower Murray Urban and Rural Water Corporation / Water Management and Use / Kulkyne Way, Red Cliffs / Victoria / Hattah Lakes North Floodplain Restoration Project | Approved with conditions | 22/02/2024 |
variation of conditions of approval (EPBC Act s.143)
Title | Date | |
2008/4410 | AIR FORCE HEADQUARTERS DEPARTMENT OF DEFENCE / Commonwealth / RAAF Base Amberley, Southern Amberley Rd, west of Ipswich / Queensland / Australian Super Hornet Flying Operations at RAAF Base Amberley | 4/12/2023 |
2018/8280 | MANGOOLA COAL OPERATIONS PTY LIMITED / Mining / Multiple lots / New South Wales / Mangoola Coal Continued Operations Project, NSW | 20/02/2024 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2021/9018 | Elecseed Pty Ltd / Energy Generation and Supply (renewable) / Lot 4 DY457 / Queensland / Kumbarilla Renewable Energy Park, 40kms west Dalby | 15/03/2024 | 21/02/2024 |
Manyana Coast Pty Ltd / Residential Development / Multiple lots / New South Wales / Residential Development, Lot 172 DP 755923 and Lot 823 DP 247285, Manyana, NSW | 28/03/2024 | 23/02/2024 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.