DEPARTMENT OF CLIMATE CHANGE, ENERGY, THE ENVIRONMENT AND WATER
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 13/03/2023 to 19/03/2023
For further information see the referrals list at https://epbcpublicportal.awe.gov.au/all-referrals/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2022/09398 | Department for Infrastructure and Transport / Transport - Land / See 1.2.1 - Area adj. Sturt Hwy (Dutton East) 330 m west of MM84.82 to 155 m east of MM86.82 / South Australia / Truro Bypass Project |
| 14/03/2023 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2022/09406* | National Capital Authority / Commonwealth Development / National Library of Australia Parkes Place West, Canberra ACT 2600 / Australian Capital Territory / National Library of Australia Forecourt Lombardy Poplar Replacement | 14/03/2023
|
* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from https://epbcpublicportal.awe.gov.au/all-referrals/
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2020/8809 | City of Canning / Transport - Land / Grey Street, Cannington, WA, 6107, Australia / Western Australia / Southern Link Road Stage 3 City of Canning | Accredited Assessment Process under the Environmental Protection Act 1986 (WA) | 9/03/2023 |
2022/09398 | Department for Infrastructure and Transport / Transport - Land / See 1.2.1 - Area adj. Sturt Hwy (Dutton East) 330 m west of MM84.82 to 155 m east of MM86.82 / South Australia / Truro Bypass Project | Preliminary Documentation | 14/03/2023 |
OUTCOME OF REQUEST FOR RECONSIDERATION OF S75(1) DECISION (EPBC Act s.78C)
Reference | Title | Reconsideration Decision | Date |
2020/8646 | Queensland Department of Transport and Main Roads / Transport - Land / Oaky Creek Road Coomera, to Nerang-Broadbeach Road Nerang / Queensland / Stage 1 Coomera Connector | Controlled Action | 16/03/2023 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Climate Change, Energy, the Environment and Water or may not meet timeframes for notification. The Department of Climate Change, Energy, the Environment and Water has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Climate Change, Energy, the Environment and Water regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.