DEPARTMENT OF AGRICULTURE, WATER AND THE ENVIRONMENT
Environment Protection and Biodiversity Conservation Act 1999
EPBC Act Part 7-9 decisions published, 24/01/2022 to 30/01/2022
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2021/9097 | Richmond Vanadium Technology Pty Ltd / Mining / Frontage Road, Richmond / Queensland / Richmond – Julia Creek Vanadium Project |
| 24/01/2022 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2021/9104 | Diamantina Power Station Pty Limited / Energy Generation and Supply (renewable) / unformed Rd Reserve - accessed from Boulia Mount Isa Highway / Queensland / APA Mica Creek Renewable Energy Facility | 24/01/2022 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2020/8676 | Vitrinite Pty Ltd / Mining / near Moranbah / Queensland / Vulcan Complex Project | 11/03/2022 | 21/01/2022 |
2020/8755 | CleanCo Queensland Limited / Energy Generation and Supply (renewable) / located approximately 40 km south-west of the township of Warwick / Queensland / Karara Wind Farm Project, QLD | 14/02/2022 | 21/01/2022 |
2020/8756 | ACCIONA ENERGY AUSTRALIA GLOBAL PTY LTD / Energy Generation and Supply (renewable) / A list of the subject lots relevant to the Project are shown in Attachment B Lot / plans. / Queensland / MacIntyre Wind Farm Project | 14/02/2022 | 21/01/2022 |
2020/8759 | ACCIONA ENERGY AUSTRALIA GLOBAL PTY LTD / Energy Generation and Supply (renewable) / 40km south-west of Warwick / Queensland / Overhead Transmission Line – MacIntyre Wind Energy Precinct | 14/02/2022 | 21/01/2022 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Agriculture, Water and the Environment or may not meet timeframes for notification. The Department of Agriculture, Water and the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Agriculture, Water and the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.