DEPARTMENT OF THE ENVIRONMENT AND ENERGY
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2018/8138 | AMG (WA) PTY LTD / Mining / Lot 3, Buller Road, Waroona / Western Australia / Clearing and sand extraction, Lot 3 Buller Road, Waroona, WA |
| 11/05/2018 |
2018/8366 | Dale Smith / Private / Lot 11 on HR1950, Lot 7 on SP275843 and Lot 26 on SP220411. / Queensland / Koonandah Hard Rock Quarry, Bowen, QLD |
| 18/03/2019 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2018/8357 | ANGLOGOLD ASHANTI AUSTRALIA LIMITED / Mining / Mining Lease M39 / 1096. / Western Australia / Tropicana Gold Mine underground mining and powerline, 330 km east-north east of Kalgoorlie, WA | 17/03/2019 |
2019/8391 | A.P. DELANEY & CO PTY LTD / Mining / 208 Winchester Lane, Table Top, NSW, 2640 / New South Wales / Rockwood Quarry Project, Table Top, NSW | 18/03/2019 |
Assessment Approach (EPBC Act s.87)
Reference | Title | Assessment Approach | Date |
2018/8138 | AMG (WA) PTY LTD / Mining / Lot 3, Buller Road, Waroona / Western Australia / Clearing and sand extraction, Lot 3 Buller Road, Waroona, WA | Preliminary Documentation | 11/05/2018 |
2018/8366 | Dale Smith / Private / Lot 11 on HR1950, Lot 7 on SP275843 and Lot 26 on SP220411. / Queensland / Koonandah Hard Rock Quarry, Bowen, QLD | Preliminary Documentation | 18/03/2019 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2017/7934 | MAIN ROADS / Transport - Land / Albany Highway, Kojonup, WA, 6395 / Western Australia / Road Widening Kojonup South SLK 254.9 to SLK 259.8 | Approved with conditions | 26/02/2019 |
2015/7591 | Defence Housing Australia / Commonwealth Development / Lee Point Road, Darwin / Northern Territory / Lee Point Master-planned urban development, Darwin, NT | Approved with conditions | 17/03/2019 |
2016/7846 | Sytka Pty Ltd / Residential Development / Lot 9006 Reilly Road, Harrisdale / Western Australia / Residential development and bushfire protection within part Lot 9006 Reilly Road, Harrisdale, WA | Approved with conditions | 17/03/2019 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended by (Days) | Date |
2018/8156 | White Rock Wind Farm Pty Ltd / Energy Generation and Supply (renewable) / 20km west of Glen Innes / New South Wales / White Rock Wind Farm Modification | 73 | 22/03/2019 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.