DEPARTMENT OF THE ENVIRONMENT AND ENERGY
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as requiring approval (EPBC Act s.75)
Reference | Title | Controlling Provisions | Date |
2018/8364 | CO-OPERATIVE BULK HANDLING LIMITED / Agriculture and Forestry / Lots 102 (DP 031366), 208 (DP193928), UCL (identified by PIN 643570), road reserve, rail reserve / Western Australia / Newdegate Grain Receival Site Expansion, Newdegate, WA |
| 26/02/2019 |
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2018/8352 | TILT RENEWABLES AUSTRALIA PTY LTD / Energy Generation and Supply (renewable) / 10 land titles belonging to 8 individual landowners at Waddi, WA / Western Australia / Waddi Wind and Solar Farm, near Dandaragan, WA | 27/02/2019 |
2018/8375 | CITY OF GREATER GEELONG / Water Management and Use / 1-87 Groves Road, Armstrong Creek / Charlemont, VIC, 3217 / Victoria / Sparrovale Wetland stormwater management, Armstrong Creek and Charlemont, VIC | 7/03/2019 |
variation of conditions of approval (EPBC Act s.143)
Title | Date | |
2010/5566 | ASTON COAL 2 PTY LTD / Mining / Leard Forest Road, 18km NE of Boggabri, Gunnedah Coal Basin / New South Wales / Maules Creek Coal Project | 22/02/2019 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.