DEPARTMENT OF THE ENVIRONMENT AND ENERGY
Environment Protection and Biodiversity Conservation Act 1999
For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/
and type the reference number in the Filter by Referral Number box
actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2018/8373 | EGS Survey Pty Ltd / Telecommunications / Not confirmed as this is for marine survey / Commonwealth Marine / Japan-Guam-Australia Sunshine Coast Branch Marine Cable Route Survey (JGA) QLD | 7/02/2019 |
2018/8310 | DIRECTOR OF NATIONAL PARKS / Commonwealth / Lasseter Highway, Yulara, NT, 0872 / Northern Territory / Uluru Climb Closure, Uluru-Kata Tjuta National Park, NT | 8/02/2019 |
2018/8346 | MAIN ROADS / Transport - Land / Indian Ocean Drive, Gingin, WA, 6503 / Western Australia / Indian Ocean Drive Widening, Gingin Shire, WA | 8/02/2019 |
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2017/8095 | JOLIFIELDS DEVELOPMENTS PTY LTD & The Trustee for Morehampton Capital & The Trustee for the Goldfields QLD Trust / Residential Development / Lot 3 on SP237241 / Queensland / Ripley Road residential development, Ripley Valley, Qld | Approved with conditions | 12/02/2019 |
variation of conditions of approval (EPBC Act s.143)
Title | Date | |
2015/7464 | DEPT OF TRANSPORT AND MAIN ROADS / Transport - Land / Queensland Sunshine Coast / Queensland / Bruce Highway upgrade Caloundra to Sunshine Motorway Project no: 280 / 10A / 1 | 12/02/2019
|
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.