COMMONWEALTH OF AUSTRALIA

 

Sections 226 and 708

Offshore Petroleum and Greenhouse Gas Storage Act 2006

 

APPLICATION FOR VARIATION OF A PIPELINE LICENCE

 

I, JOANNE JENNIFER BELL, Delegate of the National Offshore Petroleum Titles Administrator, on behalf of the Commonwealth–Western Australia Offshore Petroleum Joint Authority hereby give notice pursuant to sections 226 and 708 of the Offshore Petroleum and Greenhouse Gas Storage Act 2006 that an application has been received from

 

Quadrant Oil Australia Pty Limited

(ABN 63 050 611 688)

 

Quadrant East Spar Pty Limited

(ABN 82 008 674 413)

 

Quadrant Kersail Pty Ltd

(ABN 28 087 029 169)

 

Santos (BOL) Pty Ltd

(ABN 35 000 670 575)

 

for the variation of Pipeline Licence WA-5-PL, located in the offshore area of Western Australia, as set out below.

 

Pursuant to subsection 226(3) of the Act, a person may make a written submission to the Titles Administrator about this application within 30 days from the date of this notice.

 

This notice takes effect on the day on which it appears in the Australian Government Gazette.

 

Made under the Offshore Petroleum and Greenhouse Gas Storage Act 2006

of the Commonwealth of Australia.

 

 

JOANNE JENNIFER BELL

DELEGATE OF THE TITLES ADMINISTRATOR

ON BEHALF OF THE COMMONWEALTHWESTERN AUSTRALIA

OFFSHORE PETROLEUM JOINT AUTHORITY

 


APPLICATION FOR VARIATION OF

PIPELINE LICENCE WA-5-PL

 

Pipeline Route

 

The route of the pipeline shall be as described in the table below, from and including the boundary of Pipeline Licence WA-21-PL and WA-5-PL at the tie-in flange at or about 7,707,290.78mN, 290,101.15mE to the pipeline licence boundary of TPL-12 at or about 7,714,306.54mN, 330,042.88mE along a line no point of which shall be more than 125 metres from the proposed pipeline route as shown in the drawing attached to the Licence as Annexure ‘A’.  The coordinates given above are relative to UTM zone 50, with Central Meridian 117 deg E based on Geodetic Datum of Australia (GDA94).

 

Feature ID

Feature Name

UTM Zone

Easting (mE)

Northing (mN)

1

Boundary of WA21PL and WA5PL (start point)

Zone 50

290,101.15

7,707,290.78

2

East Spar Tiein Flange (Connection to Z-Spool Flange)

Zone 50

290,117.00

7,707,292.00

3

14” East Spar Pipeline Flange (Connection to ZSpool Flange)

Zone 50

290,128.92

7,707,316.25

4

Intersection Point (IP) 1

Zone 50

312,897.64

7,710,670.05

5

IP 2

Zone 50

315,961.70

7,711,378.97

6

IP 3

Zone 50

320,430.55

7,712,179.87

7

Boundary of WA5PL and TPL12 (end point)

Zone 50

330,042.88

7,714,306.54

 

 

Pipeline Design Parameters

 

The Second Schedule of Part 1 Specifications of the Licence is to be varied by: