actions determined as NOT requiring approval (EPBC Act s.75)
Reference | Title | Date |
2014/7115 | City of Gosnells/Transport - land/Maddington, WA/WA/Burslem Drive Bridge Duplication Over Canning River, Maddington, WA | 10/02/2014 |
2013/7080* | Apache Energy Limited/Exploration (mineral, oil and gas - marine)/Canarvon Basin/WA/Stag 4D & Reindeer MAZ Marine Seismic Surveys, WA | 11/02/2014 |
2013/7007* | Sunshine Coast Regional Council/Natural resources management/Lot 17 on CG4755 Aragorn St, Maroochydore/QLD/Tepequar Drive Flying Fox Roost Dispersal Management, Maroochydore, Qld | 12/02/2014 |
* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from www.environment.gov.au/epbc/notices
DECISION ON APPROVAL (EPBC Act s.133)
Reference | Title | Approval Decision | Date |
2011/5865 | Infigen Suntech Australia Pty Ltd/Energy generation and supply (renewable)/Tarago Road, 6km NE of Bungendore, Southern Tablelands/NSW/Capital Solar Farm Southern Tablelands NSW | Approved with conditions | 10/02/2014 |
2011/5850 | Willogoleche Power Pty Ltd/Energy generation and supply (renewable)/3.5 Km from the town of Hallett, SA/SA/Willogoleche Wind Farm, SA | Approved with conditions | 28/01/2014 |
NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))
Reference | Title | Extended to | Date |
2012/6336 | Spencer Gulf Port Link/Transport - water/Port Bonython, Eyre Peninsula, SA/SA/Port Bonython Bulk Commodities Export Facility, SA | 30/06/2014 | 07/02/2014 |
Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment or may not meet timeframes for notification. The Department of the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.