Commonwealth Coat of Arms

Minerals Resource Rent Tax Act 2012

No. 13, 2012 as amended

Compilation start date:  1 July 2012

Includes amendments up to: Act No. 88, 2013

 

About this compilation

The compiled Act

This is a compilation of the Minerals Resource Rent Tax Act 2012 as amended and in force on 1 July 2012. It includes any amendment affecting the compiled Act to that date.

This compilation was prepared on 7 October 2013.

The notes at the end of this compilation (the endnotes) include information about amending Acts and instruments and the amendment history of each amended provision.

Uncommenced provisions and amendments

If a provision of the compiled Act is affected by an uncommenced amendment, the text of the uncommenced amendment is set out in the endnotes.

Application, saving and transitional provisions for amendments

If the operation of an amendment is affected by an application, saving or transitional provision, the provision is identified in the endnotes.

Modifications

If a provision of the compiled Act is affected by a textual modification that is in force, the text of the modifying provision is set out in the endnotes.

Provisions ceasing to have effect

If a provision of the compiled Act has expired or otherwise ceased to have effect in accordance with a provision of the Act, details of the provision are set out in the endnotes.

 

 

 

Contents

Chapter 1—Introduction

Part 11—Preliminary

Division 1—Preliminary

11 Short title

15 Commencement

110 Object of this Act

115 Administration of this Act

120 Extension to external Territories

125 Extraterritorial application

Part 12—A guide to this Act

Division 2—Overview of this Act

21 What this Act is about

25 How this Act is arranged

Division 3—Defined terms

31 When defined terms are identified

35 When terms are not identified

310 Identifying the defined term in a definition

Division 4—Status of guides and other nonoperative material

41 Nonoperative material

45 Guides

410 Other material

Chapter 2—General liability rules

Part 21—Core rules

Division 10—Core rules

101 A miner’s liability for MRRT

105 The MRRT liability for a mining project interest

1010 MRRT allowances

1015 The effect of low profits on a miner’s liability for MRRT

1020 Payment of MRRT

1025 MRRT years

Part 22—Mining project interests

Division 15—Mining project interests

Guide to Division 15

151 What this Division is about

Operative provisions

155 When an entity has a mining project interest

1510 Iron ore mining project interests to be kept separate

1515 Meaning of production right

1520 Meaning of project area

Division 20—Taxable resources

Guide to Division 20

201 What this Division is about

Operative provisions

205 What are taxable resources

Part 23—Mining profits

Division 25—Mining profits

Guide to Division 25

251 What this Division is about

Operative provisions

255 How to work out the mining profit for a mining project interest

Division 30—Mining revenue

Guide to Division 30

301 What this Division is about

Subdivision 30A—A miner’s mining revenue

305 A miner’s mining revenue

Subdivision 30B—Revenue from supply, export or use of taxable resources

3010 When amounts from taxable resources etc. are included in mining revenue

3015 Meaning of mining revenue event

3020 Meaning of initial supply

3025 Working out amounts to be included

3030 Meaning of arm’s length consideration

3035 When supplies are made

Subdivision 30C—Other revenue

3040 Recoupment or offsetting of mining expenditure

3045 Recoupment of payments that give rise to royalty credits

3050 Compensation for loss of taxable resources

3055 Amounts that do not relate to a particular mining revenue event

Subdivision 30D—Miscellaneous

3060 No double counting

3065 Expenditure incurred in causing amounts to be received etc.

3070 Amounts taken to be received

3075 GST and increasing adjustments

Division 35—Mining expenditure

Guide to Division 35

351 What this Division is about

Subdivision 35A—A miner’s mining expenditure

355 A miner’s mining expenditure

3510 General expenditure

3515 Meaning of upstream mining operations

3520 Meaning of mining operations

3525 No double counting

Subdivision 35B—Excluded expenditure

3535 Cost of acquiring rights and interests in projects

3540 Royalties

3545 Meanings of mining royalty and private mining royalty

3550 Financing costs

3555 Hire purchase agreements

3560 Nonadjacent land and buildings used in administrative or accounting activities

3565 Hedging or foreign exchange arrangements

3570 Rehabilitation bond and trust payments

3575 Payments of income tax or GST

3580 Unit shortfall charge—clean energy

Division 40—Valuation point

Guide to Division 40

401 What this Division is about

Operative provisions

405 Meaning of valuation point

Part 24—Low profit offsets

Division 45—Low profit offsets

Guide to Division 45

451 What this Division is about

Operative provisions

455 Low profit offset—profits not greater than $75 million

4510 Low profit offset—profits greater than $75 million and less than $125 million

Part 25—Payment of MRRT

Division 50—How to work out when to pay MRRT

Guide to Division 50

501 What this Division is about

Operative provisions

505 When assessed MRRT is payable

5010 When shortfall interest charge is payable

5015 General interest charge payable on unpaid assessed MRRT or shortfall interest charge

Chapter 3—MRRT allowances

Part 31—Royalty allowances

Division 60—Royalty allowances

Guide to Division 60

601 What this Division is about

Operative provisions

605 Objects of this Division

6010 When a miner has a royalty allowance

6015 The amount of a royalty allowance

6020 When a royalty credit arises

6025 Amount of a royalty credit

6030 Royalty credits reduced by recoupments

Part 32—Transferred royalty allowances

Division 65—Transferred royalty allowances

Guide to Division 65

651 What this Division is about

Operative provisions

655 Object of this Division

6510 When a miner has a transferred royalty allowance

6515 The amount of a transferred royalty allowance

6520 Available royalty credits

Part 33—Premining loss allowances

Division 70—Premining loss allowances

Guide to Division 70

701 What this Division is about

Subdivision 70A—Object of this Division

705 Objects of this Division

Subdivision 70B—When a miner has a premining loss allowance

7010 When a miner has a premining loss allowance

7015 The amount of a premining loss allowance

7020 Available premining losses for a premining loss allowance

7025 Meaning of premining project interest etc.

Subdivision 70C—Premining losses

7030 Premining losses

7035 Meaning of premining expenditure etc.

7040 Meaning of premining revenue

Subdivision 70D—Amounts of premining losses

7045 Premining losses for the MRRT years in which they arise

7050 Premining losses for later MRRT years

Part 34—Mining loss allowances

Division 75—Mining loss allowances

Guide to Division 75

751 What this Division is about

Operative provisions

755 Objects of this Division

7510 When a miner has a mining loss allowance

7515 The amount of a mining loss allowance

7520 Mining losses

Part 35—Starting base allowances

Division 80—Starting base allowances

Guide to Division 80

801 What this Division is about

Subdivision 80A—Objects of this Division

805 Objects of this Division

Subdivision 80B—When a miner has a starting base allowance

8010 When a miner has a starting base allowance

8015 The amount of a starting base allowance

8020 When a miner has a starting base loss

Subdivision 80C—Starting base assets

8025 Meaning of starting base asset

8030 Treating starting base assets as a single starting base asset

8035 Mine development expenditure may be a starting base asset

Subdivision 80D—Amounts of starting base losses

8040 Starting base losses for the MRRT years in which they arise

8045 Starting base losses for later MRRT years

8050 Mining project interests originating from premining project interests with different valuation approaches

Division 85—Valuation approaches

Guide to Division 85

851 What this Division is about

Operative provisions

855 Choosing a valuation approach

8510 Restriction on specifying the book value approach

8515 The valuation approach for a mining project interest

Division 90—Declines in value of starting base assets

Guide to Division 90

901 What this Division is about

Subdivision 90A—How to work out the decline in value of a starting base asset

905 How to work out the decline in value of a starting base asset

9010 Write off rates under the book value approach

9015 Write off rates under the market value approach

Subdivision 90B—Base values under the book value approach

9020 Application of this Subdivision

9025 Initial base value

9030 Later base values

Subdivision 90C—Base values under the market value approach

9035 Application of this Subdivision

9040 Initial base value

9045 Mining project interest originating from premining project interests etc.

9050 Later base values

Subdivision 90D—Miscellaneous

9055 Meaning of interim expenditure

9060 Partial disposal of a starting base asset before the start time

9065 Recoupment of the value of a starting base asset

Part 36—Transferred premining loss allowances

Division 95—Transferred premining loss allowances

Guide to Division 95

951 What this Division is about

Operative provisions

955 Object of this Division

9510 When a miner has a transferred premining loss allowance

9515 The amount of a transferred premining loss allowance

9520 Available premining losses for a transferred premining loss allowance

9525 Cap on available premining losses

9530 The premining loss cap

Part 37—Transferred mining loss allowances

Division 100—Transferred mining loss allowances

Guide to Division 100

1001 What this Division is about

Operative provisions

1005 Object of this Division

10010 When a miner has a transferred mining loss allowance

10015 The amount of a transferred mining loss allowance

10020 Available mining losses

10025 Common ownership test

Chapter 4—Specialist liability rules

Part 41—Mining project interests

Division 115—Combining mining project interests

Guide to Division 115

1151 What this Division is about

Subdivision 115A—Object of this Division

1155 Object of this Division

Subdivision 115B—When mining project interests are combined

11510 Mining project interests may be treated as the same mining project interest

11515 Choosing to override noncompliance

11520 Transferability of royalty credits

11525 Transferability of premining losses

11530 Transferability of mining losses

11535 Starting base losses and starting base assets

Subdivision 115C—The effect of combining mining project interests

11540 The effect of combining mining project interests

11545 Allowance components arising in preceding MRRT years

11550 Different valuation approaches for mining project interests

11555 Transferred premining loss allowances

11560 Transferred mining loss allowances

11565 Choice of the alternative valuation method

Division 120—Transferring mining project interests

Guide to Division 120

1201 What this Division is about

Operative provisions

1205 Object of this Division

12010 Effect of mining project transfer

12015 Effect of transferred property

12020 Events happening after mining project transfer

12025 Start of mining venture taken to be mining project transfer

Division 125—Splitting mining project interests

Guide to Division 125

1251 What this Division is about

Operative provisions

1255 Object of this Division

12510 Effect of mining project split

12515 Meaning of split percentage

12520 Effect of transferred property

12525 Effect of MRRT liability from earlier years on rehabilitation tax offset amounts

12530 Events happening after mining project split

12535 Start of mining venture taken to be mining project split

Division 130—Winding down mining project interests

Guide to Division 130

1301 What this Division is about

Operative provisions

1305 Object of this Division

13010 Suspension days for mining project interests

13015 Extinguishing allowance components

13020 Restarting commercial production

Division 135—Ending mining project interests

Guide to Division 135

1351 What this Division is about

Operative provisions

1355 The termination day for a mining project interest

13510 The effect of renewing or changing production rights

13515 The effect of renewing or changing mining ventures

13520 The effect of mining project transfers and mining project splits

13525 Continuation of obligations etc. after the termination day

Part 42—Premining project interests

Division 140—Premining profits and royalty credits

Guide to Division 140

1401 What this Division is about

Subdivision 140A—Premining profits

1405 Premining profits

14010 Treatment of premining profits—general rule

14015 Effect on allowance components for other mining project interests

14020 Treatment of premining profits—mining project interest originating from the premining project interest

Subdivision 140B—Premining royalty credits

14025 Premining royalty credits

Division 145—Transferring premining project interests

Guide to Division 145

1451 What this Division is about

Operative provisions

1455 Object of this Division

14510 Continuation of premining project interest

14515 Effects of premining project transfer

14520 Effect of transferred property

14525 Events happening after premining project transfer

14530 Premining project transfer when mining project interest originates

Division 150—Splitting premining project interests

1501 Guide to Division 150

Operative provisions

1505 Object of this Division

15010 Continuation of premining project interest

15015 Effects of premining project split

15020 Effect of transferred property

15025 Effect of MRRT liability from earlier years on rehabilitation tax offset amounts

15030 Events happening after premining project split

15035 Premining project split when mining project interest originates

Division 155—Ending premining project interests

Guide to Division 155

1551 What this Division is about

Operative provisions

1555 The termination day for a premining project interest

15510 The effect of renewing or changing exploration rights

15515 The effect of premining project transfers and premining project splits

15520 Continuation of obligations etc. after the termination day

15525 Extinguishing allowance components

Part 43—Adjusting MRRT liabilities

Division 160—Adjustments to revenue and expenditure of project interests

Guide to Division 160

1601 What this Division is about

Operative provisions

1605 Object of this Division

16010 Mining adjustments

16015 Effect of mining adjustments on mining revenue, mining expenditure etc.

Division 165—Starting base adjustments

Guide to Division 165

1651 What this Division is about

Subdivision 165A—Starting base adjustment events and starting base adjustment amounts

1655 Starting base adjustment events

16510 Starting base adjustment amounts

16515 Reductions in declines in value of starting base assets

Subdivision 165B—General rules for starting base adjustments

16520 Starting base adjustments

16525 The effect of starting base adjustments on starting base losses

16530 The effect of negative starting base adjustments on mining revenue

Subdivision 165C—Partial disposal of starting base assets

16535 Starting base adjustments for partial disposal of starting base assets

16540 Declines in value of retained parts of starting base assets

16545 Reductions in starting base losses

16550 Base value for the next MRRT year

Subdivision 165D—Miscellaneous

16555 Use etc. of starting base assets for other mining project interests etc.

16560 Effect on base value of use etc. of starting base assets after starting base adjustment events

Part 44—Valuation

Division 170—Valuation principles

Guide to Division 170

1701 What this Division is about

Operative provisions

1705 Valuations to comply with valuation principles

17010 The valuation principles

Division 175—Alternative valuation method

Guide to Division 175

1751 What this Division is about

Subdivision 175A—Object of this Division

1755 Object of this Division

Subdivision 175B—Choosing to use the alternative valuation method

17510 Choosing to use the alternative valuation method

17515 Group production of taxable resources

Subdivision 175C—Amounts included in mining revenue under the alternative valuation method

17520 When amounts are included in mining revenue under the alternative valuation method

17525 How to work out the single amount

17530 Unadjusted revenue amounts

17535 Downstream operating costs

17540 Depreciation of assets

17545 Return on capital costs

Division 180—Valuation of starting base assets using the lookback approach

Guide to Division 180

1801 What this Division is about

Operative provisions

1805 Choosing to apply the lookback approach

18010 The effect of the lookback approach on valuation of mining project interests

Part 45—Accounting for MRRT

Division 185—Currency translation

Guide to Division 185

1851 What this Division is about

Operative provisions

1855 Objects of this Division

18510 Translation of amounts into Australian currency

18515 Functional currency rules

18520 Functional currency rules—Australian permanent establishments

18525 Special translation rules

Division 190—Substituted accounting periods

Guide to Division 190

1901 What this Division is about

Operative provisions

1905 Object of this Division

19010 Accounting periods recognised for income tax purposes

19015 Changes in accounting periods

19020 The effect of transitional accounting periods on threshold amounts

19025 The effect of transitional accounting periods on uplift factors

Division 195—Noncash benefits

Guide to Division 195

1951 What this Division is about

Operative provisions

1955 Object of this Division

19510 Barter transactions

19515 Gift transactions

Division 200—Simplified MRRT method

Guide to Division 200

2001 What this Division is about

Operative provisions

2005 Effect of the simplified MRRT method

20010 Choosing to use the simplified MRRT method

20015 Working out an entity’s profit for simplified MRRT method purposes

Part 46—Integrity measures

Division 205—Antiprofit shifting

Guide to Division 205

2051 What this Division is about

Operative provisions

2055 Object of Division

20510 Amounts to reflect independent dealings

20515 Method to be used when determining amounts for the purposes of this Division

20520 Commissioner may compensate entity or another entity

20525 Commissioner determinations

Division 210—Antiavoidance

Guide to Division 210

2101 What this Division is about

Subdivision 210A—Application of this Division

2105 Object of this Division

21010 When does this Division apply?

21015 When does an entity get an MRRT benefit from a scheme?

21020 Matters to be considered in determining purpose

Subdivision 210B—Commissioner may negate effects of schemes for MRRT benefits

21025 Commissioner may negate entity’s MRRT benefits

21030 Commissioner may compensate entity or another entity

21035 One determination may cover several MRRT years etc.

21040 Commissioner must give copy of determination to entity affected

Part 47—Entities

Division 215—Consolidated groups

Guide to Division 215

2151 What this Division is about

Operative provisions

2155 Objects of this Division

21510 Choice to consolidate for MRRT purposes

21515 Single entity rule

21520 Project interests transferred to head company etc. on joining

21525 Project interests transferred to leaving entity on leaving

21530 Mining project interests etc. split to leaving entity on leaving

21535 Acquisition of consolidated group by another consolidated group etc.

21540 Instalment rates for leaving entity or new head company

21545 Effect of choice to continue group after shelf company becomes new head company

21550 Effect of change of head company or provisional head company of a MEC group

21555 Effect of group conversions involving MEC groups

Division 220—Partnerships and unincorporated associations and bodies

Guide to Division 220

2201 What this Division is about

Operative provisions

2205 Partnerships

22010 Unincorporated associations and bodies

Part 48—Miscellaneous

Division 225—Rehabilitation tax offsets

Guide to Division 225

2251 What this Division is about

Operative provisions

2255 Object of this Division

22510 Entitlement to rehabilitation tax offsets

22515 Rehabilitation tax offset amounts relating to mining project interests

22520 Rehabilitation tax offset amounts relating to premining project interests

22525 Application of rehabilitation tax offsets

Chapter 5—Miscellaneous

Division 235—Miscellaneous

2351 Regulations

Chapter 6—Interpreting this Act

Part 61—Rules for interpreting this Act

Division 245—Rules for interpreting this Act

2451 What forms part of this Act

2455 What does not form part of this Act

24510 Guides and other nonoperative provisions, and their role in interpreting this Act

Part 62—Meaning of some important concepts

Division 250—Meaning of hold

Guide to Division 250

2501 What this Division is about

Operative provisions

2505 Meaning of hold

25010 When certain starting base assets are held

25015 Things that are jointly held

Division 255—Integrated mining project interests

Guide to Division 255

2551 What this Division is about

Operative provisions

2555 Upstream integration of mining project interests

25510 Downstream integration of mining project interests

25515 Meaning of downstream mining operations

25520 Choice to integrate

Part 63—Dictionary

Division 300—Dictionary

3001 Dictionary

Endnotes

Endnote 1—Legislation history

Endnote 2—Amendment history

Endnote 3—Uncommenced amendments [none]

Endnote 4—Misdescribed amendments [none]

An Act about a minerals resource rent tax, and for related purposes

Chapter 1Introduction

Part 11Preliminary

Division 1Preliminary

11  Short title

  This Act may be cited as the Minerals Resource Rent Tax Act 2012.

15  Commencement

  This Act commences on 1 July 2012.

110  Object of this Act

  The object of this Act is to ensure that the Australian community receives an adequate return for its *taxable resources, having regard to:

 (a) the inherent value of the resources; and

 (b) the nonrenewable nature of the resources; and

 (c) the extent to which the resources are subject to Commonwealth, State and Territory royalties.

This Act does this by taxing above normal profits made by miners (also known as economic rents) that are reasonably attributable to the resources in the form and place they were in when extracted.

115  Administration of this Act

  The Commissioner has the general administration of this Act.

Note: An effect of this provision is that people who acquire information under this Act are subject to the confidentiality obligations in Division 355 in Schedule 1 to the Taxation Administration Act 1953.

120  Extension to external Territories

  The *MRRT law extends to every external Territory other than the Australian Antarctic Territory.

125  Extraterritorial application

  The *MRRT law extends to acts, omissions, matters and things outside *Australia (except where a contrary intention appears).

Part 12A guide to this Act

Division 2Overview of this Act

21  What this Act is about

This Act works out a miners MRRT liability on mining profits made from extracting taxable resources (mainly coal and iron ore) for a mining project interest for a year.

A mining project interest is principally a share of the output of an undertaking to extract taxable resources. Mining profit consists of mining revenue less mining expenditure. The sum of the miners mining profits for its interests are taxed at the MRRT rate.

Mining revenue is mainly that part of the revenue the miner makes from supplying, exporting or using extracted taxable resources (or things produced from them) that reasonably relates to the form and place the resources were in at their valuation point (usually when leaving the runofmine stockpile).

Mining expenditure is mainly the costs of finding and extracting the taxable resources and getting them to their valuation point.

Mining profit may be reduced by allowances for past losses, for the miners existing investments at 2 May 2010 (called a starting base allowance), and for the miners Commonwealth, State and Territory mining royalty amounts. Some allowances can be transferred to other mining project interests to reduce their mining profits.

If the total mining profits of the miner and certain connected entities is $75 million or less, a lowprofit offset will ensure that the miner has no liability for MRRT. The offset is phasedout for profits between $75 million and $125 million.

25  How this Act is arranged

 (1) This Act is arranged in a way that reflects the principle of moving from the general case to the particular.

 (2) In this respect, the conceptual structure of the Act is something like a pyramid. The pyramid shape illustrates the way the MRRT law is organised, moving down from the central or core provisions at the top of the pyramid, to general rules of wide application and then to the more specialised topics.

 

Note: Provisions relating to the administration of the MRRT and to collection and recovery of amounts of MRRT or instalments of MRRT are contained in Schedule 1 to the Taxation Administration Act 1953.

Division 3Defined terms

31  When defined terms are identified

 (1) Many of the terms used in the MRRT law are defined.

 (2) Most defined terms in this Act are identified by an asterisk appearing at the start of the term: as in *MRRT year.

35  When terms are not identified

 (1) Once a defined term has been identified by an asterisk, later occurrences of the term in the same subsection are not usually asterisked.

 (2) Terms are not asterisked in the nonoperative material contained in this Act.

Note: The nonoperative material is described in Division 4.

 (3) The following basic terms used throughout the Act are not identified with an asterisk:

 

Common definitions that are not asterisked

Item

Term

1

Commissioner

2

extract

3

miner

4

mining project interest

5

MRRT

310  Identifying the defined term in a definition

  Within a definition, the defined term is identified by bold italics.

Division 4Status of guides and other nonoperative material

41  Nonoperative material

 (1) In addition to the operative provisions themselves, this Act contains other material to help readers identify accurately and quickly the provisions that are relevant to them and to help them understand those provisions.

 (2) This other material falls into 2 main categories, see sections 45 and 410.

45  Guides

 (1) One category is the guide in many Divisions. Under the heading What this Division is about, a short explanation of the Division appears in boxed text.

 (2) Guides form part of this Act but are not operative provisions. In interpreting an operative provision, guides may only be considered for limited purposes. These are set out in subsection 24510(2).

410  Other material

  The other category consists of material such as notes and examples. These also form part of the Act. They are usually distinguished by font size from the operative provisions, but are not kept separate from them.

Chapter 2General liability rules

Part 21Core rules

Division 10Core rules

Table of sections

101 A miner’s liability for MRRT

105 The MRRT liability for a mining project interest

1010 MRRT allowances

1015 The effect of low profits on a miner’s liability for MRRT

1020 Payment of MRRT

1025 MRRT years

101  A miners liability for MRRT

  A miner is liable to pay MRRT, for an *MRRT year, equal to the sum of its *MRRT liabilities for each of its mining project interests for that year.

Note: For mining project interests, see Part 22.

105  The MRRT liability for a mining project interest

  Work out the miners MRRT liability for a mining project interest for an *MRRT year as follows:

  

Method statement

Step 1. Work out the miners *mining profit for the mining project interest for the *MRRT year.

 Note: For the mining profit, see Part 23.

Step 2. Work out the miners *MRRT allowances for the mining project interest for the *MRRT year.

 Note: For MRRT allowances, see section 1010.

Step 3. Subtract the *MRRT allowances from the *mining profit.

Step 4. Multiply the result by the *MRRT rate. This is the miners MRRT liability for the mining project interest for the *MRRT year.

 Note 1: For the MRRT rate, see section 3001.

 Note 2: If the result from step 3 is zero, the miners MRRT liability will also be zero.

1010  MRRT allowances

  The MRRT allowances, and the order in which they are applied in working out *MRRT liabilities, are as follows:

 

MRRT allowances

Item

Order of applying the MRRT allowances

See:

1

*Royalty allowance

Part 31

2

*Transferred royalty allowance

Part 32

3

*Premining loss allowance

Part 33

4

*Mining loss allowance

Part 34

5

*Starting base allowance

Part 35

6

*Transferred premining loss allowance

Part 36

7

*Transferred mining loss allowance

Part 37

Note: MRRT allowances are made up of allowance components, up to the amount of the relevant mining profit.

1015  The effect of low profits on a miners liability for MRRT

  If the miner has an offset under section 455 or 4510 for the *MRRT year, the amount of MRRT that the miner must pay for the MRRT year is reduced by the amount of the offset.

Note 1: For low profit offsets, see Part 24.

Note 2: A miner is not liable to pay MRRT for the MRRT year if the miner has chosen to use the simplified MRRT method under Division 200.

1020  Payment of MRRT

  The miner must pay to the Commonwealth its *assessed MRRT for the *MRRT year on or before the day on which the assessed MRRT becomes due and payable.

Note 1: For payment of MRRT, see Part 25.

Note 2: Division 115 in Schedule 1 to the Taxation Administration Act 1953 provides for payment of MRRT by instalments.

Note 3: Rehabilitation tax offsets reduce the amount of MRRT that the miner must pay: see section 22525.

1025  MRRT years

  An MRRT year is a *financial year starting on or after 1 July 2012.

Note: Other accounting periods may be MRRT years if a miner uses, for income tax purposes, an accounting period other than a financial year: see Division 190 (Substituted accounting periods).

Part 22Mining project interests

Division 15Mining project interests

Guide to Division 15

151  What this Division is about

The concept of a mining project interest is central to the MRRT. A miners liability is based on its MRRT liabilities for each of its mining project interests.

Note: Chapter 4 contains special rules about mining project interests, including combining, transferring and splitting of mining project interests, and their suspension and termination.

Table of sections

Operative provisions

155 When an entity has a mining project interest

1510 Iron ore mining project interests to be kept separate

1515 Meaning of production right

1520 Meaning of project area

Operative provisions

155  When an entity has a mining project interest

Mining project interest arising from a mining venture

 (1) An *entity has a mining project interest to the extent that the entity is entitled to share in the output of a *mining venture in which the entity participates (whether actively or otherwise, and whether alone or with one or more other entities).

Note 1: There may be more than one mining venture to extract taxable resources from an area covered by a production right.

Note 2: Changing or renewing a mining venture does not necessarily cause the termination day of a mining project interest: see section 13515.

 (2) If the *mining venture relates to one or more *production rights, the *entity has a separate mining project interest in relation to each production right.

Example: Scouting Resources participates in a mining venture relating to the extraction of taxable resources from an area covered by 3 production rights. Scouting Resources has 3 mining project interests, one in relation to each production right.

Meaning of mining venture

 (3) An undertaking is a mining venture if the purpose, or a purpose, of the undertaking is:

 (a) to extract some or all of the *taxable resources from the area covered by one or more *production rights; and

 (b) to produce an output that is a taxable resource extracted under the authority of the production right or rights, or something produced using such a taxable resource.

Example: CheckCo and BelCo enter into a contractual arrangement under which they agree to jointly extract and process iron ore from the whole area covered by a mining lease, and each take an equal share of the ore once it has been pelletised.

 Participation in this undertaking gives rise to a mining project interest for each of CheckCo and BelCo, comprising their respective entitlements to share in the pellets produced from the mining venture.

Residual mining project interest

 (4) An *entity has a mining project interest to the extent that:

 (a) the entity is entitled to extract *taxable resources from the area covered by a *production right; and

 (b) there is no *mining venture, relating to the extraction of those taxable resources, that gives rise to a mining project interest for one or more entities under subsection (1).

Note 1: The start of a mining venture relating to the extraction of those taxable resources is treated as a mining project transfer (if the venture relates to all of the resources), or otherwise, a mining project split: see section 12025 (for transfers) or 12535 (for splits).

Note 2: Changing or renewing a production right does not necessarily cause the termination day of a mining project interest: see section 13510.

Example: LesseeCo holds a mining lease, with a term of 21 years, to extract coal from an area. LesseeCo enters into a sublease with DiggerCo, giving DiggerCo the exclusive right to extract coal from the whole area for a period of 3 years.

 LesseeCo has a mining project interest under this subsection comprising its entitlement to extract coal from the area after the expiration of the 3 year sublease.

 If there is no mining venture relating to the coal that may be extracted under the sublease, DiggerCo has a mining project interest under this subsection comprising its entitlement to extract the coal under the sublease.

Further entitlements constitute new mining project interest

 (5) If, after the *entity becomes entitled as mentioned in subsection (1) or (4), the entity becomes so entitled to a further extent, the entity is taken to have a separate mining project interest corresponding to that further extent.

Note: The separate mining project interests are combined into a single mining project interest under Division 115 if the requirements of that Division are met.

Example: CheckCo and BelCo each have a mining project interest comprising an entitlement to share in the output of a mining venture in which they both participate.

 CheckCo transfers its interest in the mining venture to BelCo (Division 120, about transferring mining project interests, applies). BelCo then has a mining project interest comprising the entitlement it acquired from CheckCo to share in the output of the venture. That mining project interest is separate from CheckCos original mining project interest.

Royalties not to give rise to mining project interest

 (6) To avoid doubt, a *mining royalty or a *private mining royalty is not an output mentioned in subsection (1), unless it is a private mining royalty that is payable in kind.

Example: CheckCo and BelCo each participate in a mining venture that produces pelletised iron ore from the area covered by a production right. Under the contractual arrangement between the parties, CheckCo is entitled to take all the pelletised iron ore, and is required to pay BelCo an amount of money calculated by reference to the quantity of iron ore extracted under the mining venture.

 CheckCo has a mining project interest under subsection (1), BelCo does not.

 However, if CheckCo was required to pay BelCo in pelletised iron ore, BelCo would also have a mining project interest under subsection (1).

1510  Iron ore mining project interests to be kept separate

  If, apart from this section, a mining project interest would relate to both iron ore and *taxable resources other than iron ore, treat the interest as:

 (a) a mining project interest relating to iron ore; and

 (b) another mining project interest relating to taxable resources other than iron ore.

1515  Meaning of production right

 (1) A production right is:

 (a) an authority or right (however described) under an *Australian law to extract a *taxable resource from a particular area in *Australia; or

 (b) if an authority or right (however described) under an Australian law is not required to extract a taxable resource from a particular area—an interest in an area in *Australia that allows a person to extract a taxable resource from the area.

Examples: The following are some examples of production rights:

(a) a mining lease;

(b) a mining lease subject to environmental approval;

(c) a mining licence.

 (2) However, an *exploration right is not a production right.

Note: An exploration right may give rise to a premining project interest: see section 7025.

1520  Meaning of project area

  The project area for a mining project interest is so much of the area covered by a *production right as is:

 (a) for a mining project interest arising under subsection 155(1)—the area to which the *mining venture mentioned in that subsection relates; or

 (b) for a mining project interest arising under subsection 155(4)—the area to which the entitlement giving rise to the mining project interest relates.

Note: The project area for a mining project interest may also be, or be part of, the project area for another mining project interest.

Division 20Taxable resources

Guide to Division 20

201  What this Division is about

The concept of a taxable resource is central to whether an entity has a mining project interest, and to the other concepts (such as mining profits) that govern an entitys MRRT liabilities.

Table of sections

Operative provisions

205 What are taxable resources

Operative provisions

205  What are taxable resources

 (1) A taxable resource is a quantity of any of the following:

 (a) iron ore;

 (b) coal;

 (c) anything produced from a process that results in iron ore or coal being consumed or destroyed without extraction;

 (d) coal seam gas extracted as a necessary incident of mining coal.

Example: Gas extracted on an ongoing basis from a coal mine, or a proposed coal mine (if it is not extracted as part of a separate commercial operation) in order to comply with engineering requirements, mine safety laws or environmental conditions would be a taxable resource because its extraction is a necessary incident of mining the coal.

 Gas extracted before coal mining begins as part of an independent commercial operation would not be a taxable resource because its extraction would not be a necessary incident of coal mining. Instead, that gas would be subject to taxation under the Petroleum Resource Rent Tax Assessment Act 1987.

 (2) In deciding whether something is a taxable resource, disregard:

 (a) the use to which it is or will be put; and

 (b) what is or will be produced from it after extraction.

 (3) A quantity of a thing may be a taxable resource even if its extent is not known (for example, before it is extracted).

Part 23Mining profits

Division 25Mining profits

Guide to Division 25

251  What this Division is about

A miners mining profit is a component of its MRRT liability for a mining project interest for an MRRT year. It is the excess of mining revenue over mining expenditure for the interest for the year.

Table of sections

Operative provisions

255 How to work out the mining profit for a mining project interest

Operative provisions

255  How to work out the mining profit for a mining project interest

  Work out a miners mining profit for a mining project interest for an *MRRT year as follows:

  

Method statement

Step 1. Work out the miners *mining revenue for the mining project interest for the *MRRT year.

 Note: For the mining revenue, see Division 30.

Step 2. Work out the miners *mining expenditure for the mining project interest for the *MRRT year.

 Note: For the mining expenditure, see Division 35.

Step 3. If the *mining revenue exceeds the *mining expenditure, the difference is the miners mining profit for the mining project interest for the *MRRT year.

Step 4. If the *mining revenue does not exceed the *mining expenditure, the miners mining profit for the mining project interest for the *MRRT year is zero.

 Note: Mining expenditure that exceeds mining revenue is a mining loss that may be applied in working out a mining loss allowance (see Part 34) or a transferred mining loss allowance (see Part 37).

Division 30Mining revenue

Table of Subdivisions

 Guide to Division 30

30A A miner’s mining revenue

30B Revenue from supply, export or use of taxable resources

30C Other revenue

30D Miscellaneous

Guide to Division 30

301  What this Division is about

A miner’s mining revenue for a mining project interest may consist of revenue from:

 (a) taxable resources extracted from the project area for the mining project interest, to the extent that the revenue is reasonably attributable to the taxable resources in the form and place they were in when they were at their valuation point; and

 (b) recoupment of mining expenditure relating to the mining project interest; and

 (c) compensation for loss of taxable resources for the mining project interest; and

 (d) amounts for supply of taxable resources if the amounts are not attributable to particular taxable resources.

Subdivision 30AA miner’s mining revenue

Table of sections

305 A miner’s mining revenue

305  A miner’s mining revenue

  A miner’s mining revenue for a mining project interest that the miner has, for an *MRRT year, is the sum of all the amounts that, under this Act, are included in the miner’s mining revenue for that interest for that year.

Note: Most of the amounts are covered by this Division. However, the following amounts may also be included in a miner’s mining revenue:

(a) amounts that are in effect recoupment of the value of starting base assets (see section 9065);

(b) certain premining profits (see section 14020);

(c) amounts arising as a result of adjustments to take account of changes in circumstances (see Division 160);

(d) amounts arising as a result of balancing adjustment events for starting base assets (see Division 165).

Subdivision 30BRevenue from supply, export or use of taxable resources

Table of sections

3010 When amounts from taxable resources etc. are included in mining revenue

3015 Meaning of mining revenue event

3020 Meaning of initial supply

3025 Working out amounts to be included

3030 Meaning of arm’s length consideration

3035 When supplies are made

3010  When amounts from taxable resources etc. are included in mining revenue

  An amount is included in a miner’s mining revenue for a mining project interest for an *MRRT year if:

 (a) a *taxable resource has been extracted from the *project area for the mining project interest; and

 (b) during the year, a *mining revenue event happens in relation to the taxable resource.

3015  Meaning of mining revenue event

 (1) A mining revenue event happens in relation to a *taxable resource extracted from the *project area for a mining project interest if the miner who has the interest:

 (a) makes an *initial supply of the taxable resource, but not after its exportation from *Australia; or

 (b) exports the taxable resource from Australia, but not after paragraph (a) has applied to the taxable resource; or

 (c) makes an initial supply of or uses, or exports from Australia, something produced using the taxable resource, but not after:

 (i) paragraph (a) or (b) has already applied in relation to the taxable resource; or

 (ii) this paragraph has already applied in relation to the thing produced using the taxable resource.

Note: There is at least one mining revenue event in relation to each quantity of taxable resource. However, there could only be more than one mining revenue event in relation to a quantity of taxable resource if more than one thing is produced from it.

Example: There are 2 mining revenue events in relation to a quantity of coal if it is extracted then consumed producing both electricity and flyash.

 (2) However, a mining revenue event does not happen for use of a thing produced using a *taxable resource, to the extent that:

 (a) the use takes place in the course of operations or activities of a kind mentioned in paragraph 3520(1)(a) for the mining project interest; and

 (b) those operations or activities do not involve doing anything to, or with, other taxable resources extracted from the *project area for the interest after those other taxable resources reach the form and location they are in when a mining revenue event happens in relation to them; and

 (c) the use does not give rise to:

 (i) an amount of *mining expenditure for the miner; or

 (ii) an amount that is taken into account for the miner under step 2 of the method statement in section 3025; or

 (iii) an amount that is taken into account for the miner under step 3 of the method statement in section 17525 (alternative valuation method).

3020  Meaning of initial supply

 (1) An initial supply of a *taxable resource, or something produced using a taxable resource, is the first *supply of the taxable resource or thing a miner makes, disregarding a supply covered by subsection (2).

 (2) However, a *supply of a *taxable resource, or something produced using such a taxable resource, is not an initial supply if:

 (a) the supply is made between *entities in the course of a *mining venture in relation to which each of the entities has a mining project interest; or

 (b) the supply does not result in a change in the ownership of the taxable resource or the thing produced using such a taxable resource.

3025  Working out amounts to be included

 (1) Work out the amount to be included under section 3010, in relation to a *mining revenue event that happens in relation to a *taxable resource, as follows:

Method statement

Step 1. Work out under subsection (2) the revenue amount for the *mining revenue event.

Step 2. Using the method that satisfies subsection (3), work out how much of that revenue amount is reasonably attributable to the *taxable resource:

 (a) in the form in which it existed when it was at its *valuation point; and

 (b) at the place where it was located when it was at its valuation point.

 The amount worked out under this step is the amount to be included under section 3010.

Revenue amount

 (2) The revenue amount mentioned in step 1 of the method statement in subsection (1) is:

 

Working out the revenue amount

Item

Column 1
If the amount to be included relates to ...

Column 2
Then the revenue amount is ...

1

A *supply of the *taxable resource, or a thing produced using the taxable resource

The consideration received or receivable for the supply

2

An exportation from *Australia of the *taxable resource, or a thing produced using the taxable resource

What would be the *arm’s length consideration for a *supply of the taxable resource or thing at the time and place the taxable resource or thing is loaded for export

3

Use of a thing produced from the *taxable resource

What would be the *arm’s length consideration for a *supply of the thing at the time and place of the use.

Note: Supplies covered by item 1 of the table that are not at arm’s length may, in appropriate cases, attract the operation of Division 205 (antiprofit shifting).

 (3) The method to use in step 2 of the method statement in subsection (1) is the one that produces the most appropriate and reliable measure of how much of the revenue amount is reasonably attributable as mentioned in that step, having regard to:

 (a) the miner’s circumstances, including, but not limited to, the functions performed, assets used, and risks borne by the miner in carrying on its *mining operations, *transformative operations and *resource marketing operations for the mining project interest; and

 (b) the available information.

 (4) In using the method that satisfies subsection (3), make the following assumptions, to the extent that they are relevant to that method:

 (a) that a distinct and separate *entity (the notional downstream entity) does all the things (including using all the assets) that the miner actually does in carrying on the *downstream mining operations, *transformative operations and *resource marketing operations for the mining project interest;

 (b) that the notional downstream entity does not acquire an interest in the *taxable resource;

 (c) that the miner and the notional downstream entity deal wholly independently with one another;

 (d) that:

 (i) there is a market for what the notional downstream entity is assumed by paragraph (a) to do; and

 (ii) that market is competitive in the sense that the returns to the notional downstream entity would be no more or less than are necessary for it to commit capital, and in particular are commensurate with the nondiversifiable risks inherent in the things it does.

 (5) Without limiting subsection (3), a miner is taken for the purposes of step 2 in the method statement in subsection (1) to use the method that satisfies subsection (3) if the miner works out how much of the revenue amount is reasonably attributable as mentioned in that step by:

 (a) reducing the revenue amount by an amount that, having regard to the matters mentioned in paragraphs (3)(a) and (b), is sufficient for a notional downstream entity to recover the following costs relating to the things it is assumed by subsection (4) to do, and the circumstances in which it is assumed by that subsection to do them:

 (i) any operating costs;

 (ii) any depreciation of assets;

 (iii) a cost of capital sufficient to justify the continued commitment of the capital; and

 (b) adding back to the revenue amount so much (if any) of the costs mentioned in paragraph (a) of this subsection as relate to things done to the extent that they were not taken into account in the revenue amount.

However, the costs mentioned in paragraph (a) of this subsection only include costs to the extent that they reasonably relate to the *mining revenue event.

Meaning of transformative operations

 (6) Operations or activities are transformative operations, for a mining project interest, to the extent that the operations or activities:

 (a) are operations or activities of a kind mentioned in paragraph 3520(1)(a) for the mining project interest; and

 (b) involve doing something to, or with, the *taxable resources after they reach the form and location they are in when they are first applied to producing something in relation to which a *mining revenue event of a kind mentioned in paragraph 3015(1)(c) happens; and

 (c) do not involve doing anything to, or with, those taxable resources after they reach the form and location they are in when that mining revenue event happens.

 (7) Operations or activities are resource marketing operations, for a mining project interest, to the extent that the operations or activities involve marketing, selling, shipping or delivering of:

 (a) *taxable resources in relation to which a *mining revenue event mentioned in paragraph 3015(1)(a) or (b) happens; or

 (b) things produced using taxable resources in relation to which a mining revenue event mentioned in paragraph 3015(1)(c) happens.

3030  Meaning of arm’s length consideration

 (1) The arm’s length consideration for a *supply is the amount that would reasonably be expected to be received or receivable by the miner as consideration for the supply if:

 (a) the miner made the supply under an agreement between the miner and another *entity; and

 (b) they were dealing wholly independently with one another in relation to the supply.

 (2) The method used to determine that amount is to be the method that produces the most appropriate and reliable measure of that amount having regard to:

 (a) the miner’s circumstances, including, but not limited to, the functions performed, assets used, and risks borne by the miner in carrying on its *mining operations, *transformative operations and *resource marketing operations for the mining project interest; and

 (b) the available information.

 (3) However, if it is not possible to work out the arm’s length consideration in accordance with subsections (1) and (2), the arm’s length consideration for a *supply is the amount that is, in the Commissioner’s opinion, fair and reasonable.

3035  When supplies are made

  Treat the time when a miner makes a *supply for the purposes of this Act as the earliest of the following:

 (a) when consideration for the supply is received or becomes receivable;

 (b) when what is being supplied is delivered;

 (c) when ownership of what is being supplied passes.

Subdivision 30COther revenue

Table of sections

3040 Recoupment or offsetting of mining expenditure

3045 Recoupment of payments that give rise to royalty credits

3050 Compensation for loss of taxable resources

3055 Amounts that do not relate to a particular mining revenue event

3040  Recoupment or offsetting of mining expenditure

 (1) An amount is included in a miner’s *mining revenue for a mining project interest for an *MRRT year to the extent that:

 (a) during the year, the amount is received, or becomes receivable, by any of the following *entities:

 (i) the miner;

 (ii) an entity *connected with the miner;

 (iii) an *affiliate of the miner;

 (iv) an entity of which the miner is an affiliate;

 (v) an affiliate of an entity covered by subparagraph (ii);

 (vi) an entity connected with an entity covered by subparagraph (ii), (iii) or (iv); and

 (b) payment of the amount has, or would have, the purpose or effect of *recouping or offsetting some or all of an amount of expenditure (including future expenditure); and

 (c) the amount does not give rise to an adjustment under Division 160 (adjustments for changes in circumstances).

Example: In the 201213 MRRT year, a miner receives a subsidy for employing apprentices. In the 201314 MRRT year, the miner incurs mining expenditure for the relevant mining project interest in the form of wages paid to the apprentices.

 To the extent that the subsidy offsets those wages, it is included in the miner’s mining revenue for the mining project interest for the 201213 MRRT year.

 (2) However, that amount is reduced (if necessary) to reflect the proportion of the amount of expenditure mentioned in paragraph (1)(b) that is, or will be, included in *mining expenditure for the mining project interest.

Note: The amount of that mining expenditure is adjusted if an adjustment arises under Division 160 in relation to that mining expenditure: see subsection 16015(5).

3045  Recoupment of payments that give rise to royalty credits

  An amount is included in a miner’s *mining revenue for a mining project interest for an *MRRT year if the amount is an excess royalty recoupment mentioned in subsection 6030(2) for the interest.

Note: Royalty recoupments are generally applied to reduce royalty credits under section 6030. However, if there are insufficient royalty credits the excess is mining revenue under this section.

3050  Compensation for loss of taxable resources

 (1) An amount is included in a miner’s *mining revenue for a mining project interest for an *MRRT year to the extent that:

 (a) during the year, the amount is received, or becomes receivable, by any of the following *entities:

 (i) the miner;

 (ii) an entity *connected with the miner;

 (iii) an *affiliate of the miner;

 (iv) an entity of which the miner is an affiliate;

 (v) an affiliate of an entity covered by subparagraph (ii);

 (vi) an entity connected with an entity covered by subparagraph (ii), (iii) or (iv); and

 (b) the amount is by way of insurance, compensation or indemnity relating to loss of, destruction of or damage that:

 (i) happens to a *taxable resource extracted from the *project area for the mining project interest, or to a thing produced using such a taxable resource; and

 (ii) happens before a *mining revenue event happens in relation to the taxable resource; and

 (c) the amount is reasonably attributable to the taxable resource, as mentioned in step 2 of the method statement in subsection 3025(1).

 (2) Work out the extent to which the amount is reasonably attributable to the *taxable resource as so mentioned by applying section 3025 as if the amount were a revenue amount under subsection 3025(2).

3055  Amounts that do not relate to a particular mining revenue event

 (1) An amount is included in a miner’s *mining revenue for a mining project interest for an *MRRT year to the extent that:

 (a) during the year, the amount is received, or becomes receivable, by the miner; and

 (b) the amount is received, or becomes receivable, for a *supply, or a proposed supply, of:

 (i) *taxable resources extracted, or proposed to be extracted, from the *project area for the mining project interest; or

 (ii) things produced, or proposed to be produced, using such taxable resources; and

 (c) the amount does not relate to a particular *mining revenue event.

 (2) However, subsection (1) does not apply if the only reason the amount does not relate to a particular *mining revenue event is that paragraph 3020(2)(a) prevents the supply from being an *initial supply.

Subdivision 30DMiscellaneous

Table of sections

3060 No double counting

3065 Expenditure incurred in causing amounts to be received etc.

3070 Amounts taken to be received

3075 GST and increasing adjustments

3060  No double counting

  If 2 or more provisions of this Act include the same amount in a miner’s *mining revenue (whether for the same *MRRT year or different MRRT years), the amount is included only under the provision that is most appropriate.

3065  Expenditure incurred in causing amounts to be received etc.

  An amount that, under Subdivision 30B or 30C, is to be included in a miner’s *mining revenue for a mining project interest for an *MRRT year is reduced to the extent that:

 (a) the miner necessarily incurred any expenditure in enforcing the miner’s entitlement to receive the amount; and

 (b) the expenditure does not relate to any other amount; and

 (c) the expenditure was not *mining expenditure for the mining project interest; and

 (d) the expenditure was not *excluded expenditure.

Note: This section ensures that the costs associated with mining revenue, but not dealt with under Division 35, are taken into account.

Example: If a miner undertakes litigation to receive compensation for damage to the miner’s taxable resources, the amount included in the miner’s mining revenue under section 3050 would be reduced under this section to take account of the miner’s litigation costs.

3070  Amounts taken to be received

  For the purposes of the *MRRT law, an amount that is not actually to be paid over to a miner is taken to be received by the miner if it is, and when it is, applied or otherwise dealt with on behalf of the miner or as the miner directs.

3075  GST and increasing adjustments

  An amount that, under this Division, is to be included in the miner’s *mining revenue does not include:

 (a) any *GST payable on a *supply for which the amount is the consideration, or part of the consideration; or

 (b) any *increasing adjustments that relate to such a supply.

Division 35Mining expenditure

Table of Subdivisions

 Guide to Division 35

35A A miner’s mining expenditure

35B Excluded expenditure

Guide to Division 35

351  What this Division is about

A miners mining expenditure for a mining project interest includes expenditure necessarily incurred in carrying on mining operations upstream of the valuation point.

However, some expenditure is specifically excluded.

Note: For premining expenditure, see section 7035.

Subdivision 35AA miners mining expenditure

Table of sections

355 A miner’s mining expenditure

3510 General expenditure

3515 Meaning of upstream mining operations

3520 Meaning of mining operations

3525 No double counting

355  A miners mining expenditure

 (1) A miners mining expenditure for a mining project interest that the miner has, for an *MRRT year, is the sum of all the amounts that, under this Act, are included in the miners mining expenditure for that interest for that year.

Note: Most of the amounts are covered by this section. However, the following amounts may also be included in a miner’s mining expenditure:

(a) amounts arising as a result of adjustments to take account of changes in circumstances (see Division 160);

(b) amounts arising as a result of changed use of starting base assets (see section 16555).

 (2) However, an amount is not included in the miners mining expenditure for the mining project interest for the *MRRT year to the extent that it is *excluded expenditure.

Note: For excluded expenditure, see Subdivision 35B.

3510  General expenditure

 (1) An amount of expenditure is included in a miner’s *mining expenditure for a mining project interest for an *MRRT year to the extent that the miner necessarily incurred the amount, in that year, in the carrying on (by the miner or another *entity) of *upstream mining operations for the mining project interest.

 (2) The expenditure may be of either a capital or revenue nature.

3515  Meaning of upstream mining operations

  *Mining operations for a mining project interest are upstream mining operations for the mining project interest to the extent the operations:

 (a) are operations or activities of a kind mentioned in paragraph 3520(1)(a) for the mining project interest; and

 (b) do not involve doing anything to, or with, the *taxable resources extracted from the *project area for the mining project interest after those taxable resources reach their *valuation point.

Examples: The following are some examples of operations or activities that might be upstream mining operations:

(a) obtaining the agreement of native title holders as part of the process of obtaining a production right over the project area;

(b) exploring for taxable resources in the project area;

(c) crushing and weighing the taxable resources before they reach their valuation point;

(d) training, engaging, employing, paying, accommodating and ensuring the safety of personnel, and other supportive head office activities, to the extent they are involved in operations or activities relating to getting the taxable resource to the valuation point;

(e) developing plans and engineering specifications for, and constructing, facilities (whether in the project area or not) to be used in recovering, transporting and storing the taxable resources before they reach their valuation point;

(f) acquiring and maintaining plant or equipment for use in recovering, transporting or storing the taxable resources before they reach their valuation point;

(g) upgrading computer software used to control inventory (like consumables and spare parts) used for recovering, transporting or storing the taxable resources before they reach their valuation point;

(h) rehabilitation of a project area from damage caused by activities relating to the exploration, extraction and movement of taxable resources to the valuation point.

Note: For downstream mining operations, see section 25515.

3520  Meaning of mining operations

 (1) Operations or activities are mining operations, for a mining project interest, to the extent that the operations or activities:

 (a) are preliminary or integral to, or consequential upon:

 (i) extracting or producing *taxable resources from the *project area for the mining project interest; or

 (ii) producing something using those taxable resources; but

 (b) do not involve doing anything to, or with, those taxable resources after they reach the form and location they are in when:

 (i) a *mining revenue event of a kind mentioned in paragraph 3015(1)(a) or (b) happens in relation to them; or

 (ii) they are first applied to producing something in relation to which a mining revenue event of a kind mentioned in paragraph 3015(1)(c) happens.

 (2) Without limiting subsection (1), the following activities are mining operations for a mining project interest:

 (a) *exploration or prospecting for *taxable resources in the *project area for the mining project interest;

 (b) extracting taxable resources from the project area;

 (c) doing anything to, or with, taxable resources extracted or produced from the project area before they reach the form and location they are in when a *mining revenue event happens in relation to them;

 (d) obtaining access to the project area for any of the other activities mentioned in this subsection (other than paragraph (h));

 (e) acquiring, constructing or maintaining anything to be used, or reasonably expected to be used, for any of the activities mentioned in any of paragraphs (a) to (d) (even if no such activity is happening at the time the acquisition, construction or maintenance happens);

 (f) rehabilitating the project area, or any other land affected by any activity mentioned in any of paragraphs (a) to (e);

 (g) closing down any activity mentioned in any of paragraphs (a) to (f);

 (h) any activity done in furtherance of an activity mentioned in any of paragraphs (a) to (g).

3525  No double counting

  If 2 or more provisions of this Act include the same amount in a miners *mining expenditure (whether for the same *MRRT year or a different MRRT year), the amount is included only under the provision that is most appropriate.

Subdivision 35BExcluded expenditure

Table of sections

3535 Cost of acquiring rights and interests in projects

3540 Royalties

3545 Meanings of mining royalty and private mining royalty

3550 Financing costs

3555 Hire purchase agreements

3560 Nonadjacent land and buildings used in administrative or accounting activities

3565 Hedging or foreign exchange arrangements

3570 Rehabilitation bond and trust payments

3575 Payments of income tax or GST

3580 Unit shortfall charge—clean energy

3535  Cost of acquiring rights and interests in projects

 (1) An amount of expenditure is excluded expenditure to the extent that it relates to acquiring, or acquiring an interest in, a *production right covering an area, unless the expenditure is in relation to the grant of the production right.

 (2) An amount of expenditure is excluded expenditure to the extent that it relates to acquiring a mining project interest.

 (3) An amount of expenditure is excluded expenditure to the extent that it relates to acquiring an interest in profits, receipts or expenditures of, or relating to, a mining project interest.

3540  Royalties

 (1) An amount of expenditure is excluded expenditure to the extent that it is any of the following:

 (a) a *mining royalty;

 (b) a *private mining royalty;

 (c) a payment that gives rise to a *royalty credit under paragraph 6020(1)(b) (payments by way of recoupment for mining royalties).

 (2) Despite subsection (1), a *private mining royalty is not excluded expenditure, to the extent that:

 (a) it is paid to an *entity as consideration for the entity performing services that form part of *upstream mining operations for a mining project interest; and

 (b) it does not represent a share of the profits made from a *mining venture to which a mining project interest relates.

 (3) Despite subsection (1), a *private mining royalty is not excluded expenditure to the extent that it is paid to an entity under an agreement entered into with the entity:

 (a) before 2 May 2010; and

 (b) at a time when the entity is an STB (within the meaning of Division 1AB of Part III of the Income Tax Assessment Act 1936) other than an *excluded STB.

 (4) Despite subsection (1), a *private mining royalty is not excluded expenditure, to the extent that it is by way of consideration for the carrying on of *mining operations in the *project area for a mining project interest, if it is paid:

 (a) to a native title holder (within the meaning of the Native Title Act 1993) whose approved determination of native title (within the meaning of that Act) relates to the project area for the mining project interest; or

 (b) to a registered native title claimant (within the meaning of the Native Title Act 1993) whose claimant application (within the meaning of that Act) relates to the project area for the mining project interest; or

 (c) to a person who holds a right that:

 (i) arises under another *Australian law dealing with the rights of *Aboriginal persons or *Torres Strait Islanders in relation to land or waters; and

 (ii) relates to the project area for the mining project interest.

 (5) To the extent a *private mining royalty is not *excluded expenditure because of subsection (3) or (4), it is not excluded expenditure under section 3535.

3545  Meanings of mining royalty and private mining royalty

 (1) An amount of expenditure is a mining royalty to the extent the expenditure:

 (a) is made in relation to a *taxable resource extracted under authority of a *production right; and

 (b) is made under a *Commonwealth law, a *State law or a *Territory law; and

 (c) either:

 (i) is a *royalty; or

 (ii) would be a royalty, if the taxable resource were owned by the Commonwealth, State or Territory (as the case requires) just before the recovery of the resource.

Note: Subparagraph (1)(c)(ii) covers a case where an amount is payable under an Australian law in relation to minerals owned by private landowners.

 (2) An amount of expenditure is a private mining royalty if:

 (a) it is:

 (i) a *taxable resource or a quantity of something produced using a taxable resource; or

 (ii) calculated by reference to a taxable resource or a quantity of something produced using a taxable resource; or

 (iii) calculated by reference to the gross or net value of a taxable resource or something produced using a taxable resource; or

 (iv) calculated by reference to the revenue, expenditure or profits made or incurred by an *entity in relation to a taxable resource or a quantity of something produced using a taxable resource; and

 (b) it is not a *mining royalty.

3550  Financing costs

  An amount of expenditure is excluded expenditure to the extent that it relates to:

 (a) an *arrangement that gives rise to a *financial arrangement; or

 (b) an *equity interest that is a financial arrangement; or

 (c) a *scheme that gives rise to an equity interest issued by the miner.

Examples:

(a) borrowing costs, exit fees or interest payments relating to a loan, or repayments of principal; and

(b) payments of dividends or payments for buying back or cancelling shares.

3555  Hire purchase agreements

 (1) An amount of expenditure is excluded expenditure to the extent that it relates to a *hire purchase agreement.

 (2) However, if an amount of expenditure is excluded expenditure for a miner under subsection (1) in relation to a *hire purchase agreement:

 (a) the miner is taken to have incurred the amount mentioned in subsection (3) at the earliest time at which the property is *supplied to the miner under the agreement; and

 (b) the miner is taken to have acquired the property for that amount at the time the amount is incurred; and

 (c) the amount is not excluded expenditure under subsection (1) or section 3550.

 (3) For the purposes of paragraph (2)(a), the amount is:

 (a) if an amount is stated to be the cost or value of the property for the purposes of the agreement, and the miner and the hirer were dealing with each other at *arms length in connection with the agreement—the amount so stated; or

 (b) otherwise—the amount that could reasonably have been expected to have been paid by the miner for the purchase of the property if:

 (i) the hirer had actually sold the property to the miner at the start of the agreement; and

 (ii) the hirer and the miner were dealing with each other at arms length in connection with the sale.

Note: The amount may be mining expenditure under this Division.

3560  Nonadjacent land and buildings used in administrative or accounting activities

  An amount of expenditure is excluded expenditure to the extent that:

 (a) it relates to land or buildings that are not located at or adjacent to the *project area for a mining project interest that the miner has; and

 (b) the land or buildings are for use in connection with administrative or accounting activities; and

 (c) the expenditure is of a capital nature.

3565  Hedging or foreign exchange arrangements

  An amount of expenditure is excluded expenditure to the extent that it relates to:

 (a) a *derivative financial arrangement; or

 (b) a *foreign currency hedge.

3570  Rehabilitation bond and trust payments

 (1) An amount of expenditure is excluded expenditure to the extent that it is provided as security (however described) for rehabilitation of the *project area for a mining project interest.

 (2) An amount of expenditure that is incurred by a trustee or bondholder out of an amount provided as security as mentioned in subsection (1) is taken to have been incurred by a miner in relation to a mining project interest to the extent that:

 (a) the amount is for rehabilitation of an area; and

 (b) the area is the *project area for the mining project interest the miner has at the time the amount is incurred; and

 (c) if more than one miner has a mining project interest in relation to that project area at that time—the rehabilitation reasonably relates to the mining project interest.

Note: The trustee or bondholder is required to give the miner the information it needs to determine the extent, if any, to which the amount is mining expenditure for the miner: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

3575  Payments of income tax or GST

  An amount of expenditure is excluded expenditure to the extent that it is:

 (a) tax payable under the Income Tax Assessment Act 1936, or the Income Tax Assessment Act 1997; or

 (b) *GST; or

 (c) an amount relating to:

 (i) an *input tax credit to which the miner is entitled; or

 (ii) a *decreasing adjustment that the miner has; or

 (d) an amount of penalty or interest payable under a *taxation law.

3580  Unit shortfall charge—clean energy

  An amount of expenditure is excluded expenditure to the extent that it is unit shortfall charge (within the meaning of the Clean Energy Act 2011).

Division 40Valuation point

Guide to Division 40

401  What this Division is about

The concept of the valuation point is central to determining the revenue and expenditure that make up mining profit.

The valuation point is a defined point in the extractive process.

Table of sections

Operative provisions

405 Meaning of valuation point

Operative provisions

405  Meaning of valuation point

Resource is stored on runofmine stockpile

 (1) The valuation point for a *taxable resource is the point just before the resource is removed from the runofmine stockpile on which it is stored.

Resource is not stored on runofmine stockpile

 (2) The valuation point for a *taxable resource that is not stored on a runofmine stockpile is:

 (a) if the resource is moved away from the immediate point of extraction to a place, at or adjacent to the point of extraction, where the resource enters the first beneficiation process after extraction—the point at which the resource enters that beneficiation process; or

 (b) if paragraph (a) does not apply—the point at which the resource is first moved away from the immediate point of extraction.

Resource is in gaseous state

 (3) However, the valuation point for a *taxable resource that is in a gaseous state at the point mentioned in subsection (2) is the first point at which the gaseous resource exits a wellhead.

Exception where supply happens first

 (4) Despite subsections (1), (2) and (3), the valuation point for a *taxable resource is instead the point just before the *initial supply of the resource, if the time the resource is at that point is before the time it would be at the valuation point for the resource under subsection (1), (2) or (3).

Example: If, under an agreement, a resource is supplied to another party when the resource is delivered to the runofmine stockpile, the valuation point is just before the resource is delivered to the stockpile.

Part 24Low profit offsets

Division 45Low profit offsets

Guide to Division 45

451  What this Division is about

A miner is entitled to an offset for an MRRT year if the miner’s group mining profit for the year is less than $125 million.

If that profit is less than or equal to $75 million, an offset reduces the amount of MRRT the miner must pay for the year to nil.

An offset phases out between profits of $75 million and $125 million, so that the miner is not immediately subjected to a full MRRT liability when the miner’s group profit exceeds $75 million.

Table of sections

Operative provisions

455 Low profit offset—profits not greater than $75 million

4510 Low profit offset—profits greater than $75 million and less than $125 million

Operative provisions

455  Low profit offset—profits not greater than $75 million

 (1) A miner has an offset for an *MRRT year if the sum of the *mining profits (the miner’s group mining profit) for the year of each mining project interest of the following *entities is less than or equal to $75 million:

 (a) the miner;

 (b) an entity *connected with the miner;

 (c) an *affiliate of the miner;

 (d) an entity of which the miner is an affiliate;

 (e) an affiliate of an entity covered by paragraph (b);

 (f) an entity connected with an entity covered by paragraph (b), (c) or (d).

Note 1: An offset under this section reduces the amount of MRRT that a miner must pay for an MRRT year: see section 1015.

Note 2: If the MRRT year is not a 12month period, the miner’s group mining profit is affected by section 19020 (substituted accounting periods).

 (2) The amount of the miner’s offset for the *MRRT year is the sum of the miner’s *MRRT liabilities for each of the miner’s mining project interests for the year.

4510  Low profit offset—profits greater than $75 million and less than $125 million

 (1) A miner with a group mining profit greater than $75 million and less than $125 million for an *MRRT year has an offset for that year if the amount worked out using the following formula is greater than zero:

  

where:

miner’s group MRRT allowances is the sum of the *MRRT allowances for each mining project interest for the year that an *entity mentioned in subsection 455(1) has.

miner’s share of group mining profit is the sum of the miner’s *mining profit for each of its mining project interests for the year, divided by the miner’s group mining profit for the year.

taper amount is the difference between the miner’s group mining profit for the year and $50 million.

Note 1: An offset under this section reduces the amount of MRRT that a miner must pay for an MRRT year: see section 1015.

Note 2: If the MRRT year is not a 12month period, the miner’s group MRRT allowances and the miner’s share of group mining profit are affected by section 19020 (substituted accounting periods).

 (2) The amount of the miner’s offset for the *MRRT year is the amount worked out using the formula in subsection (1), multiplied by the *MRRT rate.

Example: For the 201314 MRRT year, Pinder Mines Ltd has a total mining profit of $80 million, a group mining profit of $100 million, group MRRT allowances of $10 million and a taper amount of $50 million ($100 million $50 million). The amount worked out using the formula in subsection (1) is $22 million:((($75 million $50 million) × 3/2) $10 million) × 4/5. Multiplying this amount by the MRRT rate gives Pinder Mines Ltd an offset for the year of $4.95 million.

Part 25Payment of MRRT

Division 50How to work out when to pay MRRT

Guide to Division 50

501  What this Division is about

Assessed MRRT that a miner is liable to pay, and any associated interest charges, must be paid to the Commissioner by the time provided under this Division.

Note 1: For payment of instalments, see Division 115 in Schedule 1 to the Taxation Administration Act 1953.

Note 2: For provisions about the collection and recovery of MRRT and other taxrelated liabilities, see Part 415 in Schedule 1 to the Taxation Administration Act 1953.

Table of sections

Operative provisions

505 When assessed MRRT is payable

5010 When shortfall interest charge is payable

5015 General interest charge payable on unpaid assessed MRRT or shortfall interest charge

Operative provisions

505  When assessed MRRT is payable

 (1) *Assessed MRRT that a miner must pay under section 1020 for an *MRRT year is due and payable on the first day of the sixth month after the end of the MRRT year.

Example: If the miners MRRT year is the same as the financial year, the assessed MRRT would be due and payable on 1 December.

Note: The Commissioner may defer the time at which the assessed MRRT is due and payable: see section 25510 in Schedule 1 to the Taxation Administration Act 1953.

 (2) To avoid doubt, the *assessed MRRT may be taken to have been due and payable at a time before the *assessment was made.

 (3) If the Commissioner amends a miners *assessment, any extra *assessed MRRT resulting from the amendment is due and payable 21 days after the day on which the Commissioner gives the miner notice of the amended assessment.

5010  When shortfall interest charge is payable

  An amount of *shortfall interest charge that a miner is liable to pay is due and payable 21 days after the day on which the Commissioner gives the miner notice of the charge.

Note 1: Shortfall interest charge may be payable, on any amount of extra assessed MRRT payable as a result of an amended assessment, for each day in the period that:

(a) starts at the time assessed MRRT was due and payable on the miners original assessment; and

(b) finishes on the day before the day on which the Commissioner gives the miner notice of the amended assessment.

Note 2: For provisions about liability for shortfall interest charge, see Division 280 in Schedule 1 to the Taxation Administration Act 1953.

5015  General interest charge payable on unpaid assessed MRRT or shortfall interest charge

  If an amount of *assessed MRRT or *shortfall interest charge that a miner is liable to pay remains unpaid after the time by which it is due to be paid, the miner is liable to pay the *general interest charge on the unpaid amount for each day in the period that:

 (a) starts at the beginning of the day on which the amount was due to be paid; and

 (b) finishes at the end of the last day on which, at the end of the day, any of the following remains unpaid:

 (i) the assessed MRRT or shortfall interest charge;

 (ii) general interest charge on any of the assessed MRRT or shortfall interest charge.

Note 1: The general interest charge is worked out under Part IIA of the Taxation Administration Act 1953.

Note 2: Shortfall interest charge is worked out under Division 280 in Schedule 1 to that Act.

Chapter 3MRRT allowances

Part 31Royalty allowances

Division 60Royalty allowances

Guide to Division 60

601  What this Division is about

Mining royalties paid to the Commonwealth, States and Territories reduce a miners MRRT liabilities for a mining project interest.

To work out the royalty allowance, the amount of the royalty is grossedup using the MRRT rate, in effect reducing the MRRT liability by the amount of the royalty.

Royalty credits that are not applied in an MRRT year are uplifted and may be able to be applied in later years.

Royalty credits are reduced if a miner recoups an amount giving rise to a royalty credit.

Note: Royalty credits that are not applied to a royalty allowance may be applied to transferred royalty allowances for other mining project interests (see Division 65).

Table of sections

Operative provisions

605 Objects of this Division

6010 When a miner has a royalty allowance

6015 The amount of a royalty allowance

6020 When a royalty credit arises

6025 Amount of a royalty credit

6030 Royalty credits reduced by recoupments

Operative provisions

605  Objects of this Division

  The objects of this Division are:

 (a) to reduce a miners *MRRT liability relating to profits relating to *taxable resources, to the extent those taxable resources are subject to Commonwealth, State and Territory royalties; and

 (b) to provide an uplift for unapplied *royalty credits, which compensates for:

 (i) the delay where royalty credits are applied in a later year; and

 (ii) the risk that royalty credits may not be able to be applied in a later year.

6010  When a miner has a royalty allowance

  A miner has a royalty allowance for a mining project interest for an *MRRT year if:

 (a) the miner has a *mining profit for the interest for the year; and

 (b) one or more *royalty credits (available royalty credits) relate to the interest.

6015  The amount of a royalty allowance

 (1) The amount of the miners *royalty allowance is so much of the sum of the available royalty credits as does not exceed the *mining profit.

 (2) In working out the amount of a *royalty allowance, available royalty credits are applied in the order in which they arise.

Note: If an available royalty credit cannot be wholly applied in an MRRT year, the unapplied amount can be carried forward: see section 6025.

6020  When a royalty credit arises

 (1) A liability a miner incurs gives rise to a royalty credit for a mining project interest the miner has to the extent that the liability is to pay, in relation to a *taxable resource extracted under the authority of the *production right to which the interest relates:

 (a) a *mining royalty; or

 (b) an amount to another *entity by way of *recoupment of a liability the other entity incurs that, because of a previous application of this section:

 (i) gives rise at any time to a royalty credit for a mining project interest the other entity has that relates to the production right; or

 (ii) would give rise to such a royalty credit, if the other entity had a mining project interest in relation to the production right.

Note: Sections 6030 and 3045 set out consequences for the entity that receives a recoupment of an amount giving rise to a royalty credit.

 (2) The *royalty credit arises at the time the miner incurs the liability, and relates to the *MRRT year in which it arises.

Note: If more than one liability satisfying this section is incurred in an MRRT year, more than one royalty credit arises in that year.

 (3) The *royalty credit ceases to be a royalty credit if it has been fully applied in working out any of the following:

  (a) a *royalty allowance for the mining project interest;

 (b) *transferred royalty allowances for other mining project interests.

6025  Amount of a royalty credit

 (1) To work out the amount of the *royalty credit in the *MRRT year in which the royalty credit arises in relation to a liability of a miner:

 (a) work out how much of the liability gives rise to a royalty credit under section 6020; and

 (b) divide the result by the *MRRT rate.

Note: Paragraph (b) grossesup the royalty payment to an amount that will reduce the ultimate MRRT liability by the amount of the royalty payment.

Example: A miner pays a State royalty of $22.5 million in an MRRT year. The royalty credit in that year is:

 

 (2) In a later *MRRT year, the amount of the *royalty credit is:

  

where:

previous amount of the royalty credit is the amount of the *royalty credit for the preceding *MRRT year.

previous application of the royalty credit is the sum of the amounts of those parts (if any) of the *royalty credit that have been applied in working out, for the preceding *MRRT year, any of the following:

 (a) a *royalty allowance for the mining project interest;

 (b) one or more *transferred royalty allowances for other mining project interests.

uplift factor is:

Example: A royalty credit of $100 million arises in an MRRT year. $30 million is applied to the royalty allowance in the year the credit arises. In the same year, $30 million is applied to a transferred royalty allowance under Division 65. Assume the long term bond rate for that year is 5.5%. In the next year, the amount of the royalty credit is:($100 million ($30 million + $30 million)) x (0.055 + 1.07) = $45 million.

6030  Royalty credits reduced by recoupments

 (1) To the extent an amount that is received or becomes receivable by a miner is by way of *recoupment of a liability that gives rise to a *royalty credit for a mining project interest the miner has:

 (a) the amount is to be increased by dividing it by the *MRRT rate; and

 (b) that increased amount is applied to reduce royalty credits for the interest:

 (i) in the *MRRT year in which the amount is received or becomes receivable (the recoupment year); and

 (ii) in the order in which the royalty credits arise; and

 (iii) before applying the royalty credits in working out a *royalty allowance or a *transferred royalty allowance for the recoupment year.

Note: Paragraph (a) grossesup the recoupment in the same way that section 6025 grossesup the liability giving rise to the royalty credit.

 (2) If the increased amount exceeds the sum of those *royalty credits, section 3045 applies to the excess (the excess royalty recoupment) in the recoupment year.

Part 32Transferred royalty allowances

Division 65Transferred royalty allowances

Guide to Division 65

651  What this Division is about

A miners MRRT liability for a mining project interest may be reduced by mining royalties, paid to the Commonwealth, States and Territories, that relate to one or more other mining project interests.

The interests must satisfy an integration test from the time the royalty is incurred to the time it reduces the MRRT liability.

Table of sections

Operative provisions

655 Object of this Division

6510 When a miner has a transferred royalty allowance

6515 The amount of a transferred royalty allowance

6520 Available royalty credits

Operative provisions

655  Object of this Division

  The object of this Division is to enable *royalty credits arising in relation to a mining project interest to reduce the *MRRT liability of certain other mining project interests, if the interests are *integrated from the time the royalty credits arise to the end of the *MRRT year in which they are to be applied.

6510  When a miner has a transferred royalty allowance

  A miner has a transferred royalty allowance for a mining project interest for an *MRRT year if:

 (a) there is an amount (a remaining profit) by which the miners *mining profit for the interest for the year exceeds the *royalty allowance (if any) that the miner has for the interest for the year; and

 (b) there are one or more *royalty credits (available royalty credits) that, under section 6520, can be applied in working out the transferred royalty allowance for the interest for the year.

6515  The amount of a transferred royalty allowance

 (1) The amount of the miners *transferred royalty allowance is so much of the sum of the available royalty credits as does not exceed the remaining profit.

 (2) In working out the amount of a *transferred royalty allowance, *royalty credits are applied in the order in which they arise, but the miner may choose the order in which to apply royalty credits that arise at the same time.

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

6520  Available royalty credits

 (1) A *royalty credit can be applied in working out a *transferred royalty allowance for a mining project interest for an *MRRT year (the transfer year) if:

 (a) the mining project interest and the mining project interest for which the royalty credit arises are *integrated at all times in the period:

 (i) starting at the time the *royalty credit arises; and

 (ii) ending at the end of the transfer year; and

Note 1: For when a royalty credit arises, see section 6020.

Note 2: For when mining project interests are integrated, see Division 255.

 (b) the royalty credit does not relate to an MRRT year for which there was a choice to use the alternative valuation method under Division 175 in relation to the mining project interest for which the royalty credit arises.

 (2) However, the *royalty credit cannot be applied to the extent it is applied in working out:

 (a) a *royalty allowance; or

 (b) a *transferred royalty allowance;

for another mining project interest for the year.

Part 33Premining loss allowances

Division 70Premining loss allowances

Table of Subdivisions

 Guide to Division 70

70A Object of this Division

70B When a miner has a premining loss allowance

70C Premining losses

70D Amounts of premining losses

Guide to Division 70

701  What this Division is about

Premining loss allowances enable expenditure (such as exploration expenditure) incurred during the period before a mining project interest comes into existence to reduce a miners MRRT liability for a mining project interest for an MRRT year.

Premining losses that are unapplied at the end of the MRRT year in which they arise are uplifted and may be able to be applied in later years.

Note: Premining losses that are not applied to a premining loss allowance may be applied to transferred premining loss allowances for other mining project interests (see Division 95).

Subdivision 70AObject of this Division

Table of sections

705 Objects of this Division

705  Objects of this Division

  The objects of this Division are:

 (a) to recognise a miner’s net expenditure (including exploration expenditure) incurred, before a *production right is granted, in identifying and evaluating whether *taxable resources could be extracted from an area; and

 (b) to provide an uplift for unapplied *premining losses, which compensates for:

 (i) the delay where premining losses are applied in a later year; and

 (ii) the risk that premining losses may not be able to be applied in a later year.

Subdivision 70BWhen a miner has a premining loss allowance

Table of sections

7010 When a miner has a premining loss allowance

7015 The amount of a premining loss allowance

7020 Available premining losses for a premining loss allowance

7025 Meaning of premining project interest etc.

7010  When a miner has a premining loss allowance

  A miner has a premining loss allowance for a mining project interest for an *MRRT year if:

 (a) there is an amount (a remaining profit) by which the miners *mining profit for the interest for the year exceeds the sum of all the *higher ranking allowances (if any) that the miner has for the interest for the year; and

 (b) there are one or more *premining losses (available premining losses) that, under section 7020, can be applied in working out a premining loss allowance for the interest for the year.

7015  The amount of a premining loss allowance

 (1) The amount of the miners *premining loss allowance is so much of the sum of the available premining losses as does not exceed the remaining profit.

Example: A miner has, for a mining project interest for an MRRT year, a mining profit of $400 million, a royalty allowance of $200 million and a transferred royalty allowance of $100 million. The sum of the available premining losses for the interest for the year is $20 million.

 Under section 7010, the miner has a premining loss allowance for the interest for the year because the mining profit exceeds the sum of the higher ranked allowances ($300 million), giving the miner a remaining profit of $100 million.

 Under this section, the amount of the premining loss allowance is the sum of the available premining losses ($20 million), because that sum does not exceed the remaining profit.

 (2) In working out the amount of a *premining loss allowance, *premining losses are applied in the order in which they arise.

Note: If an available premining loss cannot be wholly applied in an MRRT year, the unapplied amount can be carried forward: see section 7050.

7020  Available premining losses for a premining loss allowance

 (1) A *premining loss can be applied in working out a *premining loss allowance for the mining project interest for the year if the mining project interest *originates from the *premining project interest to which the premining loss relates.

Note: Once a premining loss has been fully applied, it ceases to be a premining loss (see subsection 7030(2)), and therefore cannot be applied in working out a premining loss allowance.

 (2) A mining project interest originates from a *premining project interest if:

 (a) the *termination day for the premining project interest happened; or

 (b) the premining project interest ceased to apply to the *project area, or a part of the project area, for the mining project interest;

because the mining project interest started to apply to the project area, or a part of the project area, for the premining project interest.

Note: A mining project interest may originate from more than one premining project interest.

7025  Meaning of premining project interest etc.

 (1) A premining project interest is an interest in an *exploration right.

 (2) However, if the *exploration right relates both to iron ore and to other kinds of *taxable resources, treat the *premining project interest as:

 (a) a premining project interest relating to iron ore; and

 (b) another premining project interest relating to those other kinds of taxable resources.

 (3) An exploration right is an authority or right (however described) under an *Australian law for a purpose (other than an incidental purpose) of *exploration or prospecting for *taxable resources in a particular area in *Australia.

Examples: The following are some examples of an exploration right:

(a) a mineral development licence;

(b) a retention lease;

(c) an exploration permit.

 (4) The project area for a *premining project interest is the area in *Australia covered by the *exploration right to which the premining project interest relates.

Subdivision 70CPremining losses

Table of sections

7030 Premining losses

7035 Meaning of premining expenditure etc.

7040 Meaning of premining revenue

7030  Premining losses

 (1) A premining loss arises for an *MRRT year if:

 (a) during the year, an *entity *holds a *premining project interest; and

 (b) the entitys *premining expenditure for the interest for the year exceeds the entitys *premining revenue for the interest for the year.

 (2) The premining loss ceases to be a premining loss if it has been fully applied in working out any of the following:

 (a) a *premining loss allowance for a mining project interest that *originates from the *premining project interest;

 (b) *transferred premining loss allowances for other mining project interests.

7035  Meaning of premining expenditure etc.

Premining expenditure

 (1) An *entitys premining expenditure, for a *premining project interest for an *MRRT year, is the sum of all amounts that, under this Act, are included in the entitys premining expenditure for the interest for the year.

Note: Most of the amounts are covered by this Division. However, the following amounts may also be included in a miner’s premining expenditure:

(a) amounts arising as a result of adjustments to take account of changes in circumstances (see Division 160);

(b) amounts arising as a result of changed use of starting base assets (see section 16555).

 (2) An amount of expenditure is included in an *entitys *premining expenditure for a *premining project interest for an *MRRT year to the extent that the entity necessarily incurred the amount in that year in carrying on *premining project operations of the interest.

 (3) The expenditure may be of either a capital or revenue nature.

Excluded expenditure

 (4) However, an amount is not included in the *entitys *premining expenditure for the *premining project interest for the *MRRT year to the extent that it:

 (a) is *excluded expenditure; or

 (b) would be excluded expenditure, if:

 (i) the premining project interest were a mining project interest; and

 (ii) the *exploration right to which the premining project interest relates were a *production right to which the mining project interest relates; and

 (iii) in a case where the entity is not a miner—the entity were a miner.

Note: For excluded expenditure, see Subdivision 35B.

Premining project operations

 (5) Operations or activities are the premining project operations of the *premining project interest to the extent that, if the premining project interest were a mining project interest, the operations or activities would be *upstream mining operations in relation to such a mining project interest.

 (6) It does not matter where, or when, the operations or activities are carried on.

Expenditure for deferred farmout arrangement where no interest transferred

 (7) An amount of expenditure is included in an *entity’s *premining expenditure for a *premining project interest for an *MRRT year to the extent that:

 (a) another entity necessarily incurred the amount in that MRRT year, or an earlier MRRT year, in carrying on *exploration or prospecting for *taxable resources in the *project area for the premining project interest; and

 (b) the exploration or prospecting was carried on under an *arrangement with the entity; and

 (c) the terms of the arrangement gave the other entity a right, or a contingent right, to acquire from the entity an interest in the *exploration right to which the premining project interest relates; and

 (d) in that MRRT year, the other entity stops having the right, without acquiring the interest in the exploration right.

No double counting

 (8) If 2 or more provisions of this Act include the same amount in an *entitys *premining expenditure (whether for the same *MRRT year or a different MRRT year), the amount is included only under the provision that is most appropriate.

 (9) If:

 (a) a provision of this Act includes an amount in an *entitys *premining expenditure; and

 (b) the same amount is included, by another provision of this Act, in the entitys *mining expenditure (whether for the same *MRRT year or a different MRRT year);

the amount is included only under the provision that is most appropriate.

7040  Meaning of premining revenue

 (1) An *entitys premining revenue for a *premining project interest that the entity *holds, for an *MRRT year, is the sum of all amounts that, under this Act, are included in the entitys premining revenue for the interest for the year.

Note: Most of the amounts are covered by this section. However, amounts arising as a result of adjustments to take account of changes in circumstances may also be included in an entitys premining revenue (see Division 160).

 (2) An amount is included in the *entitys *premining revenue for the *premining project interest for the year if the amount would have been included in the entitys *mining revenue for a mining project interest that the entity had for the year if:

 (a) to the extent that the amount related to the premining project interest, it had related to the mining project interest; and

 (b) to the extent that the amount related to *premining expenditure for the premining project interest, it had related to *mining expenditure for the mining project interest.

 (3) An amount that, under this section, is to be included in the *entitys premining revenue does not include:

 (a) any *GST payable on a *supply for which the amount is the consideration, or part of the consideration; or

 (b) any *increasing adjustments that relate to such a supply.

Subdivision 70DAmounts of premining losses

Table of sections

7045 Premining losses for the MRRT years in which they arise

7050 Premining losses for later MRRT years

7045  Premining losses for the MRRT years in which they arise

  In the *MRRT year in which a *premining loss arises, the amount of the premining loss is the difference between:

 (a) the *entitys *premining expenditure, for the *premining project interest to which the premining loss relates, for the year; and

 (b) the entitys *premining revenue for that premining project interest for the year.

7050  Premining losses for later MRRT years

  In a later *MRRT year, the amount of the *premining loss is:

  

where:

previous amount of the loss is the amount of the *premining loss for the preceding *MRRT year.

previous application of the loss is the sum of the amounts of those parts (if any) of the *premining loss that have been applied in working out, for the preceding *MRRT year, any of the following:

 (a) a *premining loss allowance for a mining project interest that the *entity has;

 (b) one or more *transferred premining loss allowances for other mining project interests.

uplift factor is one of the following:

 (a) if the later year is one of the 10 *MRRT years after the MRRT year in which the *premining loss arose:

  

 (b) if the later year is not one of the 10 MRRT years after the MRRT year in which the premining loss arose:

  

Part 34Mining loss allowances

Division 75Mining loss allowances

Guide to Division 75

751  What this Division is about

Mining loss allowances enable mining losses to reduce the miners MRRT liability for the same mining project interest for a later MRRT year.

Mining losses that are not applied in an MRRT year are uplifted and may be able to be applied in later years.

Note: Mining losses that are not applied to a mining loss allowance may be applied to transferred mining loss allowances for other mining project interests (see Division 100).

Table of sections

Operative provisions

755 Objects of this Division

7510 When a miner has a mining loss allowance

7515 The amount of a mining loss allowance

7520 Mining losses

Operative provisions

755  Objects of this Division

  The objects of this Division are:

 (a) to allow *mining losses of a mining project interest to be applied in later years; and

 (b) to provide an uplift for unapplied mining losses which compensates for:

 (i) the delay where mining losses are applied in a later year; and

 (ii) the risk that mining losses may not be able to be applied in a later year.

7510  When a miner has a mining loss allowance

  A miner has a mining loss allowance for a mining project interest for an *MRRT year if:

 (a) there is an amount (a remaining profit) by which the miners *mining profit for the interest for the year exceeds the sum of all the *higher ranking allowances (if any) that the miner has for the interest for the year; and

 (b) there are one or more *mining losses (available mining losses) that relate to the interest.

7515  The amount of a mining loss allowance

 (1) The amount of the miners *mining loss allowance is so much of the sum of the available mining losses as does not exceed the remaining profit.

 (2) In working out the amount of a *mining loss allowance, *mining losses are applied in the order in which they arise.

7520  Mining losses

 (1) A mining loss arises for a mining project interest for an *MRRT year if the *mining expenditure for the interest for the year exceeds the *mining revenue for the interest for the year.

 (2) In that year, the amount of the *mining loss is the amount of the excess.

 (3) In a later *MRRT year, the amount of the *mining loss is:

  

where:

previous amount of the loss is the amount of the *mining loss for the preceding *MRRT year.

previous application of the loss is the sum of the parts (if any) of the *mining loss that have been applied in working out, for the preceding *MRRT year, any of the following:

 (a) a *mining loss allowance for the mining project interest;

 (b) one or more *transferred mining loss allowances for other mining project interests.

uplift factor is:

 (4) The *mining loss ceases to be a mining loss if it has been fully applied in working out any of the following:

 (a) a *mining loss allowance for the mining project interest;

 (b) *transferred mining loss allowances for other mining project interests.

Part 35Starting base allowances

Division 80Starting base allowances

Table of Subdivisions

 Guide to Division 80

80A Objects of this Division

80B When a miner has a starting base allowance

80C Starting base assets

80D Amounts of starting base losses

Guide to Division 80

801  What this Division is about

Starting base allowances enable the following to be taken into account in a miners MRRT liability for a mining project interest for an MRRT year:

 (a) investments in assets in relation to upstream mining operations before 2 May 2010;

 (b) certain expenditure on such assets (not including expenditure to acquire rights to resources) made by a miner between 2 May 2010 and 1 July 2012.

A starting base allowance consists of a miners available starting base losses. Starting base losses reflect the declines in value of starting base assets.

Starting base losses that are not applied are increased by one of 2 uplift factors. Which uplift factor to use is governed by whether a book value approach or a market value approach is applied to valuing starting base assets.

Note 1: A starting base allowance can arise in relation to a premining project interest from which a mining project interest originates.

Note 2: Division 85 deals with the valuation approaches. Division 90 deals with declines in value of starting base assets.

Note 3: Division 165 deals with starting base adjustments, which apply if starting base assets cease to be part of a miner’s starting base. Division 180 allows for valuation of starting base assets using a lookback approach.

Subdivision 80AObjects of this Division

Table of sections

805 Objects of this Division

805  Objects of this Division

  The objects of this Division are:

 (a) to:

 (i) recognise the value of mining project interests, and other assets used in *upstream mining operations, that miners had when resource tax reforms were announced on 2 May 2010; and

 (ii) ensure that considerations relating to MRRT do not deter miners from making further investments in assets used in upstream mining operations in the period after that announcement and before 1 July 2012;

  by reducing miners’ *MRRT liabilities based on declines in value of those interests and assets after 1 July 2012; and

 (b) to provide an uplift for unapplied *starting base losses which compensates for:

 (i) the delay where starting base losses are applied in a later year; and

 (ii) under a book value approach to valuation, the risk that starting base losses may not be able to be applied in a later year.

Subdivision 80BWhen a miner has a starting base allowance

Table of sections

8010 When a miner has a starting base allowance

8015 The amount of a starting base allowance

8020 When a miner has a starting base loss

8010  When a miner has a starting base allowance

  A miner has a starting base allowance for a mining project interest for an *MRRT year if:

 (a) there is an amount (a remaining profit) by which the miners *mining profit for the interest for the year exceeds the sum of all the *higher ranking allowances (if any) that the miner has for the interest for the year; and

 (b) there are one or more *starting base losses (available starting base losses) that relate to the interest.

8015  The amount of a starting base allowance

 (1) The amount of the miners *starting base allowance is so much of the sum of the miners available starting base losses as does not exceed the remaining profit.

 (2) In working out the amount of a *starting base allowance, *starting base losses are applied in the order in which they arise.

Note 1: If an available starting base loss cannot be wholly applied in an MRRT year, the unapplied amount can be carried forward: see section 8045.

Note 2: Starting base losses can be affected by starting base adjustments under Division 165.

8020  When a miner has a starting base loss

 (1) A starting base loss arises for a mining project interest for an *MRRT year if at the same time during the year, the same miner:

 (a) has the mining project interest; and

 (b) *holds a *starting base asset relating to the mining project interest.

 (2) The *starting base loss ceases to be a starting base loss if it has been fully applied in working out one or more *starting base allowances for the mining project interest.

Subdivision 80CStarting base assets

Table of sections

8025 Meaning of starting base asset

8030 Treating starting base assets as a single starting base asset

8035 Mine development expenditure may be a starting base asset

8025  Meaning of starting base asset

 (1) Property, or a legal or equitable right that is not property, is a starting base asset relating to a mining project interest if at the time mentioned in subsection (2), the property or right was:

 (a) being used; or

 (b) *installed ready for use; or

 (c) being constructed for use;

in carrying on *upstream mining operations relating to the mining project interest.

Note: Division 165 provides for a starting base adjustment if a starting base asset ceases to be used, or installed ready for use, in a project, or construction of the asset stops.

 (2) The time (start time) is the later of:

 (a) the start of 1 July 2012; and

 (b) the start of the day on which production (other than incidental production) of *taxable resources commences from the *project area for the mining project interest.

 (3) However:

 (a) if, under Division 85, the book value approach is the valuation approach for the mining project interest, the following are not starting base assets:

 (i) rights and interests constituting the mining project interest;

 (ii) *mining, quarrying or prospecting information, or rights to such information;

 (iii) goodwill; and

 (b) property, or a legal or equitable right, is not, and is taken never to have been, a starting base asset if:

 (i) a valid choice has not been made under section 855 specifying the valuation approach for the mining project interest; or

 (ii) a starting base assessment (within the meaning of subitem 15(3) of Schedule 4 to the Minerals Resource Rent Tax (Consequential Amendments and Transitional Provisions) Act 2012) does not cover the property or right; or

 (iii) immediately before 1 July 2012, the property or right was not *held by the *entity that, at that time, had the mining project interest (or held the *premining project interest from which the mining project interest *originated); or

 (iv) the property or right did not exist before 1 July 2012.

 (3A) For the purposes of subparagraphs (3)(b)(iii) and (iv), if:

 (a) the asset is, or includes, the rights and interests that constitute the mining project interest; and

 (b) the mining project interest did not exist immediately before 1 July 2012; and

 (c) the mining project interest *originates from one or more *premining project interests, or one or more parts of premining project interests, that existed immediately before 1 July 2012;

assume that the mining project interest is a continuation of the premining project interest.

 (4) If, under Division 85, the market value approach is the valuation approach for the mining project interest:

 (a) treat any *mining, quarrying or prospecting information, or any rights to such information, as property, or a legal or equitable right, for the purposes of subsection (1); and

 (b) treat any improvement to land in the *project area for the mining project interest as satisfying the requirements of that subsection at the time mentioned in subsection (2) if:

 (i) the improvement was consumed or destroyed in carrying on *upstream mining operations relating to the mining project interest; and

 (ii) the consumption or destruction happened after 1 May 2010 but before that time.

 (5) Subject to section 8030, this Part applies to any improvement to, or any fixture on, land as if it were an asset separate from the land, whether the improvement or fixture is removable or not.

8030  Treating starting base assets as a single starting base asset

 (1) If, under Division 85, the market value approach is the valuation approach for a mining project interest, treat as a single *starting base asset any 2 or more of the following that would (apart from this subsection) be starting base assets relating to the mining project interest:

 (a) rights and interests that constitute the mining project interest;

 (b) any *mining, quarrying or prospecting information, or rights to such information, relating to those rights and interests;

 (c) goodwill relating to those rights and interests;

 (d) any improvement to land (but not a fixture) in the *project area for the mining project interest.

 (2) However, if:

 (a) the mining project interest is, because of section 11510, a combined interest; and

 (b) a constituent interest (as mentioned in that section) of the combined interest forms part of the combined interest only because a valid choice has been made under section 25520 (downstream integration);

section 8025 and subsection (1) of this section apply to the constituent interest as if it were a separate mining project interest, and applies to the combined interest as if it did not include the constituent interest.

8035  Mine development expenditure may be a starting base asset

 (1) *Mine development expenditure is taken to be a starting base asset relating to a mining project interest if it:

 (a) was incurred during the period between 2 May 2010 and 30 June 2012; and

 (b) was incurred by a miner:

 (i) in relation to that mining project interest; or

 (ii) in relation to a *premining project interest from which that mining project interest *originated; and

 (c) is not *interim expenditure relating to property or a right that is a starting base asset because of section 8025.

 (2) While a miner *holds the *starting base asset, it is taken, for the purposes of subsections 8040(3) and (4), to be used for the purpose of carrying on *upstream mining operations for the mining project interest.

Note: For when a miner holds a starting base asset that is mine development expenditure, see subsection 25010(2).

 (3) Mine development expenditure is expenditure that:

 (a) is incurred in carrying on *upstream mining operations relating to a mining project interest or *premining project operations relating to a *premining project interest; and

 (b) relates to developing the *project area for the interest for the purposes of extracting *taxable resources from the area, including expenditure incurred in:

 (i) removing overburden from the area or a part of the area; and

 (ii) excavating a pit in the area; and

 (iii) sinking a mineshaft in the area.

Note: This section allows mine development expenditure to be taken into account in a miners starting base even though it is not related to another starting base asset.

 In working out its decline in value under Division 90, the expenditure is added to the base value of the asset as interim expenditure.

Subdivision 80DAmounts of starting base losses

Table of sections

8040 Starting base losses for the MRRT years in which they arise

8045 Starting base losses for later MRRT years

8050 Mining project interests originating from premining project interests with different valuation approaches

8040  Starting base losses for the MRRT years in which they arise

 (1) In the *MRRT year for which a *starting base loss arises, the amount of the starting base loss is the sum of the declines in value, for the year, of all the *starting base assets that:

 (a) relate to the mining project interest for which the starting base loss arises; and

 (b) were *held, for any time during the year, by a miner that had the mining project interest during the year.

 (2) However, the amount is reduced by the sum of all the reductions (if any) required by subsections (3) and (4) in relation to any of those *starting base assets for the year.

Use etc. that is not related to upstream mining operations

 (3) Reduce the amount under subsection (1) relating to a *starting base asset, to the extent (if any) that, during the *starting base days, the asset was:

 (a) used; or

 (b) *installed ready for use; or

 (c) being constructed for use;

for a purpose other than carrying on *upstream mining operations relating to the mining project interest.

Use etc. that is not related to mining expenditure

 (4) Reduce the amount under subsection (1) relating to a *starting base asset (or, if that amount is reduced under subsection (3), that amount as so reduced) to the extent (if any) that:

 (a) during the *starting base days, the asset was:

 (i) used; or

 (ii) *installed ready for use; or

 (iii) being constructed for use;

  for carrying on *upstream mining operations relating to the mining project interest; but

 (b) that amount would have been *excluded expenditure if it had been an amount of expenditure that the miner incurred.

 (5) However, subsection (4) does not apply if:

 (a) under Division 85, the market value approach is the valuation approach for the mining project interest; and

 (b) the amount would have been *excluded expenditure only because of section 3535 (cost of acquiring rights and interests in projects).

Note: Subsection (5) ensures that a decline in value of a mining project interest or an interest in the mining project interest is not reduced under the market value approach, even though expenditure incurred in acquiring the interest is excluded expenditure under Division 35.

Starting base days

 (6) The starting base days in relation to a *starting base asset are the days, during the *MRRT year but on or after the *start time for the asset:

 (a) on which a miner both *held the asset and had the mining project interest; and

 (b) on which the asset was, for any purpose:

 (i) used; or

 (ii) *installed ready for use; or

 (iii) being constructed for use.

 (7) However:

 (a) if a *starting base adjustment event for the asset happens during the *MRRT year—any days in the MRRT year after that event are not starting base days relating to the asset; and

 (b) any days after the *termination day for the mining project interest are not starting base days relating to the asset.

8045  Starting base losses for later MRRT years

 (1) In a later *MRRT year, the amount of the *starting base loss is:

  

where:

previous application of the amount is the sum of the parts (if any) of the *starting base loss that have been applied in working out, for the preceding *MRRT year, a *starting base allowance for the mining project interest.

previous starting base loss is the *starting base loss for the preceding *MRRT year.

uplift factor is one of the following:

 (a) if, under Division 85, the book value approach is the valuation approach for the mining project interest:

  

 (b) if, under Division 85, the market value approach is the valuation approach for the mining project interest:

  

  where:

  relevant financial year is:

 (i) if the *MRRT year is a *financial year—the MRRT year; or

 (ii) if the MRRT year is not a financial year—the financial year corresponding to the MRRT year.

 (2) The amount worked out under paragraph (b) of the definition of uplift factor in subsection (1) is to be worked out to 3 decimal places (rounding up if the fourth decimal place is 5 or more).

8050  Mining project interests originating from premining project interests with different valuation approaches

 (1) If a mining project interest *originates from 2 or more *premining project interests, and those that have a valuation approach under Division 85 do not all have the same valuation approach:

 (a) in the circumstances mentioned in subsection (2), there are 2 *starting base losses, for the mining project interest for the same *MRRT year, of the amounts provided in subsection (3); and

 (b) in working out the amount of a *starting base allowance for the mining project interest for an MRRT year, the starting base losses for the mining project interest for the year are to be applied in the order specified in subsection (4); and

 (c) in working out under Division 90 the decline in value of any *starting base asset during an MRRT year, assume that the applicable valuation approach is the valuation approach specified under subsection (5).

 (2) There are 2 *starting base losses, for the mining project interest for the same *MRRT year, if, for the year:

 (a) there would have been a starting base loss (the book value starting base loss) for the mining project interest for that MRRT year if it had *originated only from the *premining project interests for which the book value approach is the valuation approach under Division 85; and

 (b) there would have been another starting base loss (the market value starting base loss) for the mining project interest for that MRRT year if it had originated only from the premining project interests for which the market value approach is the valuation approach under Division 85.

 (3) The amounts of those 2 *starting base losses are the book value starting base loss and the market value starting base loss.

 (4) Despite subsection 8015(2), the order for applying the *starting base losses for the mining project interest for the year is:

 (a) the book value starting base loss; then

 (b) the market value starting base loss.

 (5) The valuation approach is:

 (a) the book value approach if the asset relates to a *premining project interest for which the book value approach is the valuation approach under Division 85; or

 (b) the market value approach if the asset relates to a premining project interest for which the market value approach is the valuation approach under Division 85.

Division 85Valuation approaches

Guide to Division 85

851  What this Division is about

The 2 valuation approaches are the book value approach and the market value approach.

An entity can choose which valuation approach to apply to all of its starting base assets relating to a mining project interest (or a premining project interest).

Note: In some limited cases in which the market value approach would otherwise apply, a lookback approach to valuation can be chosen: see Division 180.

Table of sections

Operative provisions

855 Choosing a valuation approach

8510 Restriction on specifying the book value approach

8515 The valuation approach for a mining project interest

Operative provisions

855  Choosing a valuation approach

 (1) An *entity may choose which valuation approach to apply to all *starting base assets (and all property or rights that are expected to be starting base assets after the time mentioned in subsection 8025(2)) that the entity *holds that relate to:

 (a) a mining project interest that the entity has; or

 (b) a *premining project interest that the entity holds.

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

 (2) The choice must specify whether the *entity has chosen:

 (a) the book value approach; or

 (b) the market value approach.

 (3) The choice is not valid unless notice of the choice is given in the *starting base return relating to the mining project interest or *premining project interest.

 (4) The choice may specify that it applies to every mining project interest or *premining project interest that the *entity has that relates to a specified area.

 (5) The choice applies, in relation to the mining project interest or *premining project interest, to the first *MRRT year and all later MRRT years.

8510  Restriction on specifying the book value approach

 (1) The choice cannot specify the book value approach unless:

 (a) during the 18 months preceding 2 May 2010, an *entity that had the mining project interest, or *held the *premining project interest, in that period prepared a financial report relating to the interest in accordance with *accounting standards; and

 (b) the report relates to a financial period that ended in the 18 months preceding 2 May 2010; and

 (c) the report has been audited in accordance with *auditing standards.

 (2) If, during the 18 months preceding 2 May 2010, the *entity was a part of a consolidated entity (within the meaning of the Corporations Act 2001), for the purposes of paragraph (1)(a), treat any financial report for the consolidated entity, relating to the mining project interest, as a report that the entity prepared.

8515  The valuation approach for a mining project interest

  The valuation approach, for a mining project interest that an *entity has, is the approach specified in the choice under section 855 relating to:

 (a) the mining project interest; or

 (b) a *premining project interest from which the mining project interest *originates.

Note 1: For mining project interests that originate from premining project interests that have different valuation approaches, see section 8050.

Note 2: For combined mining project interests in which constituent interests have different valuation approaches, see section 11550.

Division 90Declines in value of starting base assets

Table of Subdivisions

 Guide to Division 90

90A How to work out the decline in value of a starting base asset

90B Base values under the book value approach

90C Base values under the market value approach

90D Miscellaneous

Guide to Division 90

901  What this Division is about

The decline in value of a starting base asset during an MRRT year counts towards the miners starting base loss for a mining project interest for the year.

Under the book value approach, the base value of a starting base asset includes its value in the most recent financial report before 2 May 2010. Under the market value approach, the base value includes its market value as at 1 May 2010. Under either approach, the base value may also include expenditure incurred before 1 July 2012.

Under the book value approach, an uplift factor, based on the long term bond rate plus 7%, is applied to components of the assets base value. Under the market value approach, an uplift factor is not applied.

Subdivision 90AHow to work out the decline in value of a starting base asset

Table of sections

905 How to work out the decline in value of a starting base asset

9010 Write off rates under the book value approach

9015 Write off rates under the market value approach

905  How to work out the decline in value of a starting base asset

 (1) The decline in value of a *starting base asset, relating to a mining project interest, during an *MRRT year is as follows:

  

where:

base value is the base value of the asset for that year worked out under whichever of the following is applicable:

 (a) Subdivision 90B (book value approach);

 (b) Subdivision 90C (market value approach);

 (c) section 16560 (use etc. of starting base assets after starting base adjustment events).

However, the base value may be reduced under section 9060 (partial disposal) or section 9065 (recoupment).

number of starting base days is the number of *starting base days, in relation to the *starting base asset, during the *MRRT year.

write off rate is the write off rate under section 9010 or 9015 (whichever is applicable) for the asset for the year.

 (2) The decline in value during an *MRRT year cannot be more than the assets *base value for that year.

9010  Write off rates under the book value approach

  If, under Division 85, the book value approach is the valuation approach for the mining project interest, the write off rate of the *starting base asset for an *MRRT year is:

 

Write off rates under the book value approach

Item

For this *MRRT year

The write off rate is:

1

the *MRRT year in which the *start time for the asset happens

36%

2

the first *MRRT year commencing after the *start time

37.5%

3

the second *MRRT year commencing after the *start time

37.5%

4

the third *MRRT year commencing after the *start time

60%

5

the fourth *MRRT year commencing after the *start time

100%

9015  Write off rates under the market value approach

 (1) If, under Division 85, the market value approach is the valuation approach for the mining project interest, the write off rate of the *starting base asset for each *MRRT year is as follows:

  

where:

remaining effective life is:

 (a) if the asset is a *depreciating asset—the shortest of the following:

 (i) the unelapsed part, as at the start of the *MRRT year, of what was the assets *effective life worked out as at its *start time;

 (ii) the unelapsed part, as at the start of the MRRT year, of the longest effective life, worked out as at its start time, of any right or interest that is *held by the miner holding the *starting base asset and that constitutes the whole or part of the mining project interest;

 (iii) the number of years specified in subsection (2); or

 (b) if the asset is not a depreciating asset—the shorter of the following:

 (i) the unelapsed part, as at the start of the MRRT year, of the longest effective life, worked out as at its start time, of any right or interest that is held by the miner holding the starting base asset and that constitutes the whole or part of the mining project interest;

 (ii) the number of years specified in subsection (2).

 (2) The number of years is the number of years (including parts of years) between:

 (a) the start of the *MRRT year; and

 (b) 1 July 2037.

However, if the MRRT year starts after 30 June 2036, the number of years is one.

 (3) If the asset is an asset that is treated as a single *starting base asset because of section 8030, for the purposes of the definition of remaining effective life in subsection (1):

 (a) treat the asset as a *depreciating asset, unless none of the *constituent assets of the single starting base asset are depreciating assets; and

 (b) treat the single starting base assets *effective life, at its *start time, as the longest effective life, worked out as at that time, of any of the constituent assets that are depreciating assets.

 (4) For the purpose of working out the *effective life of a *starting base asset as at its *start time:

 (a) the miner may make the choices for the purposes of this section; and

 (b) the Commissioner may make the decisions for the purposes of this section;

that the miner or Commissioner could have made under Division 40 of the Income Tax Assessment Act 1997, relating to working out the effective life of the asset under that Division.

Subdivision 90BBase values under the book value approach

Table of sections

9020 Application of this Subdivision

9025 Initial base value

9030 Later base values

9020  Application of this Subdivision

  This Subdivision applies to a *starting base asset relating to a mining project interest if, under Division 85, the book value approach is the valuation approach for mining project interest.

Note: A base value for an MRRT year during which the asset rejoins the starting base after a starting base adjustment event happened is worked out under section 16560.

9025  Initial base value

Working out the initial base value of a starting base asset

 (1) The base value of the *starting base asset, for the *MRRT year in which the *start time for the asset happens, is:

 (a) if at all times between 2 May 2010 and 30 June 2012 the *entity that *held it also had the mining project interest (or held the *premining project interest from which the mining project interest *originated), and subsection (2) applies to the mining project interest—the sum of:

 (i) the initial book value of the asset under subsection (3) or (4) (whichever is applicable); and

 (ii) the sum of the valuation amounts under subsection (6) for amounts of *interim expenditure incurred in relation to the asset (other than amounts of interim expenditure incurred in relation to acquiring or bringing into existence another starting base asset); or

 (b) if paragraph (a) does not apply—the sum of the valuation amounts under subsection (6) for amounts of interim expenditure in relation to the asset.

Note: Initial base values are separately assessed under Division 155 in Schedule 1 to the Taxation Administration Act 1953. Those assessed values are used in working out starting base allowances in all assessments of MRRT liabilities: see item 15 of Schedule 4 to the Minerals Resource Rent Tax (Consequential Amendments and Transitional Provisions) Act 2012.

 (2) This subsection applies to a mining project interest if:

 (a) the mining project interest existed (or is a part of a mining project interest that existed) just before 2 May 2010; or

 (b) the mining project interest *originates from a *premining project interest that existed (or that is a part of a premining project interest that existed) just before 2 May 2010.

Initial book value of a starting base asset

 (3) If:

 (a) the value of the asset is recorded in the accounts from which the most recent audited financial report before 2 May 2010 was prepared; and

 (b) the financial report relates to a financial period that ended in the 18 months preceding that day;

the initial book value of the asset is as follows:

where:

accepted value is:

 (a) the value recorded in those accounts, unless paragraph (b) applies; or

 (b) if that value is inconsistent with an auditors report on the financial report—a value that is consistent with the auditors report.

long term bond rate for the initial valuation period is the *long term bond rate for the initial valuation period under subsection (5).

n is the number of days in the initial valuation period, divided by 365.

 (4) Despite subsection (3), the initial book value of the asset is zero if the value of the asset is not recorded as mentioned in subsection (3).

Note: If the asset is mine development expenditure, it will not have an initial book value.

Initial valuation period for a starting base asset

 (5) The initial valuation period for the asset is the period:

 (a) starting:

 (i) on the date of the most recent audited financial report, prepared before 2 May 2010, from the accounts in which the value of the asset is recorded, unless subparagraph (ii) of this paragraph applies; or

 (ii) if the value of the asset recorded in those accounts is inconsistent with an auditor’s report on the financial report—on the date of the auditor’s report; and

 (b) ending at the end of the *MRRT year in which the *start time for the asset happens.

Valuation amounts for interim expenditure

 (6) If the *entity that *held the asset incurred an amount of *interim expenditure relating to the asset, the valuation amount for the amount of interim expenditure in relation to the asset is:

  

where:

long term bond rate for the interim valuation period is the *long term bond rate for the interim valuation period under subsection (7).

n is the number of days in the interim valuation period, divided by 365.

Interim valuation period for interim expenditure

 (7) The interim valuation period for an amount of *interim expenditure is the period:

 (a) starting on the day on which the *entity incurred the amount; and

 (b) ending at the end of the *MRRT year in which the *start time for the asset happens.

9030  Later base values

  The base value of the *starting base asset, for an *MRRT year that is after the MRRT year in which the *start time for the asset happens, is:

  

where:

preceding base value is the base value of the asset for the preceding *MRRT year.

preceding decline in value is the decline in value of the asset, worked out under section 905, for the preceding *MRRT year.

uplift factor is:

Subdivision 90CBase values under the market value approach

Table of sections

9035 Application of this Subdivision

9040 Initial base value

9045 Mining project interest originating from premining project interests etc.

9050 Later base values

9035  Application of this Subdivision

  This Subdivision applies to a *starting base asset relating to a mining project interest if, under Division 85, the market value approach is the valuation approach for the mining project interest.

Note: A base value for an MRRT year during which the asset rejoins the starting base after a starting base adjustment event happened is worked out under section 16560.

9040  Initial base value

 (1) The base value of the *starting base asset, for the *MRRT year in which the *start time for the asset happens, is:

 (a) if at all times between 2 May 2010 and 30 June 2012 the *entity that *held it also had the mining project interest (or held the *premining project interest from which the mining project interest *originated), and subsection (2) applies to the mining project interest—the sum of:

 (i) the *market value of the asset on 1 May 2010; and

 (ii) the sum of the amounts of *interim expenditure incurred in relation to the asset (other than amounts of interim expenditure incurred in relation to acquiring or bringing into existence another starting base asset); or

 (b) if paragraph (a) does not apply—the sum of the amounts of interim expenditure incurred in relation to the asset.

Note 1: Division 180 allows a lookback approach to valuation to be chosen in some cases.

Note 2: If the asset is mine development expenditure, its market value on 1 May 2010 will be zero.

Note 3: Initial base values are separately assessed under Division 155 in Schedule 1 to the Taxation Administration Act 1953. Those assessed values are used in working out starting base allowances in all assessments of MRRT liabilities: see item 15 of Schedule 4 to the Minerals Resource Rent Tax (Consequential Amendments and Transitional Provisions) Act 2012.

 (2) This subsection applies to a mining project interest if:

 (a) the mining project interest existed (or is a part of a mining project interest that existed) just before 2 May 2010; or

 (b) the mining project interest *originates from a *premining project interest that existed, or that is a part of a premining project interest that existed, just before 2 May 2010.

 (3) In working out the *market value of an asset that is treated as a single *starting base asset because of section 8030, disregard any liability of the *entity to pay any *private mining royalty to the extent that:

 (a) the royalty relates to *taxable resources extracted from the *project area for the mining project interest, or for a *premining project interest from which the mining project interest *originates; and

 (b) subsection 3540(3) does not apply to the royalty.

Note: Subsection 3540(3) provides that private mining royalties paid under a pre2 May 2010 arrangement are not covered by the rule that private mining royalties are excluded expenditure.

9045  Mining project interest originating from premining project interests etc.

 (1) For the purpose of working out under section 9040 the *base value of a *starting base asset, relating to a mining project interest, for the *MRRT year in which the *start time for the asset happens, if:

 (a) the asset is, or includes, the rights and interests that constitute the mining project interest; and

 (b) the mining project interest did not exist on 1 May 2010; and

 (c) the mining project interest *originates from one or more *premining project interests, or one or more parts of premining project interests, that existed just before 2 May 2010;

assume that the mining project interest is a continuation of the premining project interest.

 (1A) Without limiting subsection (1), assume also that the *market value of the asset on 1 May 2010 was an amount equal to the market value, on that day, of the rights and interests that constitute the *premining project interest or premining project interests, or the part or parts, from which the mining project interest *originates.

 (2) However, subsection (1A) does not apply if the *entity has made a choice under section 1805 (lookback approach) relating to the mining project interest.

9050  Later base values

  The base value of the *starting base asset, for an *MRRT year that is not the MRRT year in which the *start time for the asset happens, is an amount equal to the difference between:

 (a) the base value of the asset for the preceding MRRT year; and

 (b) the decline in value of the asset, worked out under section 905, for the preceding MRRT year.

Subdivision 90DMiscellaneous

Table of sections

9055 Meaning of interim expenditure

9060 Partial disposal of a starting base asset before the start time

9065 Recoupment of the value of a starting base asset

9055  Meaning of interim expenditure

General interim expenditure

 (1) An amount that an *entity incurs in relation to a *starting base asset that the entity *holds in relation to a mining project interest (including in relation to acquiring or bringing into existence such an asset) is interim expenditure relating to the asset if:

 (a) the amount:

 (i) if the starting base asset is a *depreciating asset—is included in the cost of the asset under Subdivision 40C of the Income Tax Assessment Act 1997; or

 (ii) if the starting base asset is a *CGT asset (but not a depreciating asset)—is included in the *cost base of the asset; and

 (b) the entity incurs the amount during the period starting on the day provided under subsection (4) or (5) and ending at the end of 30 June 2012.

 (2) However, if the *starting base asset is a *CGT asset (but not a *depreciating asset), treat the amount of the *interim expenditure as not including any part of the amount that consists of the third element of the *cost base under subsection 11025(4) of the Income Tax Assessment Act 1997.

 (3) Subsections (1) and (2) apply to a *starting base asset that is treated as a single *starting base asset because of section 8030 or subsection 18010(3) to the extent that they would apply to the *constituent assets of the single starting base asset if the constituent assets were starting base assets.

Start of the expenditure period

 (4) If, under Division 85, the book value approach is the valuation approach for the mining project interest, the period starts:

 (a) if the *entity *held the asset at all times from the start of 2 May 2010 until the end of 30 June 2012—on the date of the financial report mentioned in paragraph 9025(3)(a) in relation to the accounts in which the value of the asset is recorded; or

 (b) otherwise—on the first day, before the end of 30 June 2012, from which the entity held the asset at all times until the end of 30 June 2012.

Example: A miner bought an asset on 1 January 2011 and sold it on 1 May 2011. The miner bought the asset again on 1 June 2011 and still held it at the end of 30 June 2012.

 The expenditure incurred in buying the asset the first time (on 1 January 2011) is not interim expenditure, because the miner did not hold the asset until the end of 30 June 2012, as required by paragraph (4)(b).

 The expenditure incurred in buying the asset the second time (on 1 June 2011) is interim expenditure (if it is covered by paragraph (1)(a)), because the miner held the asset until the end of 30 June 2012.

 (5) If, under Division 85, the market value approach is the valuation approach for the mining project interest, the period starts:

 (a) if the *entity *held the asset at all times from the start of 2 May 2010 until the end of 30 June 2012—on 2 May 2010; or

 (b) otherwise—on the first day, before the end of 30 June 2012, from which the entity held the asset at all times until the end of 30 June 2012.

 (5A) For the purposes of subsections (4) and (5), if:

 (a) the asset is, or includes, the rights and interests that constitute the mining project interest; and

 (b) the mining project interest did not exist on 1 May 2010; and

 (c) the mining project interest *originates from one or more *premining project interests, or one or more parts of premining project interests, that existed just before 2 May 2010;

assume that the mining project interest is a continuation of the premining project interest.

Mine development expenditure as interim expenditure

 (6) An amount that an *entity incurs in relation to a mining project interest is interim expenditure if the amount is *mine development expenditure to which subsection (1) does not apply.

 (7) To avoid doubt, *mine development expenditure that is *interim expenditure cannot also be interim expenditure relating to another amount of mine development expenditure.

Excluded expenditure

 (8) Despite subsections (1) and (6), the amount is not interim expenditure to the extent (if any) that the amount would have been *excluded expenditure if it had been incurred after 1 July 2012.

9060  Partial disposal of a starting base asset before the start time

 (1) The base value of a *starting base asset, relating to a mining project interest that a miner has, for the *MRRT year in which the *start time for the asset happens, is reduced to the extent (if any) that any of the miners interest in the asset is disposed of during the period:

 (a) starting on the day provided under subsection (2); and

 (b) ending just before the start time for the asset.

 (2) The period starts:

 (a) if, under Division 85, the book value approach is the valuation approach for the mining project interest—on the date of the financial report mentioned in paragraph 9025(3)(a) in relation to the accounts in which the value of the asset is recorded; or

 (b) if, under Division 85, the market value approach is the valuation approach for the mining project interest—on 2 May 2010.

 (3) Treat, for the purposes of this section, as a disposal of part of the miners interest in the *starting base asset an *arrangement that has the effect of transferring to another *entity part of the benefits or entitlements that the miner has in relation to the asset.

9065  Recoupment of the value of a starting base asset

Reducing the base value

 (1) The base value of the *starting base asset for an *MRRT year is reduced to the extent (if any) that:

 (a) an amount is received, or becomes receivable, by the miner that has the mining project interest to which the asset relates:

 (i) if the year is the MRRT year in which the *start time for the asset happens—during the period starting on the day provided under subsection (2) and ending just before the end of that year; or

 (ii) in any other case—during the year; and

 (b) payment of the amount has, or would have, the purpose or effect of *recouping or offsetting some or all of what would (apart from this subsection) be the asset’s base value; and

 (c) the amount does not relate to a *starting base adjustment event for the asset; and

 (d) the amount is not taken into account through a reduction under section 9060.

 (2) The period starts:

 (a) if, under Division 85, the book value approach is the valuation approach for the mining project interest—on the date of the financial report mentioned in paragraph 9025(3)(a) in relation to the accounts in which the value of the asset is recorded; or

 (b) if, under Division 85, the market value approach is the valuation approach for the mining project interest—on 2 May 2010.

 (3) However, subsection (1) does not apply to the extent that:

 (a) the *starting base asset is or includes the rights and interests that constitute a mining project interest; and

 (b) the amount mentioned in paragraph (1)(a) relates to disposal of any of those rights and interests.

Including amounts in mining revenue

 (4) If what would otherwise be the amount of the reduction under subsection (1) exceeds what would (apart from that subsection) be the *base value of the *starting base asset, the amount of the excess is included in the miner’s *mining revenue for the *MRRT year.

 (5) However, if one or more of the following applies:

 (a) there have been reductions to a *starting base loss relating to the *starting base asset, for that *MRRT year or an earlier MRRT year, under subsection 8040(3) or (4);

 (b) there have been reductions to a starting base loss relating to the asset, for that MRRT year or an earlier MRRT year, under paragraph 11515(2)(b);

 (c) there has been no starting base loss for that MRRT year, or no starting base loss for an earlier MRRT year, for the mining project interest to which the asset relates, because of paragraph 11515(2)(a), 13015(a) or (b) or 2005(b) or (c);

the amount included in the miner’s *mining revenue under subsection (4) is reduced by the following:

where:

excess amount is the amount of the excess mentioned in subsection (4).

sum of reductions is the sum of:

 (a) any reductions to a *starting base loss relating to the *starting base asset, for that *MRRT year or an earlier MRRT year, under subsection 8040(3) or (4); and

 (b) any reductions to a starting base loss relating to the asset, for that MRRT year or an earlier MRRT year, under paragraph 11515(2)(b); and

 (c) any starting base losses, for that MRRT year or an earlier MRRT year, that paragraph 11515(2)(a), 13015(a) or (b) or 2005(b) extinguished, or paragraph 2005(c) prevented from arising, to the extent that they related (or would have related) to the asset.

total decline is the sum of the declines in value of the asset that have happened during that *MRRT year or any earlier MRRT year.

Note 1: Reductions happen under subsection 8040(3) or (4) if the asset is used, installed for use, or constructed for use:

(a) for a purpose other than carrying on upstream mining operations relating to the mining project interest; or

(b) in connection with excluded expenditure.

Note 2: Starting base losses are reduced under paragraph 11515(2)(b) if a miner chooses to treat a mining project interest as having combined with another despite noncompliance with section 11535.

Note 3: Starting base losses are extinguished, or prevented from arising, if:

(a) under paragraph 11515(2)(a), a miner chooses to treat a mining project interest as having combined with another despite noncompliance with section 11535; or

(b) under paragraph 13015(a) or (b), the suspension day for the mining project interest happens; or

(c) under paragraph 2005(b) or (c), a miner chooses to use the simplified MRRT method.

Part 36Transferred premining loss allowances

Division 95Transferred premining loss allowances

Guide to Division 95

951  What this Division is about

Transferred premining loss allowances enable a miners MRRT liability for a mining project interest for an MRRT year to be reduced by premining losses relating to certain other premining project interests that the miner has, or that a closely associated entity has.

Table of sections

Operative provisions

955 Object of this Division

9510 When a miner has a transferred premining loss allowance

9515 The amount of a transferred premining loss allowance

9520 Available premining losses for a transferred premining loss allowance

9525 Cap on available premining losses

9530 The premining loss cap

Operative provisions

955  Object of this Division

  The object of this Division is to enable *premining losses related to a *premining project interest to be transferred to mining project interests that are sufficiently connected to the premining losses (even if the mining project interests did not *originate from the premining project interest).

9510  When a miner has a transferred premining loss allowance

  A miner has a transferred premining loss allowance for a mining project interest for an *MRRT year if:

 (a) there is an amount (a remaining profit) by which the miners *mining profit for the mining project interest for the year exceeds the sum of all the *higher ranking allowances (if any) that the miner has for the mining project interest for the year; and

 (b) there are one or more *premining losses (available premining losses) that, under section 9520, can be applied in working out a transferred premining loss allowance for the interest for the year.

9515  The amount of a transferred premining loss allowance

 (1) The amount of the miners *transferred premining loss allowance is so much of the sum of the available premining losses as does not exceed the remaining profit.

 (2) In working out the amount of a *transferred premining loss allowance, *premining losses are applied in the order in which they arise, but the miner may choose the order in which to apply premining losses that arise at the same time.

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

9520  Available premining losses for a transferred premining loss allowance

 (1) A *premining loss can be applied in working out a *transferred premining loss allowance for the mining project interest (the receiving interest) for the year in the circumstances set out in subsection (2) or (3).

Note: Once a premining loss has been fully applied, it ceases to be a premining loss (see subsection 7030(2)), and therefore cannot be applied in working out a transferred premining loss allowance.

Premining project interest in force

 (2) The *premining loss can be applied if:

 (a) the *entity that *holds the *premining project interest (the loss project interest) to which the premining loss relates is:

 (i) the miner; or

 (ii) another entity that is *closely associated with the miner at the end of the year; and

 (b) either:

 (i) both the receiving interest and the loss project interest relate to iron ore; or

 (ii) both the receiving interest and the loss project interest do not relate to iron ore.

Premining project interest replaced by a different mining project interest

 (3) The *premining loss can be applied if:

 (a) a mining project interest *originates from the *premining project interest to which the premining loss relates; and

 (b) the *entity that has that mining project interest (also the loss project interest) is:

 (i) the miner; or

 (ii) another entity that is *closely associated with the miner at the end of the year; and

 (c) either:

 (i) both the receiving interest and the loss project interest relate to iron ore; or

 (ii) both the receiving interest and the loss project interest do not relate to iron ore.

Competing applications of a premining loss

 (4) Despite subsections (2) and (3), the *premining loss cannot be applied to the extent that it is applied in working out, for the year:

 (a) a *premining loss allowance; or

 (b) a *transferred premining loss allowance;

for another mining project interest.

Meaning of closely associated

 (5) A miner is closely associated with another *entity at a time if, at that time, they:

 (a) are both *members of the same *consolidatable group; or

 (b) would both be members of the same consolidatable group if the otherwise applicable requirements in column 3 of the table in subsection 70315(2) of the Income Tax Assessment Act 1997 (Australian residence requirements) were disregarded.

Note: The members of a consolidated group are closely associated, since a consolidatable group continues to exist even after the day on and after which the consolidatable group is taken to be consolidated.

9525  Cap on available premining losses

 (1) Despite section 9520, a *premining loss that could otherwise be applied in working out a *transferred premining loss allowance cannot be applied under that section, to the extent the application of the loss would result in:

 (a) premining losses that count towards the loss project interests *premining loss cap exceeding that cap; or

 (b) premining losses that count towards the receiving interests premining loss cap exceeding that cap.

 (2) A *premining loss that has been, or is to be, applied in working out a *transferred premining loss allowance counts towards the *premining loss cap of an interest if:

 (a) the interest is the loss project interest or receiving interest for that application of the loss; and

 (b) the common ownership test in subsection (3) is not met for that application of the loss; and

 (c) the premining loss arose in the *MRRT year in which the interests premining loss cap arose (the cap year), or an earlier year; and

 (d) the transferred premining loss allowance is for the cap year, or a later year.

Common ownership test for transfer of premining losses

 (3) The common ownership test is met for a *premining loss that is to be applied in working out a *transferred premining loss allowance if the *entity that has the loss project interest is the same as, or *closely associated with, the entity that has the receiving interest, at all times in the period:

 (a) starting at the start of the *MRRT year for which the loss arises; and

 (b) ending at the end of the MRRT year for which the loss is to be applied.

Note 1: It is not a requirement that the same entity has an interest at all times in the period mentioned.

Note 2: Section 11555 sets out further restrictions on applying premining losses if a mining project interest is a combined interest under Division 115.

9530  The premining loss cap

 (1) A premining loss cap arises for a mining project interest or a *premining project interest if:

 (a) an *entity starts to have the interest, other than:

 (i) because the interest came into existence; or

 (ii) because of the operation of section 21520, 21525 or 21530 (interests joining or leaving a consolidated group); or

 (b) the entity that has the interest:

 (i) joins or leaves a *consolidatable group; or

 (ii) would join or leave a consolidatable group if the requirements in column 3 of the table in subsection 70315(2) of the Income Tax Assessment Act 1997 (Australian residence requirements) for an entity to be a *head company or *subsidiary member of a consolidatable group were disregarded.

 (2) The amount of the *premining loss cap for a mining project interest or *premining project interest is worked out by dividing by the *MRRT rate:

 (a) if paragraph (1)(a) applies—the amount paid or payable by the *entity for starting to have the interest; or

 (b) if paragraph (1)(b) applies—so much of the amount paid or payable for the joining or leaving as is reasonably attributable to the interest.

 (3) However, if a mining project interest or *premining project interest would, apart from this subsection, have more than one *premining loss cap, the premining loss cap for the interest is the one that arises last.

Part 37Transferred mining loss allowances

Division 100Transferred mining loss allowances

Guide to Division 100

1001  What this Division is about

A miners MRRT liability for a mining project interest may be reduced by mining losses from one or more other mining project interests.

The interests must satisfy a common ownership test from the year the loss arises to the year the loss is applied.

Table of sections

Operative provisions

1005 Object of this Division

10010 When a miner has a transferred mining loss allowance

10015 The amount of a transferred mining loss allowance

10020 Available mining losses

10025 Common ownership test

Operative provisions

1005  Object of this Division

  The object of this Division is to enable *mining losses of a mining project interest to be transferred to other mining project interests, subject to certain limitations primarily designed to ensure that the interests constitute a single economic unit.

10010  When a miner has a transferred mining loss allowance

  A miner has a transferred mining loss allowance for a mining project interest for an *MRRT year if:

 (a) there is an amount (a remaining profit) by which the miners *mining profit for the interest for the year exceeds the sum of all the *higher ranking allowances (if any) that the miner has for the interest for the year; and

 (b) there are one or more *mining losses (available mining losses) that, under section 10020, can be applied in working out the transferred mining loss allowance for the interest for the year.

10015  The amount of a transferred mining loss allowance

 (1) The amount of the miners *transferred mining loss allowance is so much of the sum of the available mining losses as does not exceed the remaining profit.

 (2) In working out the amount of a *transferred mining loss allowance, *mining losses are applied in the order in which they arise, but the miner may choose the order in which to apply mining losses that arise at the same time.

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

10020  Available mining losses

 (1) A *mining loss can be applied in working out a *transferred mining loss allowance for a mining project interest (the receiving interest) for an *MRRT year (the transfer year) if:

 (a) the condition in section 10025 (common ownership test) is met; and

 (b) the mining loss does not relate to an MRRT year for which the alternative valuation method under Division 175 was chosen in relation to the mining project interest for which the mining loss arises (the loss project interest); and

 (c) either:

 (i) both the loss project interest and the receiving interest relate to iron ore; or

 (ii) both the loss project interest and the receiving interest do not relate to iron ore.

 (2) Despite subsection (1), the *mining loss cannot be applied to the extent it is applied in working out:

 (a) a *mining loss allowance; or

 (b) a *transferred mining loss allowance;

for another mining project interest for the year.

Note: Section 11560 sets out further restrictions on applying mining losses if a mining project interest is a combined interest under Division 115.

10025  Common ownership test

 (1) At all times in the period mentioned in subsection (2), the miner who has the loss project interest and the miner who has the receiving interest must be:

 (a) the same miner; or

 (b) *closely associated with each other.

 (2) The period:

 (a) starts at the start of the *MRRT year for which the *mining loss arises; and

 (b) ends at the end of the transfer year.

 (3) To avoid doubt, it is not a requirement of subsection (1) that the same miner has an interest at all times in the period mentioned.

Example:  At the start of the period, the loss project interest and the receiving interest are held by the same miner. Part way through the period, the loss project interest is transferred to another entity in the same consolidatable group. The condition in this section is met because, at all times in the period, the interests were held by either the same miner, or a closely associated miner.

Chapter 4Specialist liability rules

Part 41Mining project interests

Division 115Combining mining project interests

Table of Subdivisions

 Guide to Division 115

115A Object of this Division

115B When mining project interests are combined

115C The effect of combining mining project interests

Guide to Division 115

1151  What this Division is about

Mining project interests are combined in a single mining project interest if certain requirements are met (in particular, they must be integrated with each other). The combined mining project interest in effect takes the place of those mining project interests.

Subdivision 115AObject of this Division

Table of sections

1155 Object of this Division

1155  Object of this Division

  The object of this Division is to treat mining project interests that are *integrated as a single interest (unless it would compromise the quarantining rules for *allowance components), so that the single interest becomes the basis for ascertaining the *MRRT liability for all those interests.

Subdivision 115BWhen mining project interests are combined

Table of sections

11510 Mining project interests may be treated as the same mining project interest

11515 Choosing to override noncompliance

11520 Transferability of royalty credits

11525 Transferability of premining losses

11530 Transferability of mining losses

11535 Starting base losses and starting base assets

11510  Mining project interests may be treated as the same mining project interest

 (1) For the purposes of the *MRRT law (other than this Division and Division 255), 2 or more mining project interests (constituent interests) are taken to be the same mining project interest (the combined interest) from a particular time (the combining time) during an *MRRT year if:

 (a) each of the constituent interests is *integrated with each of the other constituent interests; and

 (b) each *royalty credit relating to any of the constituent interests complies with section 11520; and

 (c) each amount (an existing premining loss) that:

 (i) is a *premining loss relating to any of the constituent interests; or

 (ii) if the MRRT year were to end at the combining time, would be a premining loss relating to any of the constituent interests;

  complies with section 11525; and

 (d) each amount (an existing mining loss) that:

 (i) is a *mining loss relating to any of the constituent interests; or

 (ii) if the MRRT year were to end at the combining time, would be a mining loss relating to any of the constituent interests;

  complies with section 11530; and

 (e) each *starting base loss, or *starting base asset that has a *base value greater than zero, relating to any of the constituent interests complies with section 11535.

Note: For when interests are integrated, see Division 255.

 (2) Any of the constituent interests may be mining project interests to which this section has already applied.

 (3) However, if the *suspension day for a mining project interest has happened, the mining project interest cannot be a constituent interest.

11515  Choosing to override noncompliance

 (1) The fact that:

 (a) a *royalty credit relating to a constituent interest does not comply with section 11520; or

 (b) an existing premining loss relating to a constituent interest does not comply with section 11525; or

 (c) an existing mining loss relating to a constituent interest does not comply with section 11530; or

 (d) a *starting base loss, or *starting base asset does not comply with section 11535;

does not prevent section 11510 applying to the constituent interest if the miner who has the constituent interest chooses to have the constituent interest treated as part of the combined interest despite the noncompliance.

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

 (2) If the miner makes that choice:

 (a) any such *royalty credit, existing premining loss, existing mining loss or *starting base loss is extinguished; and

 (b) the starting base loss for the combined interest for an *MRRT year is reduced by the amount of any declines in value, for the year, of *starting base assets that:

 (i) relate to a constituent interest; and

 (ii) do not comply with section 11535.

 (3) However, if:

 (a) an existing premining loss does not comply with section 11525 because section 9525 or 11555 partly prevents the existing premining loss from being applied in working out a *transferred premining loss allowance; and

 (b) there is no other reason why the loss does not comply with section 11525;

the loss is extinguished under paragraph (2)(a) only to the extent that section 9525 or 11555 prevents the existing premining loss from being so applied.

11520  Transferability of royalty credits

  A *royalty credit that relates to one of the constituent interests complies with this section if, under section 6520 (available royalty credits), the royalty credit could be applied in working out a *transferred royalty allowance for each of the other constituent interests for the *MRRT year if:

 (a) the year were to end at the combining time; and

 (b) subsection 6520(2) were disregarded.

11525  Transferability of premining losses

  An existing premining loss that relates to one of the constituent interests complies with this section if:

 (a) under section 9520 (available premining losses), the existing premining loss could be applied in working out a *transferred premining loss allowance for each of the other constituent interests for the *MRRT year if:

 (i) the year were to end at the combining time; and

 (ii) subsection 9520(4) were disregarded; and

 (aa) section 9525 (cap on available premining losses) does not wholly or partly prevent the existing premining loss from being so applied; and

 (b) in a case where one or more of the constituent interests is a combined interest under a previous application of this Division—section 11555 does not wholly or partly prevent the existing premining loss from being so applied.

Note: Section 9525 (cap on available premining losses) may impose additional limits on the availability of premining losses under section 9520.

11530  Transferability of mining losses

  An existing mining loss that relates to one of the constituent interests complies with this section if:

 (a) under subsection 10020(1) (available mining losses), the existing mining loss could be applied in working out a *transferred mining loss allowance for each of the other constituent interests for the *MRRT year if:

 (i) the year were to end at the combining time; and

 (ii) subsection 10020(2) were disregarded; and

 (b) in a case where one or more of the constituent interests is a combined interest under a previous application of this Division—section 11560 does not prevent the existing mining loss from being so applied.

11535  Starting base losses and starting base assets

  A *starting base loss, or a *starting base asset, that relates to one of the constituent interests complies with this section if:

 (a) the constituent interest:

 (i) existed on 2 May 2010; or

 (ii) *originates from a *premining project interest that existed on 2 May 2010; and

 (b) the miner who has the constituent interest is, and at all times since 2 May 2010 has been, the miner who has each other constituent interest (or the premining project interest from which the interest originates).

Subdivision 115CThe effect of combining mining project interests

Table of sections

11540 The effect of combining mining project interests

11545 Allowance components arising in preceding MRRT years

11550 Different valuation approaches for mining project interests

11555 Transferred premining loss allowances

11560 Transferred mining loss allowances

11565 Choice of the alternative valuation method

11540  The effect of combining mining project interests

  In the *MRRT year (the combining year) in which the constituent interests are taken to be the combined interest, the miner is liable to pay any MRRT that is payable in relation to:

 (a) the constituent interests; and

 (b) the part of the year before the constituent interests become the combined interest;

as if the constituent interests were taken to be the combined interest at the start of the year.

Note 1: If the whole of the combined interest is transferred later in the same year to a new miner, the new miners MRRT liability in relation to the year will include the liability under this section: see Division 120.

Note 2: If a part of the combined interest is transferred later in the same year to a new miner, the new miners MRRT liability in relation to the year will include a part of the liability under this section: see Division 125.

11545  Allowance components arising in preceding MRRT years

Royalty credits

 (1) Any *royalty credit for a constituent interest for an *MRRT year preceding the combining year is taken to be a royalty credit for the combined interest for that year.

Premining losses

 (2) If, for an *MRRT year preceding the combining year, there is a *premining loss for at least one of the constituent interests:

 (a) all of the premining losses for the constituent interests for the year are taken to be a single premining loss for the combined interest for that MRRT year; and

 (b) the amount of the single premining loss is taken to be the sum of those premining losses.

Mining losses

 (3) If, for an *MRRT year preceding the combining year, there is a *mining loss for at least one of the constituent interests:

 (a) all of the mining losses for the constituent interests for the year are taken to be a single mining loss for the combined interest for that MRRT year; and

 (b) the amount of the single mining loss is taken to be the sum of those mining losses.

Starting base losses

 (4) If, for an *MRRT year preceding the combining year, there is a *starting base loss for at least one of the constituent interests:

 (a) all of the starting base losses for the constituent interests for the year are taken to be a single starting base loss for the combined interest for that MRRT year; and

 (b) the amount of the single starting base loss is taken to be the sum of those starting base losses.

 (5) However, subsection (4) does not apply in circumstances covered by section 11550.

11550  Different valuation approaches for mining project interests

 (1) If, under Division 85, there is not the same valuation approach, for all the constituent interests:

 (a) in the circumstances mentioned in subsection (2), there are 2 *starting base losses, for the combined interest for the same *MRRT year, of the amounts provided in subsection (3); and

 (b) in working out the amount of a *starting base allowance for the combined interest for an MRRT year, the starting base losses for the combined interest in the year are to be applied in the order specified in subsection (4); and

 (c) in working out under Division 90 the decline in value of any *starting base asset relating to the constituent interest during an MRRT year, assume that the applicable valuation approach is the valuation approach specified under subsection (5).

 (2) There are 2 *starting base losses, for the combined interest for the same *MRRT year, if, for the year:

 (a) there would have been one or more starting base losses (book value starting base losses) for the constituent interests for which the book value approach is the valuation approach under Division 85; and

 (b) there would have been one or more starting base losses (market value starting base losses) for the constituent interests for which the market value approach is the valuation approach under Division 85;

if the combined interest had not existed.

 (3) The amounts of those 2 *starting base losses are:

 (a) an amount equal to the sum of the book value starting base losses; and

 (b) an amount equal to the sum of the market value starting base losses.

 (4) Despite subsection 8015(2), the order for applying the *starting base losses for the combined interest for the year is:

 (a) the starting base loss relating to the book value starting base losses; then

 (b) the starting base loss relating to the market value starting base losses.

 (5) The valuation approach is:

 (a) the book value approach if the asset relates to a constituent interest for which the book value approach is the valuation approach under Division 85; or

 (b) the market value approach if the asset relates to a constituent interest for which the market value approach is the valuation approach under Division 85.

 (6) For the purposes of this section, if any of the constituent interests has, under section 8050, 2 *starting base losses for the same *MRRT year, treat the interest as 2 constituent interests for which the valuation approaches under Division 85 are different.

11555  Transferred premining loss allowances

 (1) If:

 (a) a *premining loss relates to:

 (i) a mining project interest other than the combined interest (or any of the constituent interests); or

 (ii) a *premining project interest; and

 (b) the loss arose in relation to an *MRRT year preceding the combined interest coming into existence; and

 (c) in relation to at least one of the constituent interests—section 9525 (cap on available premining losses) would have, to any extent, prevented the loss from being applied in working out a *transferred premining loss allowance for the constituent interest for the year (if the combined interest had not existed);

the loss cannot be applied in working out a transferred premining loss allowance for the combined interest for an MRRT year to the extent that that section would have prevented the loss from being so applied in working out transferred premining loss allowances for all the constituent interests for the year (if the combined interest had not existed).

 (2) If:

 (a) a *premining loss relates to the combined interest (or any of the constituent interests); and

 (b) the loss arose in relation to an *MRRT year preceding the combined interest coming into existence; and

 (c) in relation to at least one of the constituent interests—section 9525 (cap on available premining losses) would have, to any extent, prevented the loss from being applied in working out a *transferred premining loss allowance for another mining project interest (other than the combined interest or any of the constituent interests) for the year if:

 (i) the combined interest had not existed; and

 (ii) the loss had related to the constituent interest;

the loss cannot be applied in working out a transferred premining loss allowance for the other interest for an MRRT year to the extent that that section would have prevented the loss from being so applied in working out transferred premining loss allowances for all the constituent interests for the year (if the combined interest had not existed).

 (3) This section has effect despite section 9525 (cap on available premining losses).

11560  Transferred mining loss allowances

 (1) A *mining loss relating to a mining project interest other than the combined interest (or any of the constituent interests) cannot be applied in working out a *transferred mining loss allowance for the combined interest for an *MRRT year if:

 (a) in relation to at least one of the constituent interests—subsection 10020(1) (available mining losses) would not have allowed the loss to be applied in working out a transferred mining loss allowance for the constituent interest for the year (if the combined interest had not existed); and

 (b) the loss arose in relation to an MRRT year preceding the combined interest coming into existence.

 (2) A *mining loss relating to the combined interest (or any of the constituent interests) cannot be applied in working out a *transferred mining loss allowance for another mining project interest for an *MRRT year if:

 (a) in relation to at least one of the constituent interests—subsection 10020(1) (available mining losses) would not have allowed the loss to be applied in working out a transferred mining loss allowance for the other mining project interest for the year if:

 (i) the combined interest had not existed; and

 (ii) the loss had related to the constituent interest; and

 (b) the loss arose in relation to an MRRT year preceding the combined interest coming into existence.

 (3) This section has effect despite section 10020 (available mining losses).

11565  Choice of the alternative valuation method

 (1) A choice by the miner to use the alternative valuation method under Division 175 in relation to any of the constituent interests for the combining year has no effect.

 (2) The miner may choose to use the alternative valuation method under Division 175 in relation to the combined interest for the year in the circumstances set out in Subdivision 175B. The choice relates to the whole of the year.

Division 120Transferring mining project interests

Guide to Division 120

1201  What this Division is about

If a mining project interest is transferred, in most respects the new miner takes over from the original miner in relation to MRRT matters. In particular, the new miner bears the MRRT liability for the transfer year.

Table of sections

Operative provisions

1205 Object of this Division

12010 Effect of mining project transfer

12015 Effect of transferred property

12020 Events happening after mining project transfer

12025 Start of mining venture taken to be mining project transfer

Operative provisions

1205  Object of this Division

  The object of this Division is to ensure that, if a mining project interest is transferred:

 (a) consistent with the MRRT being a projectbased tax, matters relevant to the MRRT that are connected with the interest before the transfer remain connected with the interest after the transfer; and

 (b) in particular, the *MRRT liability for the interest for the part of the *MRRT year before the transfer attaches to the miner who has the interest after the transfer, and not to the miner who had the interest before the transfer.

12010  Effect of mining project transfer

Liability for MRRT moves with interest

 (1) Any MRRT that would otherwise be payable by a miner in relation to a mining project interest in relation to the part of an *MRRT year before a *mining project transfer happens (the pretransfer part year) is payable instead, in accordance with this Division:

 (a) by the miner that has the mining project interest after the transfer; and

 (b) in the MRRT year for that miner in which the transfer happens.

Note 1: The MRRT liability for the miner that has the interest after the transfer is worked out in accordance with this Division. It may be more, or less, than the liability the other miner would have had, depending on circumstances such as choices, offsets and available allowances.

Note 2: For any period after the transfer that the new miner has the interest, its liability for MRRT (if any) is worked out under the ordinary rules.

Note 3: The miner that has the interest after the transfer may have an additional amount of instalment income in the instalment quarter in which the transfer happens: see section 11595 in Schedule 1 to the Taxation Administration Act 1953.

Continuation of mining project interest

 (2) The mining project interest (the new interest) that a miner (the new miner) has just after a *mining project transfer is taken to be a continuation of the mining project interest (the original interest) a miner (the original miner) had just before the transfer.

Note: This means, for example, that:

(a) the mining project interest retains the history of when it started, and of the miners who have had the interest at various times; and

(b) a choice made, under Division 85, of the valuation approach for the mining project interest continues to have effect; and

(c) starting base assets that have been used to an extent in relation to the mining project interest before the transfer retain the history of that use.

Meaning of mining project transfer

 (3) A mining project transfer happens if:

 (a) an *arrangement that has the effect of transferring the whole of the entitlement comprising a mining project interest from one miner to a single other *entity comes into force; and

 (b) the mining project interest the other entity starts to have covers the same *project area.

Note: If the arrangement relates to a combined interest (see Division 115) that is integrated because the original miner chose downstream integration:

(a) the interest will not be a combined interest after the transfer unless the new miner has chosen downstream integration; and

(b) under Division 125, there will be a split of the combined interest until the new miner makes such a choice.

MRRT amounts move with interest

 (4) For the purposes of the application of the *MRRT law in the *MRRT year in which the transfer happens or a later MRRT year, each of the following amounts that, apart from this Division, would be an amount for the original miner and the original interest is instead an amount for the new miner and the new interest:

 (a) an amount included in *mining revenue for the pretransfer part year or an earlier MRRT year;

 (b) an amount included in *mining expenditure for the pretransfer part year or an earlier MRRT year;

 (c) an amount of a *royalty credit arising for the original interest in the pretransfer part year;

 (d) an amount of an *allowance component arising in an earlier MRRT year;

 (e) if the transfer happens because of the operation of section 12025—the amount of the *premining loss cap (if any) for the original interest.

Note 1: Under section 12025, the start of a mining venture may be taken to be a mining project transfer.

Note 2: If the original miner’s MRRT year starts before the new miner’s MRRT year, the effect of this provision is that amounts from before the start of the new miner’s MRRT year are taken into account for the new miner in the new miner’s MRRT year.

Example: The original miner has a substituted accounting period of 12 months from 1 April to 31 March. The new miner has an MRRT year of 1 July to 30 June. The transfer happens on 1 July. The amounts covered by subsection (4) are all amounts that would be amounts for the original miner for the period from 1 April to 30 June, so these will be amounts for the new miner for the MRRT year 1 July to 30 June.

Choices

 (5) Despite subsection (4), in working out under that subsection an amount for the *MRRT year in which the transfer happens or a later MRRT year, a choice of the following kind made by the new miner is taken into account, but a choice of that kind made by the original miner is disregarded:

 (a) a choice under Division 175 to use the alternative valuation method in relation to the mining project interest for the *MRRT year in which the mining project transfer happens;

 (b) a choice under Division 200 to use the simplified MRRT method for that year.

Note: The effect of a simplified MRRT method choice made for a year before the transfer year is not affected: all allowance components are extinguished (see Division 200).

Example: An original miner had made a choice to use the alternative valuation method in the MRRT year in which a mining project transfer happens. The new miner makes no choices.

 The new miner works out the amounts to include in its mining revenue for the pretransfer part year by working out the amount the original miner would have included if the original miner had not chosen to use the alternative valuation method.

Suspension day

 (6) If there is a *suspension day for the mining project interest that was chosen under paragraph 13010(1)(a):

 (a) the *mining project transfer does not affect:

 (i) any extinguishment under section 13015 of *allowance components relating to the mining project interest; or

 (ii) any *rehabilitation tax offset amounts, for any earlier *MRRT years, relating to the mining project interest; and

 (b) that suspension day:

 (i) does not affect any further allowance components relating to the mining project interest and that MRRT year or later MRRT years; but

 (ii) is no longer to be taken into account in determining whether there are any rehabilitation tax offset amounts, for that MRRT year or any later MRRT years, relating to the mining project interest.

Note: The new miner may make a suspension day choice in the circumstances set out in Division 130.

12015  Effect of transferred property

 (1) This section applies if:

 (a) any property, or any legal or equitable right that is not property, (the transferred property) is transferred to the new miner under the *mining project transfer; and

 (b) the original miner used the transferred property in *mining operations for the mining project interest; and

 (c) the transferred property:

 (i) gave rise to an amount of *mining expenditure for the original miner, or another miner who preceded the original miner, in relation to the mining project interest; or

 (ii) is, or may become, a *starting base asset, in relation to the mining project interest.

 (2) Despite section 3040, no amount is included in the original miners *mining revenue for the mining project interest in relation to any part of the consideration for the transfer that relates to the transferred property.

 (3) For the new miner, any part of the consideration for the transfer that relates to the transferred property is taken, for the purposes of section 3535, to be expenditure relating to the acquisition of the mining project interest.

 (4) To avoid doubt, the *mining project transfer, and the transfer of the transferred property, is not an event or circumstance giving rise to an adjustment under Division 160.

Note: Events or circumstances happening after the transfer may give rise to adjustment under Division 160, for instance if the new miner uses the transferred property in relation to the mining project interest to a greater or lesser extent than the original miner.

12020  Events happening after mining project transfer

 (1) A thing that happens at a particular time in relation to an *entity (the first entity) is taken instead to happen in relation to another entity, and to have the effect mentioned in paragraph (c) in relation to a mining project interest the other entity has, if:

 (a) the other entity has the interest at the time as a result of a *mining project transfer; and

 (b) the first entity had the interest at an earlier time; and

 (c) if the first entity still had the interest, the thing would affect the first entitys *MRRT liability, *allowance components or *rehabilitation tax offsets for the interest.

 (2) However, if one or more *mining project splits or *premining project splits has happened in relation to the interest in the period from when the first entity last had the interest until the time the thing happens:

 (a) the thing is taken to happen in relation to the other entity in relation to the interest; but

 (b) the extent to which the thing affects the other entitys *MRRT liability, *allowance components or *rehabilitation tax offsets is reduced to reflect:

 (i) if only one split (whether a mining project split or a premining project split) happened in the period—the *split percentage relating to that split; or

 (ii) if 2 or more such splits happened in the period—a percentage worked out by multiplying the split percentages for each of those splits.

Note: The first entity is required to advise the other entity about the thing that happens: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

Example: After a mining project transfer happens, the original miner makes an initial supply of taxable resources that would have given rise to an amount of mining revenue for the miner if it still had the interest. Instead, the new miner is taken to have made the initial supply, and includes the amount in mining revenue for the interest.

12025  Start of mining venture taken to be mining project transfer

 (1) The start of a *mining venture is taken to be a *mining project transfer of a mining project interest that existed, just before that start, under subsection 155(4) if:

 (a) the start of the mining venture gives rise to a single mining project interest under subsection 155(1); and

 (b) the mining venture relates to all of the *taxable resources to which the mining project interest under subsection 155(4) related.

 (2) In applying this Division for the purposes of subsection (1), disregard subsection 12010(5) and paragraph 12010(6)(b).

Example: TressCo has a mining project interest under subsection 155(4) as a result of being granted a production right entitling it to extract coal from an area.

 TressCo later starts a mining venture, in which it is the sole participant, to extract the whole coal deposit from the whole of the area to which the production right relates. The start of this mining venture gives rise to a mining project interest for TressCo under subsection 155(1) and is taken to be a mining project transfer of the mining project interest TressCo had under subsection 155(4).

 One effect of this is that the interest TressCo has in the mining venture (the new interest) is taken to be a continuation of the mining project interest it had under subsection 155(4) (the original interest).

Division 125Splitting mining project interests

Guide to Division 125

1251  What this Division is about

If a mining project interest is split, in most respects the new miners take over from the original miner in relation to MRRT matters, each to an extent appropriate to their share of the split. In particular, each new miner bears an appropriate share of the MRRT liability for the year of the split.

Table of sections

Operative provisions

1255 Object of this Division

12510 Effect of mining project split

12515 Meaning of split percentage

12520 Effect of transferred property

12525 Effect of MRRT liability from earlier years on rehabilitation tax offset amounts

12530 Events happening after mining project split

12535 Start of mining venture taken to be mining project split

Operative provisions

1255  Object of this Division

  The object of this Division is to ensure that, if a mining project interest is split:

 (a) consistent with the MRRT being a projectbased tax, matters relevant to the MRRT that are connected with the interest before the split remain connected (to the appropriate extents) with the split interests after the split; and

 (b) in particular, the *MRRT liability for the interest for the part of the *MRRT year before the split attaches (to the appropriate extents) to the miners who have the split interests after the split.

12510  Effect of mining project split

Liability for MRRT moves with interest

 (1) Any MRRT that would otherwise be payable by a miner in relation to a mining project interest in relation to the part of an *MRRT year before a *mining project split happens (the presplit part year) is payable instead, in accordance with this Division:

 (a) by each miner that has the mining project interest after the split; and

 (b) in the MRRT year for each such miner in which the split happens.

Note 1: The MRRT liability for each split interest is worked out in accordance with this Division. The sum total of those liabilities may be more, or less, than the liability the original miner would have had, depending on circumstances such as choices, offsets and available allowances.

Note 2: For any period after the split that the new miner has the interest, its liability for MRRT (if any) is worked out under the ordinary rules.

Note 3: The miner that has the interest after the split may have an additional amount of instalment income in the instalment quarter in which the split happens: see section 11595 in Schedule 1 to the Taxation Administration Act 1953.

Continuation of mining project interest

 (2) Each mining project interest (a new interest) that a miner (a new miner) has just after a *mining project split is taken to be a continuation of the mining project interest (the original interest) a miner (the original miner) had just before the split.

Note: This means, for example, that:

(a) each split interest retains the history of when the mining project interest started, and of the entities who have held the interest at various times; and

(b) a choice made, under Division 85, of the valuation approach for the mining project interest continues to have effect; and

(c) starting base assets that have been used to an extent in relation to the mining project interest before the transfer retain the history of that use.

Meaning of mining project split

 (3) A mining project split happens if:

 (a) an *arrangement comes into force that has the effect of transferring, from one miner to 2 or more other *entities, the whole of the entitlement comprising a mining project interest; or

 (b) an arrangement comes into force that has the effect of transferring, from one miner to one or more other entities, a part of the entitlement comprising a mining project interest; or

 (c) under an *Australian law, the *production right to which a mining project interest relates is split into 2 or more production rights; or

 (d) 2 or more constituent interests that are taken to be the same mining project interest because of Division 115 stop being *integrated.

Note: A new miner may also be the original miner, in the situations described in paragraphs (b), (c) and (d).

MRRT amounts move with interest

 (4) For the purposes of the application of the *MRRT law in the *MRRT year in which the split happens or a later MRRT year, each of the following amounts that, apart from this Division, would be an amount for the original miner and the original interest is instead, to the extent of a new interests *split percentage, an amount for the new miner and the new interest:

 (a) an amount included in *mining revenue for the presplit part year or an earlier MRRT year;

 (b) an amount included in *mining expenditure for the presplit part year or an earlier MRRT year;

 (c) an amount of a *royalty credit arising for the original interest in the presplit part year;

 (d) an amount of an *allowance component arising in an earlier MRRT year;

 (e) if the new miner is the same *entity as the original miner—the amount of the *premining loss cap (if any) for the original interest.

Note 1: If the new miner is not the same entity as the original miner, a new premining loss cap arises for the new interest under section 9530.

Note 2: If the original miner’s MRRT year starts before a new miner’s MRRT year, the effect of this provision is that amounts from before the start of the new miner’s MRRT year are taken into account for the new miner in the new miner’s MRRT year.

Example: The original miner has a substituted accounting period of 12 months from 1 April to 31 March. The new miner has an MRRT year of 1 July to 30 June. The split happens on 1 July. The amounts covered by subsection (4) are all amounts that would be amounts for the original miner for the period from 1 April to 30 June, so these will, to the extent of the new interest’s split percentage, be amounts for the new miner for the MRRT year 1 July to 30 June.

Choices

 (5) Despite subsection (4), in working out under that subsection an amount for the *MRRT year in which the split happens or a later MRRT year, a choice of the following kind made by the new miner is taken into account, but a choice of that kind made by the original miner is disregarded:

 (a) a choice under Division 175 to use the alternative valuation method in relation to the mining project interest for the *MRRT year in which the *mining project split happens;

 (b) a choice under Division 200 to use the simplified MRRT method for the MRRT year in which the split happens.

Note: The effect of a simplified MRRT method choice made for a year before the split year is not affected: all allowance components are extinguished (see Division 200).

Example: A mining project interest is split into 2 mining project interests held by 2 different new miners. The original miner had made a choice to use the alternative valuation method for the interest for the MRRT year in which the split happens. One of the new miners also chooses to use the alternative valuation method and one does not.

 The new miner that chooses to use the alternative valuation method works out the amounts to include in its mining revenue for the presplit part year by working out the amount the original explorer would have included, then applying its split percentage.

 The other new miner works out the amount to include in its mining revenue for the presplit part year by working out the amount the original miner would have included if no choices were made, then applying its split percentage.

Suspension day

 (6) If there is a *suspension day for the mining project interest that was chosen under paragraph 13010(1)(a):

 (a) the *mining project split does not affect:

 (i) any extinguishment under section 13015 of *allowance components relating to the mining project interest; or

 (ii) any *rehabilitation tax offset amounts, for any earlier *MRRT years, relating to the mining project interest; and

 (b) that suspension day:

 (i) does not affect any further allowance components relating to a new interest and to that MRRT year or later MRRT years; but

 (ii) is no longer to be taken into account in determining whether there are any rehabilitation tax offset amounts, for that MRRT year or any later MRRT years, relating to a new interest.

Note: The new miner may make a suspension day choice in the circumstances set out in Division 130.

Exception for new miner that is the same entity as original miner

 (7) If a new miner in relation to a *mining project split is the same *entity as the original miner:

 (a) a choice that would otherwise be disregarded under subsection (5) in working out an amount for that new miner is not disregarded; and

 (b) paragraph (6)(b) does not apply in relation to the new interest that that new miner has.

Note: This subsection does not affect the operation of subsection (5) and paragraph (6)(b) for a new miner that is not the original miner.

12515  Meaning of split percentage

 (1) The split percentage for a new interest a miner has just after a *mining project split is the percentage that best reflects a reasonable approximation of the *market value of the new interest, expressed as a percentage of the sum of the market values of all the new interests arising from the split.

 (2) The *market values mentioned in subsection (1) are those values just after the *mining project split to which the new interest relates.

 (3) To avoid doubt, the sum of the *split percentages for the new interests must equal 100%.

12520  Effect of transferred property

 (1) This section applies if:

 (a) any property, or any legal or equitable right that is not property, (the transferred property) is transferred to a new miner under the *mining project split; and

 (b) the original miner used the transferred property in *mining operations for the mining project interest; and

 (c) the transferred property:

 (i) gave rise to an amount of *mining expenditure for the original miner, or another miner who preceded the original miner, in relation to the mining project interest; or

 (ii) is, or may become, a *starting base asset, in relation to the mining project interest.

 (2) Despite section 3040, no amount is included in the original miners *mining revenue for the mining project interest in relation to any part of the consideration for the transfer that relates to the transferred property.

 (3) For the new miner, any part of the consideration for the transfer that relates to the transferred property is taken, for the purposes of section 3535, to be expenditure relating to the acquisition of the mining project interest.

 (4) To avoid doubt, the *mining project split, and the transfer of the transferred property, is not an event or circumstance giving rise to an adjustment under Division 160.

Note: Events or circumstances happening after the split may give rise to an adjustment under Division 160, for instance if the new miner uses the transferred property in relation to the mining project interest to a greater or lesser extent than the original miner.

12525  Effect of MRRT liability from earlier years on rehabilitation tax offset amounts

  For the purposes of section 22515, only a proportion, worked out on a reasonable basis, of an *MRRT liability, of the original miner or any other miner, for the mining project interest for an *MRRT year before the year in which a *mining project split happens, is taken to have been paid in relation to a new interest.

Note: The original miner is required to give the new miner the information it needs to work out the amount of a rehabilitation tax offset: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

12530  Events happening after mining project split

 (1) A thing that happens at a time in relation to an *entity (the first entity) is taken instead to happen in relation to another entity, and to have the effect mentioned in paragraph (c) in relation to a mining project interest the other entity has, if:

 (a) the other entity has the interest at the time as a result of a *mining project split; and

 (b) the first entity had the interest at an earlier time; and

 (c) if the first entity still had the interest, the thing would affect the first entitys *MRRT liability, *allowance components or *rehabilitation tax offsets for the interest.

 (2) However, the extent to which the thing affects the other entitys *MRRT liability, *allowance components or *rehabilitation tax offsets is reduced to reflect:

 (a) if only one *mining project split happened in the period from when the first entity last had the interest until the time the thing happens—the *split percentage relating to that split; or

 (b) if 2 or more mining project splits or *premining project splits happened in the period—a percentage worked out by multiplying the split percentages for each of those splits.

Note 1: The first entity is required to advise the other entity about the thing that happens: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

Note 2: A mining project transfer or premining project transfer may also have happened in the period, but will not affect the extent worked out under subsection (2).

Example: After a mining project split happens, the original miner makes an initial supply of taxable resources that would have given rise to an amount of mining revenue for the miner if it still had the interest. Instead, each new miner is taken to have made the initial supply, and includes its split percentage of the amount in mining revenue for the interest.

12535  Start of mining venture taken to be mining project split

 (1) The start of a *mining venture that gives rise to a mining project interest under subsection 155(1) is taken to be a *mining project split of a mining project interest that existed, just before that start, under subsection 155(4) if:

 (a) the mining venture relates to some (but not all) of the *taxable resources to which the mining project interest under subsection 155(4) related; or

 (b) the mining venture relates to all of those resources, and more than one entity has a mining project interest in relation to the mining venture at the time it starts.

Example: VioletCo has a mining project interest under subsection 155(4) as a result of being granted a production right entitling it to extract iron ore from an area in which 2 bodies of ore have been identified.

 VioletCo and DiggerCo later start a mining venture, in which they both participate, to extract one of the bodies of ore. There is no mining venture in relation to the other body of ore.

 The start of this mining venture gives rise to mining project interests for VioletCo and DiggerCo under subsection 155(1). There is taken to be a mining project split of the mining project interest VioletCo had under subsection 155(4) after which there are 3 new interests: the 2 interests in the mining venture and VioletCo’s reduced residual interest under subsection 155(4). VioletCo is the original miner and both VioletCo and DiggerCo are the new miners.

 One effect of this is that each of the new interests is taken to be a continuation of the mining project interest VioletCo had under subsection 155(4) (the original interest).

 (2) To avoid doubt, the start of a *mining venture may be taken to be a *mining project split for more than one mining project interest, if the start of the mining venture has the effect mentioned in paragraph (1)(a) or (b) in relation to more than one mining project interest.

Division 130Winding down mining project interests

Guide to Division 130

1301  What this Division is about

From the suspension day for a mining project interest (a day primarily related to the ceasing of commercial production), allowance components are extinguished unless they can be applied in relation to the current year.

Table of sections

Operative provisions

1305 Object of this Division

13010 Suspension days for mining project interests

13015 Extinguishing allowance components

13020 Restarting commercial production

Operative provisions

1305  Object of this Division

  The object of this Division is to provide for the winding down of mining project interests, and to ensure that allowance components cannot be carried forward when a mining project interest is winding down.

13010  Suspension days for mining project interests

 (1) The suspension day for a mining project interest is the earliest of the following:

 (a) the day, occurring after the day on which commercial production of *taxable resources from the *project area for the mining project interest ceased, chosen by the miner who has the mining project interest;

 (b) the day occurring 10 years after the day on which commercial production of taxable resources from the project area for the mining project interest most recently took place;

 (c) the *termination day for the mining project interest.

 (2) A miner may choose the *suspension day for a mining project interest that the miner has if commercial production of *taxable resources from the *project area for the mining project interest has ceased.

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

 (3) Without limiting the matters that may be taken into account in determining, for the purposes of this section, whether commercial production of *taxable resources from the *project area takes place, the following are to be taken into account:

 (a) past and current production of taxable resources from the project area;

 (b) past and current expenditure relating to the *upstream mining operations for the mining project interest;

 (c) the extent to which mining equipment used in carrying on those upstream mining operations has been decommissioned.

 (4) The choice must be given to the Commissioner.

13015  Extinguishing allowance components

  If the *suspension day for a mining project interest happens in a particular *MRRT year (the suspension year), an *allowance component relating to the mining project interest:

 (a) is extinguished if it relates to the suspension year or an earlier MRRT year, except to the extent that it is applied in working out, for the suspension year, an *MRRT allowance for that mining project interest or any other mining project interest; and

 (b) is extinguished if it relates to a later MRRT year, except to the extent that it is applied in working out, for that later MRRT year, an MRRT allowance for that mining project interest or any other mining project interest.

Example: The suspension day for a mining project interest happens in the 201516 year. For that year, the mining profit for the mining project interest is $15 million, and there is a royalty credit of $5 million. From the previous year, the only allowance component is a mining loss that, in the 201516 year, is $12 million.

 The royalty credit is applied as a royalty allowance of $5 million to reduce the mining profit, and is not extinguished under this section.

 The mining loss from the previous year is applied as a mining loss allowance of $10 million, but the remaining $2 million of the mining loss is extinguished under this section (unless it can be used as a transferred mining loss allowance, relating to the suspension year, for another mining project interest).

13020  Restarting commercial production

 (1) If, after the *suspension day for a mining project interest happens, the miner that has the interest is carrying on *upstream mining operations for the interest with a view to restarting commercial production of *taxable resources from the *project area for the interest, for the purposes of the *MRRT law:

 (a) the interest (the original interest) is taken to cease to exist; and

 (b) a separate mining project interest relating to extraction of taxable resources from the project area is taken to come into existence at that time.

 (2) To avoid doubt, the original interest ceasing to exist and the separate mining project interest coming into existence do not constitute a *mining project transfer.

Division 135Ending mining project interests

Guide to Division 135

1351  What this Division is about

The last entity to have a particular mining project interest is treated, for the purpose of accounting for MRRT, as continuing to have the mining project interest after the termination day.

Table of sections

Operative provisions

1355 The termination day for a mining project interest

13510 The effect of renewing or changing production rights

13515 The effect of renewing or changing mining ventures

13520 The effect of mining project transfers and mining project splits

13525 Continuation of obligations etc. after the termination day

Operative provisions

1355  The termination day for a mining project interest

  The termination day for a mining project interest is the day on which there is no longer any entity that has the mining project interest.

Note 1: For when an entity has a mining project interest, see section 155.

Note 2: If the suspension day for the mining project interest has not already happened, the termination day will also be the suspension day under section 13010.

13510  The effect of renewing or changing production rights

 (1) A change in, or a renewal of, the *production right to which a mining project interest relates does not cause the *termination day for the mining project interest to happen.

 (2) However, if the change in, or the renewal of, the *production right would otherwise result in the mining project interest covering an additional area:

 (a) the *project area for the mining project interest does not include that additional area; and

 (b) to avoid doubt, the additional area is the project area for another mining project interest.

Note: The other mining project interest may be combined with the original mining project interest under Division 115.

13515  The effect of renewing or changing mining ventures

 (1) A change in, or a renewal of, a *mining venture to which a mining project interest relates does not cause the *termination day for the mining project interest to happen.

 (2) However, if the change in, or the renewal of, the *mining venture would otherwise result in the mining project interest covering an additional area:

 (a) the *project area for the mining project interest does not include that additional area; and

 (b) to avoid doubt, the additional area is the project area for another mining project interest.

Note: The other mining project interest may be combined with the original mining project interest under Division 115.

13520  The effect of mining project transfers and mining project splits

  A *mining project transfer or a *mining project split relating to a mining project interest does not cause the *termination day for the mining project interest to happen.

Note 1: Under subsection 12010(2), the mining project interest after a mining project transfer is a continuation of the mining project interest before the transfer.

Note 2: Under subsection 12510(2), the mining project interests after a mining project split are a continuation of the mining project interest before the split.

13525  Continuation of obligations etc. after the termination day

 (1) After the *termination day for a mining project interest, the last *entity to have had the mining project interest is taken, for the purposes of the *MRRT law, to continue to have the mining project interest:

 (a) for the whole of the remainder of the *MRRT year in which the termination day happens; and

 (b) for the whole of any later MRRT year.

 (2) If the *entity is not a miner during a period in which this section applies to the entity after the *termination day, this section applies as if the entity continues to be a miner during that period.

Part 42Premining project interests

Division 140Premining profits and royalty credits

Table of Subdivisions

 Guide to Division 140

140A Premining profits

140B Premining royalty credits

Guide to Division 140

1401  What this Division is about

If an entitys premining revenue for a premining project interest exceeds its premining expenditure, the excess is usually treated as a mining profit for a mining project interest.

Mining royalties can give rise to royalty credits for a premining project interest.

Subdivision 140APremining profits

Table of sections

1405 Premining profits

14010 Treatment of premining profits—general rule

14015 Effect on allowance components for other mining project interests

14020 Treatment of premining profits—mining project interest originating from the premining project interest

1405  Premining profits

 (1) A premining profit arises for an *MRRT year if:

 (a) during the year, an *entity *holds a *premining project interest; and

 (b) the entitys *premining revenue for the interest for the year exceeds the entitys *premining expenditure for the interest for the year.

 (2) In that year, the amount of the *premining profit is the amount of the excess.

14010  Treatment of premining profits—general rule

 (1) The *entity may be liable, under this section, to pay MRRT, for the *MRRT year, in relation to the *premining profit.

 (2) For the purpose only of working out the amount (if any) of that MRRT, the *MRRT law has effect as if:

 (a) the *premining project interest were, in the *MRRT year and any earlier MRRT years, a mining project interest that the *entity has; and

 (b) the *premining profit were a *mining profit for that mining project interest for the MRRT year; and

 (c) subsection 7020(1) is taken to be satisfied for the purpose of determining whether a *premining loss can be applied in working out a *premining loss allowance for that mining project interest for the MRRT year or any earlier MRRT year; and

 (d) no *mining loss or *starting base loss arises, or has arisen for that mining project interest for the MRRT year or any earlier MRRT year; and

 (e) that mining project interest were not *integrated with any other mining project interest; and

 (f) the *exploration right to which the premining project interest relates were a *production right; and

 (g) in a case where the entity is not a miner—the entity were, in the MRRT year and any earlier MRRT years, a miner.

Note 1: The following MRRT allowances could be available for the premining project interest:

(a) royalty allowances;

(b) premining loss allowances (but not for the current year, because the premining profit precludes a premining loss for the current MRRT year);

(c) transferred premining loss allowances;

(d) transferred mining loss allowances.

Note 2: Paragraph (2)(e) precludes the entity from having any transferred royalty allowances, and also precludes the premining project interest from being treated as combined with any mining project interest.

Example: An entity holds a premining project interest that, in the 201516 MRRT year has a premining profit of $50 million. It also has a royalty credit for the MRRT year of $5 million, based on royalties paid for resources the entity sold. The entity also holds another premining project interest that, in the MRRT year has a premining loss of $20 million.

 The premining profit is taken to be a mining profit of $50 million, but the entity has a royalty allowance of $5 million and a transferred premining loss allowance of $20 million. Under section 105, the entitys MRRT liability is:

 

 However, the amount the entity must pay is reduced to zero by the low profit offset under section 455.

14015  Effect on allowance components for other mining project interests

  If:

 (a) an entitys liability to pay MRRT in relation to a *premining project interest is worked out under section 14010; and

 (b) in working out the liability under that section, an *allowance component is wholly or partly applied in relation to the premining project interest as if it were a mining project interest;

the allowance component is taken, for the purposes of this Act, to be applied to the same extent in relation to a mining project interest.

14020  Treatment of premining profits—mining project interest originating from the premining project interest

  If the *entity has a mining project interest that *originates, during an *MRRT year, from a *premining project interest for which the entity has a *premining profit for the MRRT year:

 (a) the premining profit is included in the entitys *mining revenue of the mining project interest for the MRRT year; and

 (b) section 14010 does not apply.

Example: A miner holds a premining project interest that, in the 201516 MRRT year has a premining profit of $10 million. During the MRRT year, a mining project interest originates from the premining project interest. The mining revenue and mining expenditure for the mining project interest are $60 million and $100 million respectively.

 Under section 7520, the miners mining loss for the mining project interest for the MRRT year is:

 

Subdivision 140BPremining royalty credits

Table of sections

14025 Premining royalty credits

14025  Premining royalty credits

 (1) If an *entity that *held the *premining project interest at any time incurred a liability that would, to any extent, have given rise, under section 6020, to a *royalty credit if:

 (a) the premining project interest were a mining project interest that the entity had; and

 (b) the *exploration right to which the premining project interest relates were a *production right to which the mining project interest relates; and

 (c) in a case where the entity is not a miner—the entity were a miner;

treat the liability, to that extent, as giving rise to a royalty credit for the premining project interest.

 (2) Work out the amount of the *royalty credit under Division 60 as if:

 (a) the *premining project interest were a mining project interest that the *entity had; and

 (b) in a case where the entity is not a miner—the entity were a miner.

Note: Recoupment of amounts of premining royalty credits may give rise to an excess royalty recoupment mentioned in subsection 6030(2) that would be included in the entity’s premining revenue because of subsection 7040(2).

 (3) The *royalty credit arises at the time the *entity incurs the liability, and relates to the *MRRT year in which it arises.

 (4) To avoid doubt, a *royalty credit that arises for the *premining project interest for the *MRRT year cannot be applied in working out a *transferred royalty allowance for a mining project interest for any MRRT year.

Division 145Transferring premining project interests

Guide to Division 145

1451  What this Division is about

If a premining project interest is transferred, in most respects the new explorer takes over from the original explorer in relation to MRRT matters.

Table of sections

Operative provisions

1455 Object of this Division

14510 Continuation of premining project interest

14515 Effects of premining project transfer

14520 Effect of transferred property

14525 Events happening after premining project transfer

14530 Premining project transfer when mining project interest originates

Operative provisions

1455  Object of this Division

  The object of this Division is to ensure that, if a *premining project interest is transferred:

 (a) consistent with the MRRT being a projectbased tax, matters relevant to the MRRT that are connected with the interest before the transfer remain connected with the interest after the transfer; and

 (b) the *MRRT liability for the interest for the part of the *MRRT year before the transfer attaches to the explorer who has the interest after the transfer, and not to the explorer who had the interest before the transfer.

14510  Continuation of premining project interest

 (1) The *premining project interest (the new interest) that an *entity (the new explorer) *holds just after a *premining project transfer is taken to be a continuation of the premining project interest (the original interest) an entity (the original explorer) held just before the transfer.

Note: This means, for example, that:

(a) the premining project interest retains the history of when it started, and of the entities who have held the interest at various times; and

(b) a choice made, under Division 85, of the valuation approach for the premining project interest continues to have effect.

Meaning of premining project transfer

 (2) A premining project transfer happens if:

 (a) an *arrangement that has the effect of transferring the whole of the interest comprising a *premining project interest from one *entity to a single other entity comes into force; and

 (b) the premining project interest the other entity starts to *hold covers the same *project area.

14515  Effects of premining project transfer

Liability for MRRT moves with interest

 (1) Any MRRT that would otherwise be payable by the original explorer in relation to a *premining project interest, in relation to the part of the *MRRT year before a *premining project transfer happens (the pretransfer part year), is payable instead, in accordance with this Division:

 (a) by the new explorer; and

 (b) in the MRRT year for the new explorer in which the transfer happens.

Note 1: The MRRT liability for the new explorer for the premining project interest is worked out in accordance with this Division. It may be more, or less, than the liability the original explorer would have had, depending on circumstances such as choices, offsets and available allowances.

Note 2: For any period after the transfer that the new explorer has the interest, its liability for MRRT (if any) is worked out under the ordinary rules.

MRRT amounts move with interest

 (2) For the purposes of the application of the *MRRT law in the *MRRT year in which the transfer happens or a later MRRT year, each of the following amounts that, apart from this Division, would be an amount for the original explorer and the original interest is instead an amount for the new explorer and the new interest:

 (a) an amount included in *premining revenue for the pretransfer part year or an earlier MRRT year;

 (b) an amount included in *premining expenditure for the pretransfer part year or an earlier MRRT year;

 (c) an amount of a *royalty credit arising for the original interest in the pretransfer part year;

 (d) an amount of an *allowance component arising in an earlier MRRT year;

 (e) if the transfer happens because of the operation of section 14530—the amount of the *premining loss cap (if any) for the original interest.

Note 1: Under section 14530, a mining project interest originating from a premining project interest may be taken to be a premining project transfer.

Note 2: If the original explorer’s MRRT year starts before the new explorer’s MRRT year, the effect of this provision is that amounts from before the start of the new explorer’s MRRT year are taken into account for the new explorer in the new explorer’s MRRT year.

Example: The original explorer has a substituted accounting period of 12 months from 1 April to 31 March. The new explorer has an MRRT year of 1 July to 30 June. The transfer happens on 1 July. The amounts covered by subsection (2) are all amounts that would be amounts for the original explorer for the period from 1 April to 30 June, so these will be amounts for the new explorer for its MRRT year 1 July to 30 June.

Choices to use the simplified MRRT method

 (3) Despite subsection (2), in working out under that subsection an amount for the *MRRT year in which the transfer happens or a later MRRT year:

 (a) a choice under Division 200 to use the simplified MRRT method for that year made by the new explorer is taken into account; but

 (b) a choice of that kind made by the original explorer is disregarded.

Note: The effect of a simplified MRRT method choice made for a year before the transfer year is not affected: all allowance components are extinguished (see Division 200).

Example: An original explorer had made no choices in the MRRT year in which a premining project transfer happens. The new explorer chooses to use the simplified MRRT method.

 The new explorers MRRT liability for the premining project interest (and all other interests it has) is zero.

14520  Effect of transferred property

 (1) This section applies if:

 (a) any property, or any legal or equitable right that is not property, (the transferred property) is transferred to the new explorer under the *premining project transfer; and

 (b) the original explorer used the transferred property in *premining project operations for the *premining project interest; and

 (c) the transferred property:

 (i) gave rise to an amount of *premining expenditure for the original explorer, or another explorer who preceded the original explorer, in relation to the premining project interest; or

 (ii) is, or may become, a *starting base asset, in relation to a mining project interest that *originates from the premining project interest.

 (2) Despite sections 3040 and 7040, no amount is included in the original explorers *premining revenue for the *premining project interest in relation to any part of the consideration for the transfer that relates to the transferred property.

 (3) For the new explorer, any part of the consideration for the transfer that relates to the transferred property is taken, for the purposes of sections 3535 and 7035, to be expenditure relating to the acquisition of the premining project interest.

 (4) To avoid doubt, the *premining project transfer, and the transfer of the transferred property, is not an event or circumstance giving rise to an adjustment under Division 160.

Note: Events or circumstances happening after the transfer may give rise to adjustment under Division 160, for instance if the new explorer uses the transferred property in relation to the premining project interest to a greater or lesser extent than the original explorer.

14525  Events happening after premining project transfer

 (1) A thing that happens at a particular time in relation to an *entity (the first entity) is taken instead to happen in relation to another entity, and to have the effect mentioned in paragraph (c) in relation to a *premining project interest the other entity *holds, if:

 (a) the other entity holds the interest at the time as a result of one or more *premining project transfers; and

 (b) the first entity held the interest at an earlier time; and

 (c) if the first entity still held the interest, the thing would affect any of the following amounts (premining amounts) for the first entity:

 (i) *premining revenue;

 (ii) *premining expenditure;

 (iii) an *allowance component;

 (iv) a *rehabilitation tax offset.

 (2) However, if one or more *premining project splits has happened in relation to the *premining project interest in the period from when the first *entity last *held the interest until the time the thing happens:

 (a) the thing is taken to happen in relation to the other entity in relation to the interest; but

 (b) the extent to which the thing affects the other entitys premining amounts is reduced to reflect:

 (i) if only one premining project split happened in the period—the *split percentage relating to that split; or

 (ii) if 2 or more premining project splits happened in the period—a percentage worked out by multiplying the split percentages for each of those splits.

Note: The first entity is required to advise the other entity about the thing that happens: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

Example: After a premining project transfer happens, the original explorer makes an initial supply of taxable resources that would have given rise to an amount of premining revenue for the explorer if it still held the interest. Instead, the new explorer is taken to have made the initial supply, and includes the amount in premining revenue for the interest.

14530  Premining project transfer when mining project interest originates

 (1) If a single mining project interest *originates from a *premining project interest and relates to the whole of the *project area for the premining project interest:

 (a) the origination is taken to be a *premining project transfer; and

 (b) for the purposes of paragraph (a), the *MRRT law applies:

 (i) in the same way in relation to the mining project interest as it applies in relation to a premining project interest that exists after a premining project transfer; and

 (ii) in the same way in relation to the miner that has the mining project interest just after it so originates as it applies in relation to an *entity that *holds a premining project interest after a premining project transfer.

 (2) In applying this Division for the purposes of subsection (1), disregard subsection 14515(3).

 (3) If, because of the application of this Division, a mining project interest has, for the part of the *MRRT year before it *originates from a *premining project interest:

 (a) *premining revenue that exceeds *premining expenditure—the excess is treated as *premining profit of the premining project interest for the MRRT year; or

 (b) premining expenditure that exceeds premining revenue—the excess is treated as a *premining loss of the premining project interest for the MRRT year.

Note: For the treatment of premining profits, see section 14020. For the treatment of premining losses, see Divisions 70 and 95.

Division 150Splitting premining project interests

1501  Guide to Division 150

If a premining project interest is split, in most respects the new explorers take over from the original explorer in relation to MRRT matters, each to an extent appropriate to their share in the split.

Table of sections

Operative provisions

1505 Object of this Division

15010 Continuation of premining project interest

15015 Effects of premining project split

15020 Effect of transferred property

15025 Effect of MRRT liability from earlier years on rehabilitation tax offset amounts

15030 Events happening after premining project split

15035 Premining project split when mining project interest originates

Operative provisions

1505  Object of this Division

  The object of this Division is to ensure that, if a *premining project interest is split:

 (a) consistent with the MRRT being a projectbased tax, matters relevant to the MRRT that are connected with the interest before the split remain connected (to the appropriate extents) with the split interests after the split; and

 (b) the *MRRT liability for the interest for the part of the *MRRT year before the split attaches (to the appropriate extents) to the explorers who have the split interests after the split.

15010  Continuation of premining project interest

 (1) Each *premining project interest (a new interest) that an *entity (a new explorer) *holds just after a *premining project split is taken to be a continuation of the premining project interest (the original interest) an entity (the original explorer) held just before the split.

Note: This means, for example, that:

(a) each split interest retains the history of when the premining project interest started, and of the entities who have held the interest at various times; and

(b) a choice made, under Division 85, of the valuation approach for the premining project interest continues to have effect.

Meaning of premining project split

 (2) A premining project split happens if:

 (a) an *arrangement comes into force that has the effect of transferring, from one *entity to 2 or more other entities, the whole of a *premining project interest; or

 (b) an arrangement comes into force that has the effect of transferring, from one entity to one or more other entities, a part of a premining project interest; or

 (c) under an *Australian law, the *exploration right to which a premining project interest relates is split into 2 or more exploration rights.

Note: A new explorer may be the same entity as the original explorer, in the situations described in paragraphs (b) and (c).

15015  Effects of premining project split

Liability for MRRT moves with interest

 (1) Any MRRT that would otherwise be payable by the original explorer in relation to a *premining project interest in relation to the part of the *MRRT year before a *premining project split happens (the presplit part year) is payable instead, in accordance with this Division:

 (a) by each new explorer; and

 (b) in the MRRT year for a new explorer in which the split happens.

Note 1: The MRRT liability for each split interest is worked out in accordance with this Division. The sum total of those liabilities may be more, or less, than the liability the original explorer would have had, depending on circumstances such as choices, offsets and available allowances.

Note 2: For any period after the split that a new explorer has the interest, its liability for MRRT (if any) is worked out under the ordinary rules.

MRRT amounts move with interest

 (2) For the purposes of the application of the *MRRT law in the *MRRT year in which the split happens or a later MRRT year, each of the following amounts that, apart from this Division, would be an amount for the original explorer and the original interest is instead, to the extent of a new interest’s *split percentage, an amount for the new explorer and the new interest:

 (a) an amount included in *premining revenue for the presplit part year or an earlier MRRT year;

 (b) an amount included in *premining expenditure for the presplit part year or an earlier MRRT year;

 (c) an amount of a *royalty credit arising for the original interest in the presplit part year;

 (d) an amount of an *allowance component for an earlier MRRT year;

 (e) if the new explorer is the same *entity as the original explorer—the amount of the *premining loss cap (if any) for the original interest.

Note: If the new explorer is not the same entity as the original explorer, a new premining loss cap arises for the new interest under section 9530.

Choices to use the simplified MRRT method

 (3) Despite subsection (2), in working out under that subsection an amount for the *MRRT year in which the split happens or a later MRRT year:

 (a) a choice under Division 200 to use the simplified MRRT method for that year made by the new explorer is taken into account; but

 (b) a choice of that kind made by the original explorer is disregarded.

Note 1: The effect of a simplified MRRT method choice made for a year before the split year is not affected: all allowance components are extinguished (see Division 200).

Note 2: If the original explorers MRRT year starts before the new explorers MRRT year, the effect of this provision is that, in working out amounts under subsection (2), a choice made by the new explorer for the new explorers MRRT year affects amounts from before the start of that MRRT year.

Exception for new explorer that is the same entity as original explorer

 (4) If a new explorer in relation to a *premining project split is the same entity as the original explorer, a choice that would otherwise be disregarded under subsection (3) in working out an amount for that new explorer is not disregarded.

Note: This subsection does not affect the operation of subsection (3) for a new explorer that is not the original explorer.

Meaning of split percentage

 (5) The split percentage for a new interest an *entity *holds just after a *premining project split is the percentage that best reflects a reasonable approximation of the *market value of the new interest, expressed as a percentage of the sum of the market values of all the new interests arising from the split.

 (6) The *market values mentioned in subsection (5) are those values just after the *premining project split to which the new interest relates.

 (7) To avoid doubt, the sum of the *split percentages for the new interests must equal 100%.

15020  Effect of transferred property

 (1) This section applies if:

 (a) any property, or any legal or equitable right that is not property, (the transferred property) is transferred to a new explorer under the *premining project split; and

 (b) the original explorer used the transferred property in *premining project operations for the *premining project interest; and

 (c) the transferred property:

 (i) gave rise to an amount of *premining expenditure for the original explorer, or another explorer who preceded the original explorer, in relation to the premining project interest; or

 (ii) is, or may become, a *starting base asset, in relation to a mining project interest that *originates from the premining project interest.

 (2) Despite sections 3040 and 7040, no amount is included in the original explorers *premining revenue for the *premining project interest in relation to any part of the consideration for the transfer that relates to the transferred property.

 (3) For the new explorer, any part of the consideration for the transfer that relates to the transferred property is taken, for the purposes of sections 3535 and 7035, to be expenditure relating to the acquisition of the *premining project interest.

 (4) To avoid doubt, the *premining project split, and the transfer of the transferred property, is not an event or circumstance giving rise to an adjustment under Division 160.

Note: Events or circumstances happening after the split may give rise to adjustment under Division 160, for instance if the new explorer uses the transferred property in relation to the premining project interest to a greater or lesser extent than the original explorer.

15025  Effect of MRRT liability from earlier years on rehabilitation tax offset amounts

  For the purposes of section 22520, only a proportion, worked out on a reasonable basis, of an *MRRT liability, of the original explorer or any other *entity, for the *premining project interest for an *MRRT year before the year in which a *premining project split happens, is taken to have been paid in relation to a new interest.

Note: The original explorer is required to give the new explorer the information it needs to work out the amount of a rehabilitation offset: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

15030  Events happening after premining project split

 (1) A thing that happens at a time in relation to an *entity (the first entity) is taken instead to happen in relation to another entity, and to have the effect mentioned in paragraph (c) in relation to a *premining project interest the other entity *holds, if:

 (a) the other entity holds the interest at the time as a result of one or more *premining project splits; and

 (b) the first entity held the interest at an earlier time; and

 (c) if the first entity still held the interest, the thing would affect any of the following amounts (premining amounts) for the first entity:

 (i) *premining revenue;

 (ii) *premining expenditure;

 (iii) an *allowance component;

 (iv) a *rehabilitation tax offset.

 (2) However, the extent to which the thing affects the other entitys premining amounts is reduced to reflect:

 (a) if only one *premining project split happened in the period from when the first entity last *held the interest until the time the thing happens—the *split percentage relating to that split; or

 (b) if 2 or more premining project splits happened in the period—a percentage worked out by multiplying the split percentages for each of those splits.

Note 1: The first entity is required to advise the other entity about the thing that happens: see Division 121 in Schedule 1 to the Taxation Administration Act 1953.

Note 2: A premining project transfer may also have happened in the period, but will not affect the extent worked out under subsection (2).

Example: After a premining project split happens, the original explorer makes an initial supply of taxable resources that would have given rise to an amount of premining revenue for the explorer if it still held the interest. Instead, each new explorer is taken to have made the initial supply, and includes its split percentage of the amount in premining revenue for the interest.

15035  Premining project split when mining project interest originates

 (1) If, just after a mining project interest *originates from a *premining project interest, there are 2 or more interests (whether mining project interests or premining project interests) (the new interests) relating to the *project area for the premining project interest:

 (a) the origination is taken to be a *premining project split; and

 (b) for the purposes of paragraph (a), the *MRRT law applies:

 (i) in the same way in relation to each new interest (whether it is a premining project interest or a mining project interest) as it applies in relation to a premining project interest that exists after a premining project split; and

 (ii) in the same way in relation to each *entity that *holds a new interest as it applies in relation to an entity that holds a premining project interest after a premining project split.

 (2) If, because of the application of this Division, a mining project interest has, for the part of the *MRRT year before it *originates from a *premining project interest:

 (a) *premining revenue that exceeds *premining expenditure—the excess is treated as *premining profit of the premining project interest for the MRRT year; or

 (b) premining expenditure that exceeds premining revenue—the excess is treated as a *premining loss of the premining project interest for the MRRT year.

Note: For the treatment of premining profits, see section 14020. For the treatment of premining losses, see Divisions 70 and 95.

Division 155Ending premining project interests

Guide to Division 155

1551  What this Division is about

The last entity to have a particular premining project interest is treated, for the purpose of accounting for MRRT, as continuing to have the premining project interest after the termination day.

Table of sections

Operative provisions

1555 The termination day for a premining project interest

15510 The effect of renewing or changing exploration rights

15515 The effect of premining project transfers and premining project splits

15520 Continuation of obligations etc. after the termination day

15525 Extinguishing allowance components

Operative provisions

1555  The termination day for a premining project interest

  The termination day for a *premining project interest is the day on which there is no longer any *entity that *holds the premining project interest.

Note: For when an entity holds a premining project interest, see Division 250.

15510  The effect of renewing or changing exploration rights

 (1) A change in, or a renewal of, the *exploration right to which a *premining project interest relates does not cause the *termination day for the premining project interest to happen.

 (2) However, if the change in, or the renewal of, the *exploration right results in the exploration right covering an additional area:

 (a) the *project area for the *premining project interest does not include that additional area, unless the additional area is insignificant; and

 (b) to avoid doubt, the additional area is the project area for another premining project interest, unless the additional area is insignificant.

 (3) In determining, for the purposes of subsection (2), whether an additional area is insignificant, assume that the additional area includes any other such additional areas that have been included in the *project area for the *premining project interest because of a previous application of that subsection.

15515  The effect of premining project transfers and premining project splits

  A *premining project transfer or a *premining project split relating to a *premining project interest does not cause the *termination day for the premining project interest to happen.

Note 1: Under section 14510, the premining project interest after a premining project transfer is a continuation of the premining project interest before the transfer.

Note 2: Under section 15010, the premining project interests after a premining project split are a continuation of the premining project interest before the split.

15520  Continuation of obligations etc. after the termination day

 (1) After the *termination day for a *premining project interest, the last *entity to have *held the premining project interest is taken, for the purposes of the *MRRT law, to continue to hold the premining project interest:

 (a) for the whole of the remainder of the *MRRT year in which the termination day happens; and

 (b) for the whole of any later MRRT year.

 (2) This section does not apply if the *termination day happens because a mining project interest *originates from the *premining project interest.

15525  Extinguishing allowance components

 (1) If the *termination day for a *premining project interest happens in a particular *MRRT year, an *allowance component relating to the premining project interest:

 (a) is extinguished if it relates to that MRRT year or an earlier MRRT year, except to the extent that it is applied in working out, for that MRRT year:

 (i) in relation to the premining project interest, an amount, for the purposes of section 14010, corresponding to an *MRRT allowance; or

 (ii) an MRRT allowance for any mining project interest; and

 (b) is extinguished if it relates to a later MRRT year, except to the extent that it is applied in working out, for that later MRRT year:

 (i) in relation to the premining project interest, an amount, for the purposes of section 14010, corresponding to an *MRRT allowance; or

 (ii) an MRRT allowance for any mining project interest.

 (2) This section does not apply if the *termination day happens because a mining project interest *originates from the *premining project interest.

Part 43Adjusting MRRT liabilities

Division 160Adjustments to revenue and expenditure of project interests

Guide to Division 160

1601  What this Division is about

If there is a change in the circumstances affecting the amount of a previous item of mining revenue, mining expenditure, premining revenue or premining expenditure, an adjustment may be made so that, in net terms, the correct result is achieved.

Table of sections

Operative provisions

1605 Object of this Division

16010 Mining adjustments

16015 Effect of mining adjustments on mining revenue, mining expenditure etc.

Operative provisions

1605  Object of this Division

  The object of this Division is to ensure that an appropriate adjustment is made to:

 (a) *mining revenue or *mining expenditure if there is a change in the circumstances determining the amount of a previous item of mining revenue or mining expenditure for a mining project interest; or

 (b) *premining revenue or *premining expenditure if there is a change in the circumstances determining the amount of a previous item of premining revenue or premining expenditure for a *premining project interest.

16010  Mining adjustments

 (1) An event or circumstance gives rise to an adjustment under this Division (a mining adjustment) for the *MRRT year in which the event or circumstance happens if:

 (a) due to assumptions or estimates that were made, the event or circumstance was not taken into account in relation to the inclusion (or noninclusion) of an amount (the original amount) in:

 (i) *mining revenue or *mining expenditure for a mining project interest; or

 (ii) *premining revenue or *premining expenditure for a *premining project interest; and

 (b) it becomes more likely than not that those assumptions or estimates are incorrect; and

 (c) taking the event or circumstance into account, as if they formed part of the circumstances that gave rise to the original amount, would have led to a different result in relation to the original amount.

Note: Subsection 16015(3) modifies the application of this section if a previous adjustment has been made under this Division in relation to the original amount.

 (2) The amount of the mining adjustment is the amount of that difference.

 (3) Without limiting subsection (1), the event or circumstance may be:

 (a) a change in the extent to which an asset is used for a particular purpose; or

 (b) the whole or part of a debt being written off as bad, or the whole or part of an amount written off as bad being recovered.

 (4) Without limiting subsection (1), the amount of the mining adjustment may be greater than the original amount.

Example: An original amount of $48 million is included in a miners mining expenditure for an MRRT year. If, taking into account a circumstance or event that happens in a later MRRT year, the original amount would have instead been an amount of $12 million included in the miners mining revenue for the MRRT year, the difference is $60 million.

16015  Effect of mining adjustments on mining revenue, mining expenditure etc.

 (1) The table has effect for the *MRRT year in which the mining adjustment arises:

 

Effect of mining adjustments

Item

Column 1

If the original amount was an amount included (or not included) in:

Column 2

... and if the circumstance or event was taken into account in working out the original amount, it would:

Column 3

The mining adjustment is included in:

1

*mining revenue for a mining project interest

increase

mining revenue for that interest

2

*mining revenue for a mining project interest

decrease

*mining expenditure for that interest

3

*mining expenditure for a mining project interest

increase

mining expenditure for that interest

4

*mining expenditure for a mining project interest

decrease

*mining revenue for that interest

5

*premining revenue for a *premining project interest

increase

premining revenue for that interest

6

*premining revenue for a *premining project interest

decrease

*premining expenditure for that interest

7

*premining expenditure for a *premining project interest

increase

premining expenditure for that interest

8

*premining expenditure for a *premining project interest

decrease

*premining revenue for that interest

Example 1: In MRRT year 1, a miner incurs expenditure of $100 million on some machinery that the miner expects to use to the extent of 40% in the upstream mining operations of a mining project interest for each of 5 years, after which the machinery will be sold. On this basis, $40 million is included in the miners mining expenditure for the mining project interest for MRRT year 1.

 In MRRT year 2, the miners use of the machinery in those operations increases to 50%, and the miner expects that extent of use to continue for the rest of the 5 years. As a result, the extent to which the expenditure relates to the interest increases to 48%. Accordingly, a further $8 million is included in the miners mining expenditure for the interest for MRRT year 2.

Example 2: In MRRT year 1, the miner incurs expenditure of $100 million on some machinery, which the miner expects to use for 4 years, but does not expect to use to any extent in the upstream mining operations of a mining project interest. Therefore, none of the expenditure is included in the miners mining expenditure for the mining project interest for MRRT year 1.

 In MRRT year 3, the miner starts to use the machinery to the extent of 10% in those operations, and expects that extent of use to continue until the end of 4 years. As a result, an amount of $5 million is included in the miners mining expenditure for the mining project interest for MRRT year 3: 10% × 2/4 × $100 million.

 (2) However, for the purposes of items 5, 6, 7 and 8 of the table, if a mining project interest that *originates from the *premining project interest exists, the mining adjustment is instead included:

 (a) in the circumstances specified in item 5 or 8 of the table—in the *mining revenue of the mining project interest; or

 (b) in the circumstances specified in item 6 or 7 of the table—in the *mining expenditure of the mining project interest.

 (3) If this Division has given rise to a mining adjustment in relation to the original amount then, in working out whether a later event or circumstance gives rise to an adjustment under this Division in relation to the original amount, this Division has effect as if:

 (a) the adjustment mentioned in column 3 of the table in subsection (1) had not been made; and

 (b) the original amount had instead been increased or decreased (as the case requires) as mentioned in column 2 of that table by the amount of the adjustment.

 (4) If, apart from this subsection, the original amount:

 (a) would be included in the *mining revenue or *mining expenditure for a mining project interest, or in the *premining revenue or *premining expenditure for a *premining project interest; and

 (b) under paragraph (3)(b), would be a negative amount;

the original amount is instead taken to be a positive amount included in the mining expenditure or mining revenue of the mining project interest, or in the premining expenditure or premining revenue of the premining project interest, as the case requires.

 (5) If this Division has given rise to a mining adjustment in relation to an original amount of *mining expenditure to which subsection 3040(2) applies, that subsection has effect as if:

 (a) the adjustment mentioned in column 3 of the table in subsection (1) of this section had not been made; and

 (b) the original amount had instead been increased or decreased (as the case requires) as mentioned in column 2 of that table by the amount of the adjustment.

 (6) If this Division has given rise to a mining adjustment in relation to an original amount of *premining expenditure to which paragraph 7040(2)(b) applies, and to which subsection 3040(2) would have applied if the premining expenditure had been mining expenditure for a mining project interest, that paragraph has effect as if:

 (a) the adjustment mentioned in column 3 of the table in subsection (1) of this section had not been made; and

 (b) the original amount had instead been increased or decreased (as the case requires) as mentioned in column 2 of that table by the amount of the adjustment.

Division 165Starting base adjustments

Table of Subdivisions

 Guide to Division 165

165A Starting base adjustment events and starting base adjustment amounts

165B General rules for starting base adjustments

165C Partial disposal of starting base assets

165D Miscellaneous

Guide to Division 165

1651  What this Division is about

If a starting base asset ceases to be part of a miners starting base (for example, because the miner disposes of it), there may be a need to reconcile declines in value of the asset (reflected in starting base losses) with the actual change in value of the asset.

The appropriate starting base loss is adjusted to achieve this reconciliation. However, in some cases an additional amount will be included in a miners mining revenue.

Subdivision 165AStarting base adjustment events and starting base adjustment amounts

Table of sections

1655 Starting base adjustment events

16510 Starting base adjustment amounts

16515 Reductions in declines in value of starting base assets

1655  Starting base adjustment events

 (1) A starting base adjustment event happens for a *starting base asset relating to a mining project interest that a miner has if:

 (a) the miner ceases to *hold the asset; or

 (b) the miner:

 (i) stops using it, having it *installed ready for use or constructing it for use, in carrying on *upstream mining operations relating to the mining project interest; and

 (ii) expects never to use it, never to have it installed ready for use or never to restart constructing it for use, again in carrying on upstream mining operations relating to the mining project interest; or

 (c) the miner:

 (i) has not so used it; and

 (ii) decides never so to use it; and

 (iii) if it has been so installed—stops having it so installed; and

 (iv) if it is being so constructed for use—stops so constructing it;

  in carrying on upstream mining operations relating to the mining project interest.

 (2) However, a starting base adjustment event does not happen for a *starting base asset that:

 (a) is, or includes, the rights and interests constituting the mining project interest; or

 (b) is an asset that the miner transfers to another entity together with such rights and interests.

16510  Starting base adjustment amounts

Termination value exceeding adjustable value

 (1) If:

 (a) during an *MRRT year, a *starting base adjustment event happens for a *starting base asset relating to a mining project interest; and

 (b) the *termination value of the asset exceeds its *adjustable value just before the event happened;

there is a starting base adjustment amount, for the asset for the MRRT year, equal to the difference between the termination value and the adjustable value.

Note: A starting base adjustment amount under this subsection can be reduced under section 16515.

Termination value less than adjustable value

 (2) If:

 (a) during an *MRRT year, a *starting base adjustment event happens for a *starting base asset relating to a mining project interest; and

 (b) the *termination value of the asset is less than its *adjustable value just before the event happened;

there is a starting base adjustment amount, for the asset for the MRRT year, equal to the difference between the adjustable value and the termination value.

Note: A starting base adjustment amount under this subsection can be reduced under section 16515.

Termination value

 (3) The termination value of a *starting base asset for which a *starting base adjustment event has happened is:

 (a) if the miner to whose mining project interest the asset relates has received, because of the event, an amount for the asset under a transaction entered into at *arms length—that amount; or

 (b) otherwise—the *market value of the asset at the time the starting base adjustment event happened.

 (4) However, the termination value of the asset is the sum of the following, if that sum is greater than its termination value under subsection (3):

 (a) any *mining expenditure the miner incurs because of the *starting base adjustment event;

 (b) any amounts by which such expenditure would have been greater but for one or more amounts that are received, or become receivable, by the miner.

 (5) If all or part of a liability of the miner to pay an amount relating to the asset is terminated, the amount of the liability or part when it is terminated is taken, for the purposes of this section, to be received or to become receivable by the miner in relation to the asset.

 (6) If a miner receives an amount for 2 or more things that include a *starting base adjustment event happening for a *starting base asset, take into account as its *termination value only that part of what the miner received that is reasonably attributable to the asset.

Adjustable value

 (7) The adjustable value of a *starting base asset for which a *starting base adjustment event has happened is the difference between:

 (a) the *base value of the asset for the *MRRT year in which the event happened; and

 (b) an amount equal to what would be the decline in value of the asset, worked out under section 905, during the period starting at the start of that year and ending on the day on which the event happened, if that period were an MRRT year.

16515  Reductions in declines in value of starting base assets

 (1) If there is a *starting base adjustment amount, for a *starting base asset for an *MRRT year, and:

 (a) an amount of a *starting base loss for that MRRT year or any earlier MRRT year has been reduced because of a reduction under subsection 8040(3) or (4) relating to the asset; or

 (b) there have been reductions to a starting base loss relating to the asset, for that MRRT year or an earlier MRRT year, because of paragraph 11515(2)(b); or

 (c) there has been no starting base loss for that MRRT year, or no starting base loss for an earlier MRRT year, for the mining project interest to which the asset relates, because of paragraph 11515(2)(a), 13015(a) or (b) or 2005(b) or (c);

reduce the starting base adjustment amount in accordance with subsection (2).

Note 1: Reductions happen under subsection 8040(3) or (4) if the asset is used, installed for use, or constructed for use:

(a) for a purpose other than carrying on upstream mining operations relating to the mining project interest; or

(b) in connection with excluded expenditure.

Note 2: Starting base losses are reduced under paragraph 11515(2)(b) if a miner chooses to treat a mining project interest as having combined with another despite noncompliance with section 11535.

Note 3: Starting base losses are extinguished, or prevented from arising, if:

(a) under paragraph 11515(2)(a), a miner chooses to treat a mining project interest as having combined with another despite noncompliance with section 11535; or

(b) under paragraph 13015(a) or (b), the suspension day for the mining project interest happens; or

(c) under paragraph 2005(b) or (c), a miner chooses to use the simplified MRRT method.

 (2) The reduction is:

  

where:

sum of reductions is the sum of:

 (a) any reductions to a *starting base loss relating to the *starting base asset, for that *MRRT year or an earlier MRRT year, under subsection 8040(3) or (4); and

 (b) any reductions to a starting base loss relating to the asset, for that MRRT year or an earlier MRRT year, under paragraph 11515(2)(b); and

 (c) any starting base losses, for that MRRT year or an earlier MRRT year, that paragraph 11515(2)(a), 13015(a) or (b) or 2005(b) extinguished, or paragraph 2005(c) prevented from arising, to the extent that they related (or would have related) to the asset.

total decline is the sum of the declines in value of the asset that have happened during that *MRRT year or any earlier MRRT year.

Subdivision 165BGeneral rules for starting base adjustments

Table of sections

16520 Starting base adjustments

16525 The effect of starting base adjustments on starting base losses

16530 The effect of negative starting base adjustments on mining revenue

16520  Starting base adjustments

 (1) If there is, for an *MRRT year, at least one *starting base adjustment amount for a *starting base asset relating to a mining project interest, the starting base adjustment for the mining project interest for the MRRT year is the amount obtained by subtracting:

 (a) all of those starting base adjustment amounts (if any) arising under subsection 16510(1); from

 (b) all of those starting base adjustment amounts (if any) arising under subsection 16510(2).

 (2) The *starting base adjustment may be a negative amount, but there is no starting base adjustment if the amount worked out under subsection (1) is zero.

16525  The effect of starting base adjustments on starting base losses

Positive starting base adjustments

 (1) If:

 (a) there is a *starting base adjustment, for a mining project interest for an *MRRT year, that is a positive amount; and

 (b) there is a *starting base loss for the mining project interest for the MRRT year;

the starting base loss is increased by the starting base adjustment.

 (2) If:

 (a) there is a *starting base adjustment, for a mining project interest for an *MRRT year, that is a positive amount; and

 (b) there is (apart from this subsection) no *starting base loss for the mining project interest for the MRRT year;

there is taken to be such a starting base loss equal to the starting base adjustment.

Negative starting base adjustments

 (3) If:

 (a) there is a *starting base adjustment, for a mining project interest for an *MRRT year, that is a negative amount; and

 (b) there are one or more *starting base losses for the mining project interest;

the starting base loss, or one or more of the starting base losses, are reduced by the starting base adjustment (expressed as a positive amount).

 (4) If there is more than one *starting base loss, the starting base adjustment is applied to reduce the starting base losses in the order in which they arose.

Note: The amount by which that starting base adjustment exceeds all the starting base losses is included in mining revenue under subsection 16530(2).

16530  The effect of negative starting base adjustments on mining revenue

 (1) If:

 (a) there is a *starting base adjustment, for a mining project interest for an *MRRT year, that is a negative amount; and

 (b) there are no *starting base losses for the mining project interest;

the starting base adjustment (expressed as a positive amount) is included in the *mining revenue, for the mining project interest for the MRRT year, of the miner that has the mining project interest.

 (2) If:

 (a) there is a *starting base adjustment, for a mining project interest for an *MRRT year, that is a negative amount; and

 (b) there are one or more *starting base losses for the mining project interest; and

 (c) the starting base adjustment (expressed as a positive amount) is greater than the sum of those starting base losses;

an amount equal to the difference between the starting base adjustment (expressed as a positive amount) and the sum of those starting base losses is included in the *mining revenue, for the mining project interest for the MRRT year, of the miner that has the mining project interest.

Subdivision 165CPartial disposal of starting base assets

Table of sections

16535 Starting base adjustments for partial disposal of starting base assets

16540 Declines in value of retained parts of starting base assets

16545 Reductions in starting base losses

16550 Base value for the next MRRT year

16535  Starting base adjustments for partial disposal of starting base assets

 (1) If:

 (a) during an *MRRT year, a miner ceases to *hold a part of a *starting base asset relating to a mining project interest that a miner has; and

 (b) the cessation would be a *starting base adjustment event if the part were a starting base asset;

apply this Division as if that part were a starting base asset (the disposed asset) and as if the cessation were a starting base adjustment event for the disposed asset.

 (2) The adjustable value of the disposed asset is a reasonable proportion of what would be the adjustable value of the *starting base asset of which it is a part, if a *starting base adjustment event were to happen for that starting base asset at the time of the cessation.

Example: A miner holds a truck that, at the start of a particular MRRT year, has a base value of $10 million and a remaining effective life of 10 years. Halfway through the MRRT year, the miner sells a 75% interest in the truck for $6 million.

 At the time of the sale, the adjustable value of the entire truck is $9.5 million, so the adjustable value of the disposed asset is $7.125 million (75% of $9.5 million). The termination value of the disposed asset is $6 million.

 Under subsection 16510(2), the miner has a starting base adjustment amount for the truck of $1.125 million ($7.125 million $6 million).

 (3) Despite subsection (1), this section does not apply to the disposed asset if at the same time as the miner ceases to *hold the disposed asset, the miner also ceases to hold the remainder of the *starting base asset.

16540  Declines in value of retained parts of starting base assets

 (1) The decline in value of a *starting base asset during an *MRRT year (an entire MRRT year) in which section 16535 applies in relation to a miner ceasing to *hold a part of the starting base asset is worked out by:

 (a) working out under section 905 the decline in value of the asset, as if the part of the MRRT year before the cessation were an MRRT year; and

 (b) working out under section 905 the decline in value of the asset, as if the part of the MRRT year after the cessation were another MRRT year; and

 (c) summing the result.

Example: Using the example in subsection 16535(2), the decline in value of the truck during the MRRT year is $625,000, being the sum of:

(a) for the half of the MRRT year that precedes the cessation, a decline in value of $500,000 ($10 million x 1/2 x 1/10); and

(b) for the remainder of the MRRT year, a decline in value of $125,000 (($9.5 million $7.125 million) x 1/2 x 1/9.5).

 (2) In working out, under paragraph (1)(b), the decline in value of a *starting base asset after a cessation, the *base value of the starting base asset:

 (a) is worked out:

 (i) as if the part of the *MRRT year that is taken by paragraph (1)(a) to be an MRRT year were the preceding MRRT year; and

 (ii) if the base value is worked out under section 9030—as if the uplift factor mentioned in that section were 1; and

 (b) is reduced by the *adjustable value of the disposed asset for that cessation.

 (3) If:

 (a) section 16535 applies in relation to a miner ceasing to *hold a part of a *starting base asset; and

 (b) that cessation happens during a part of an *MRRT year that, because of a previous application of this section (including an application affected by this subsection) in relation to the same starting base asset, is taken by paragraph (1)(b) to be an MRRT year;

in working out, under paragraph (1)(b), the decline in value of the starting base asset during that part of an MRRT year, apply subsection (1) to that part of the MRRT year as if it were an entire MRRT year.

Example: Extending the example in subsection (1), the miner sells half of its remaining interest in the truck halfway through the second half of the MRRT year. At the time of this sale, the adjustable value of the miners 25% interest in the truck is $2,312,500, so the adjustable value of the disposed asset on this occasion is $1,156,250 (50% of $2,312,500).

 The decline in value of the miners interest in the truck during the second half of the MRRT year is $93,750, being the sum of:

(a) for the first 3 months of the second half of the MRRT year, a decline in value of $62,500 ($2.375 million x 1/4 x 1/9.5); and

(b) for the remainder of the second half of the MRRT year, a decline in value of $31,250 ($1,156,250 x 1/4 x 1/9.25).

 (4) If:

 (a) under Division 85, the book value approach is the valuation approach for the mining project interest to which a *starting base asset relates; and

 (b) the decline in value of the starting base asset during a part of an *MRRT year is to be worked out under this section;

the write off rate of the starting base asset under section 9010 for that part of the MRRT year is taken to be the write off rate of the starting base asset under that section for the entire MRRT year.

16545  Reductions in starting base losses

 (1) This section applies if, on one or more occasions during an *MRRT year, section 16535 applies to a miner ceasing to *hold a part of a *starting base asset relating to a mining project interest that a miner has.

 (2) In working out under subsection 8040(3) or (4) any reduction in an amount of a *starting base loss for the mining project interest for the *MRRT year or a later MRRT year, treat the starting base asset as not including, after the cessation, the disposed asset (within the meaning of section 16535) relating to that cessation.

Note: Reductions happen under subsection 8040(3) or (4) if the asset is used, installed for use, or constructed for use for a purpose other than carrying on upstream mining operations relating to the mining project interest, or in connection with excluded expenditure.

Example: Using the example in subsection 16540(1), the miners starting base loss would be unaffected if, after the sale of the 75% interest in the truck, the purchaser used the truck for 75% of the time for a purpose that is entirely unrelated to the upstream mining operations for the mining project interest.

16550  Base value for the next MRRT year

  Section 9030 or 9050 applies in working out the *base value of the *starting base asset for the next *MRRT year as if the last part of the entire MRRT year for which a *decline in value was worked out under section 16540 were the preceding MRRT year.

Example: Using the example in subsection 16540(1), the preceding base value of the starting base asset for the purposes of section 9050 is $2.375 million ($9.5 million $7.125 million).

 If the market value approach is the applicable valuation approach, the base value of the starting base asset for the next *MRRT year would, under section 9050, be $1.75 million ($2.375 million $625,000).

Subdivision 165DMiscellaneous

Table of sections

16555 Use etc. of starting base assets for other mining project interests etc.

16560 Effect on base value of use etc. of starting base assets after starting base adjustment events

16555  Use etc. of starting base assets for other mining project interests etc.

Mining expenditure for use etc. leading to a reduction under subsection 8040(3)

 (1) If:

 (a) a *starting base loss, for an *MRRT year for a mining project interest that a miner has, is reduced under subsection 8040(3) in relation to a *starting base asset; and

 (b) the reason, or part of the reason, for the reduction is that the starting base asset was:

 (i) used; or

 (ii) *installed ready for use; or

 (iii) being constructed for use;

  in carrying on *upstream mining operations relating to another mining project interest that the miner has, or in carrying on *premining project operations of a *premining project interest that the miner *holds;

an amount is included in the miners *mining expenditure for the other mining project interest, or *premining expenditure for the premining project interest, for the MRRT year.

 (2) The amount is the amount of that reduction, to the extent that:

 (a) the reduction happens for that reason; and

 (b) the amount of the reduction would have been included:

 (i) in the miners *mining expenditure for the other mining project interest, for the *MRRT year, if it had been incurred by the miner to acquire the *starting base asset in relation to the other mining project interest; or

 (ii) in the miners *premining expenditure for the *premining project interest, for the MRRT year, if it had been incurred by the miner to acquire the starting base asset in relation to the premining project interest.

Mining expenditure for use etc. after a starting base adjustment event

 (3) If:

 (a) at a particular time (the adjustment time) during an *MRRT year, a *starting base adjustment event happened for a *starting base asset relating to a mining project interest that a miner has; and

 (b) the starting base adjustment event happened other than because the miner ceased to *hold the *starting base asset; and

 (c) after the adjustment time (whether during that MRRT year or a later MRRT year) the starting base asset was:

 (i) used; or

 (ii) *installed ready for use; or

 (iii) being constructed for use;

  in carrying on *upstream mining operations relating to another mining project interest that the miner has, or in carrying on *premining project operations of a *premining project interest that the miner holds;

an amount is included in the miners *mining expenditure for the other mining project interest, or *premining expenditure for the premining project interest, for the first MRRT year to which paragraph (c) applies.

 (4) The amount is the *termination value of the *starting base asset, to the extent that:

 (a) the starting base asset was, during the first *MRRT year to which paragraph (3)(c) applies:

 (i) used; or

 (ii) *installed ready for use; or

 (iii) being constructed for use;

  in carrying on *upstream mining operations relating to the other mining project interest, or in carrying on *premining project operations of the *premining project interest; and

 (b) the amount of the termination value would have been included:

 (i) in the miners *mining expenditure for the other mining project interest, for that MRRT year, if it had been incurred by the miner to acquire the starting base asset in relation to the other mining project interest; or

 (ii) in the miners *premining expenditure for the premining project interest, for that MRRT year, if it had been incurred by the miner to acquire the starting base asset in relation to the premining project interest.

Exceptions

 (5) Despite subsections (1) and (3), this section does not apply:

 (a) in relation to the other mining project interest if the *starting base asset is also a starting base asset in relation to the other mining project interest; or

 (b) in relation to the *premining project interest if the starting base asset would also be a starting base asset in relation to another mining project interest that could *originate from the premining project interest.

16560  Effect on base value of use etc. of starting base assets after starting base adjustment events

  Despite sections 9030 and 9050, if:

 (a) during an *MRRT year, a *starting base adjustment event happened for a *starting base asset relating to a mining project interest that a miner has; and

 (b) the starting base adjustment event happened other than because the miner ceased to *hold the *starting base asset; and

 (c) during a later MRRT year in which the miner holds the starting base asset, it starts to be:

 (i) used; or

 (ii) *installed ready for use; or

 (iii) being constructed for use;

  in carrying on *upstream mining operations relating to the mining project interest;

the base value of the starting base asset, for the first MRRT year after the time at which the starting base adjustment event happened, is taken to be its *termination value at that time.

Note: The base values of the starting base asset for later MRRT years will be worked out under section 9030 (book value approach) or 9050 (market value approach).

Part 44Valuation

Division 170Valuation principles

Guide to Division 170

1701  What this Division is about

This Division sets out valuation principles that are to be applied in working out the value of a thing for the purposes of the MRRT.

Table of sections

Operative provisions

1705 Valuations to comply with valuation principles

17010 The valuation principles

Operative provisions

1705  Valuations to comply with valuation principles

 (1) The value of a thing that is to be valued for the purposes of working out an amount under the *MRRT law is to be worked out in accordance with the valuation principles set out in section 17010.

Note: The following are some examples of things that may be valued:

(a) a starting base asset (to work out a starting base loss);

(b) a mining project interest or premining project interest (to work out a split percentage).

 (2) Subsection (1) is a general rule that is subject to the specific rules in the *MRRT law outside this Division.

 (3) To avoid doubt, subsection (1) applies:

 (a) whether or not a provision of the *MRRT law requires a thing to be valued at its *market value; and

 (b) whether or not a provision of the MRRT law expressly requires an amount to be worked out by making a valuation.

17010  The valuation principles

Basic principle

 (1) A valuation relating to a mining project interest or *premining project interest is to be reasonable having regard to the objects of the *MRRT law.

Subprinciples

 (2) A valuation that is to be made as at a particular time may take into account:

 (a) things that have actually happened before that time; and

 (b) things that, as at that time, are reasonably expected to happen after that time.

Example: A valuation of the rights and interests that constitute a mining project interest as at a particular time may take account of a reasonable estimate, as at that time, of the coal price at a future time. The actual coal price at that future time is not taken into account.

 (3) The sum of the values of all things in a set must equal the value of the set.

Example: A mining operation is valued as at 1 May 2010 at $6 billion. Downstream assets (such as crushers and transport infrastructure) are valued at $2 billion. Upstream capital equipment is valued at $1 billion. The value of all other assets in the operation, including mining rights, must be $3 billion.

 (4) Identical things in identical circumstances have the same value.

 (5) An assumption or estimate relating to a mining project interest or *premining project interest:

 (a) is to be reasonable when considered in isolation; and

 (b) is to be reasonable when considered together with all other assumptions or estimates made in relation to the interest; and

 (c) is to be made consistently for all things relating to the interest.

Example 1: An estimate of a commodity price at a future time must itself be reasonable, and must also be reasonable when considered together with all other assumptions or estimates about things that may affect the commodity price (such as a currency exchange rate).

Example 2: If the value of a mine is worked out on the assumption that mine production will rise to a particular extent over time, the valuation of each asset within the project must use a consistent assumption.

 (6) A valuation relating to a mining project interest or *premining project interest is to be reconcilable with each other valuation made relating to the interest (including, if relevant, a valuation relating to a premining project interest from which a mining project interest *originates), if that other valuation:

 (a) was made after 1 May 2010; and

 (b) was made for the purposes of working out an amount under the *MRRT law; and

 (c) is, if it is a valuation of a thing of which there is more than one valuation meeting the requirements in paragraphs (a) and (b), the most recent such valuation.

Priority of basic principle

 (7) To the extent the application of a subprinciple in subsections (2) to (6) to a particular valuation would conflict with the basic principle in subsection (1), the basic principle is to be applied and the subprinciple disregarded.

Division 175Alternative valuation method

Table of Subdivisions

 Guide to Division 175

175A Object of this Division

175B Choosing to use the alternative valuation method

175C Amounts included in mining revenue under the alternative valuation method

Guide to Division 175

1751  What this Division is about

A miner that extracts only small amounts of taxable resources, or that has a preMRRT operation for transforming those taxable resources, can choose to use the alternative valuation method. This method is a version of the “retail price” or “netback” method.

Under this method, mining revenue for supply, exportation or use of taxable resources is worked out from the miner’s transactions relating to the taxable resources, with appropriate reductions for downstream operating costs, depreciation and returns on capital.

A mining project interest for which the alternative valuation method is used is treated separately from other mining project interests, and its royalty credits and mining losses are quarantined.

Note: Under sections 6520 and 10020, royalty credits are not available to be applied to transferred royalty allowances, and mining losses are not available to be applied to transferred mining loss allowances, if the alternative valuation method has been chosen.

Subdivision 175AObject of this Division

Table of sections

1755 Object of this Division

1755  Object of this Division

  The object of this Division is to provide an alternative method to work out *mining revenue under section 3010, so as to reduce compliance costs and increase certainty for miners that may find it particularly difficult to work out that revenue using that section, because:

 (a) their mining operations are small; or

 (b) since before 2 May 2010, their mining operations have been vertically integrated with other operations.

Subdivision 175BChoosing to use the alternative valuation method

Table of sections

17510 Choosing to use the alternative valuation method

17515 Group production of taxable resources

17510  Choosing to use the alternative valuation method

 (1) A miner may choose to use the alternative valuation method in relation to a mining project interest that the miner has, for an *MRRT year, if either or both of the following apply:

 (a) group production of *taxable resources for the miner for that year under section 17515 is less than 10 million tonnes;

 (b) taxable resources extracted during the year from the *project area for the mining project interest are used as part of an operation that:

 (i) is for *supplying things (other than taxable resources) produced using a taxable resource extracted under the authority of a *production right to which the project area relates; and

 (ii) existed in *Australia just before 2 May 2010; and

 (iii) the miner carries on (whether alone or jointly with other *entities).

Note: Division 119 in Schedule 1 to the Taxation Administration Act 1953 is about choices under the MRRT law.

 (2) Each choice that the miner makes must relate to:

 (a) a single mining project interest that the miner has; and

 (b) a single *MRRT year.

17515  Group production of taxable resources

 (1) The group production of *taxable resources mentioned in paragraph 17510(1)(a) for the miner, for an *MRRT year, is the number of tonnes of taxable resources that:

 (a) relate to mining project interests the following *entities have, or *premining project interests that they *hold:

 (i) the miner;

 (ii) an entity *connected with the miner;

 (iii) an *affiliate of the miner;

 (iv) an entity of which the miner is an affiliate;

 (v) an affiliate of an entity covered by subparagraph (ii);

 (vi) an entity connected with an entity covered by subparagraph (ii), (iii) or (iv); and

 (b) have reached, during the MRRT year, the form in which the resources are intended to be:

 (i) supplied or exported as mentioned in paragraph 3015(1)(a) or (b); or

 (ii) used to produce something, but not after having been supplied or exported as mentioned in paragraph 3015(1)(a) or (b).

Note: If the MRRT year is not a 12month period, the group production of taxable resources is affected by section 19020 (substituted accounting periods).

 (2) For the purposes of subsection (1), the number of tonnes of a *taxable resource is to be calculated when the resource is in the form mentioned in paragraph (1)(b).

 (3) If:

 (a) subsection (1) applies in relation to a *taxable resource; and

 (b) the taxable resource is a quantity of something produced from a process that results in iron ore or coal being consumed or destroyed without extraction;

treat as the number of tonnes of that resource, for the purposes of this section, the number of tonnes of iron ore or coal that was so consumed or destroyed.

Subdivision 175CAmounts included in mining revenue under the alternative valuation method

Table of sections

17520 When amounts are included in mining revenue under the alternative valuation method

17525 How to work out the single amount

17530 Unadjusted revenue amounts

17535 Downstream operating costs

17540 Depreciation of assets

17545 Return on capital costs

17520  When amounts are included in mining revenue under the alternative valuation method

 (1) If a miner chooses, for an *MRRT year, to use the alternative valuation method in relation to a mining project interest that the miner has, a single amount is included under section 3010, in the miner’s *mining revenue for the interest for the year, relating to all amounts that:

 (a) are to be included in the miner’s mining revenue for the mining project interest for the year under section 3010; and

 (b) relate to *taxable resources that, under subsection (2) of this section, are covered by the alternative valuation method for the MRRT year.

The single amount is worked out under section 17525, instead of section 3025.

 (2) The alternative valuation method covers *taxable resources for the mining project interest for the year if an amount is included in the miner’s *mining revenue for the mining project interest for the *MRRT year under section 3010 because a *mining revenue event happens in relation to the resource.

17525  How to work out the single amount

  Work out the single amount to be included under section 3010, in a miner’s *mining revenue for a mining project interest for an *MRRT year, as follows:

Method statement

Step 1. For each of the *taxable resources covered by the alternative valuation method for the interest for the year, work out the unadjusted revenue amount under section 17530.

Step 2. Add together all of the unadjusted revenue amounts for the *taxable resources covered by the alternative valuation method for the interest for the year.

Step 3. Add together all of the following amounts:

 (a) the miner’s downstream operating costs, worked out under section 17535, for the interest for the year;

 (b) the sum of the amounts, worked out under section 17540, by which the assets of the miner relating to the interest, to which that section applies, have depreciated in value during the year;

 (c) a return on the miner’s capital costs for the interest for the year, worked out under section 17545.

Step 4. Reduce the amount under step 2 by the amount under step 3. The result is the single amount to be included in the miner’s *mining revenue for the mining project interest for the year.

17530  Unadjusted revenue amounts

  The unadjusted revenue amount for a *taxable resource covered by the alternative valuation method for the *MRRT year is:

 (a) if the amount relates to a *supply—the consideration received or receivable for the supply; or

 (b) if the amount relates to an exportation from *Australia of the taxable resource, or a thing produced using the taxable resource—an amount